i) L = -------------- X ------ Io 100 R x (W - Wo) Q ii) M = ----------------- X ------ Wo 100 R x (F - Fo) Z iii) U = ---------------- X ------ Fo 100 R x (E - Eo) S iv) X = ----------------- X ------ Eo 100 R x (D - Do) T v) N = ----------------- X ------ Do 100 L - Amount of price variation in labour. M - Amount of price variation in materials. U - Amount of price variation in fuel. X - Amount of price variation in explosive. N - Amount of price variation in detonators. R - Gross value of the work done by the contractor as per on account bill(s) excluding cost of materials supplied by Railway at fixed price. This will also exclude specific payment, if any, to be made to the consultant engaged by the contractors (such payment will be indicated in the contractor's offer). Io - Consumer price Index Number for Industrial Workers - All India - Published in R.B.I. Bulletin for the base period. I - Consumer price Index Number for Industrial Workers. - All India - Published in R.B.I. Bulletin for the average price Index of 3 months of the quarter under consideration. Wo - Index Number of wholesale prices By groups and Sub-Groups - All commodities - as published in the R. B.I. Bulletin for the base period. OS/Works 62
W - Index Number of wholesale prices By groups and Sub-Groups-All commodities as published in the R. B. I. Bulletin of the average price index of 3 months of the quarter under consideration. Fo - Index Number of wholesale prices By Groups and sub-Groups - for Fuel, Power, Light and lubricants as published in the R.B.I. Bulletin for base period. F - Index Number of wholesale prices By Groups for fuel, power, light and lubricants as published in R.B.I. Bulletin for the average price Index of 3 months of the quarter under consideration. Eo - Cost of explosives as fixed by DGS&D in the relevant rate contract of the firm from whom purchases of explosives are made by the contractor for the base period. E - Cost of explosives as fixed by DGS&D in the relevant rate contract of the firm from whom purchases of explosives are made by the contractor for the average price index of 3 months of the quarter under consideration. Do - Cost of detonators as fixed by DGS&D in the relevant rate contract of the firm from whom purchases of detonators are made by the contractor for the base period. D - Cost of detonators as fixed by DGS&D in the relevant rate contract of the firm from whom purchases of detonators are made by the contractor for the average price index of 3 months of the quarter under consideration. P - Q - Z - S - T - NOTE: % of labour component. % of material component % of Fuel component. % of explosives component. % of detonators component. The index number for the base period will be the index number as obtained for the month of opening of the tender and the quarters will commence from the month following the month of opening of tender. If the rates quoted in the Negotiated tender are accepted, the base month for the ‘Price Variation Clause’ will be the month in which Negotiations are held. OS/Works 63
- Page 11 and 12: 2 lakhs plus ½ % (half percent) of
- Page 13 and 14: laws, ordinance, rules and regulati
- Page 15 and 16: 5.2 (a) The successful bidder may g
- Page 17 and 18: 7.0 STUDY OF DRAWINGS AND LOCAL CON
- Page 19 and 20: 9.3.1 The contractor shall work in
- Page 21 and 22: the non-schedule items quoted by th
- Page 23 and 24: him/them for plying his/their vehic
- Page 25 and 26: may be for highly skilled, semi ski
- Page 27 and 28: Land for setting up a workshop by t
- Page 29 and 30: A minimum value addition of 20% by
- Page 31 and 32: Annexure-B SUPPLEMENTARY AGREEMENT
- Page 33 and 34: Annexure-D CONSTITUTION OF THE FIRM
- Page 35 and 36: Annexure -F LIST OF ENGINEERS/PERSO
- Page 37 and 38: Annexure - H Statement of works bei
- Page 39 and 40: FORM NO.E-5 FORMS Electronic Cleari
- Page 41 and 42: enforceable till all the dues of th
- Page 43 and 44: with up to date correction slips, N
- Page 45 and 46: 383-1970 and IS-515 & 516-1959. I.S
- Page 47 and 48: iii) For the purpose of levy of ces
- Page 49 and 50: 6.8 Railway may also take samples d
- Page 51 and 52: incurred by the contractor in conne
- Page 53 and 54: e so constructed that there are ade
- Page 55 and 56: 21.0 PLAIN/REINFORCED CEMENT CONCRE
- Page 57 and 58: 25.1.2 Batch mixers will be tested
- Page 59 and 60: place before the labour proceeds fo
- Page 61: 31.8 The contractor/s shall keep/ma
- Page 65 and 66: trailer tools and plants their spar
- Page 67 and 68: 3) Steel Register: - Verify & ensur
- Page 69 and 70: Verify the register recording the d
- Page 71 and 72: Railways or nay other departments o
- Page 73 and 74: NORTH CENTRAL RAILWAY SCHEDULE OF I
- Page 75 and 76: suspended floors , roofs etc 14 042
- Page 77 and 78: sand: 4 graded stone etc 44 108178
- Page 79 and 80: Indian Railway Project Management U
- Page 81 and 82: Hkkjrh; jsy ifj;kstuk izcU/ku bdkbZ
- Page 83: 1 Lkfpo Ikh-lh-bZ-@,u-vkj-] lh-,-vk
i) L = -------------- X ------<br />
Io 100<br />
R x (W - Wo) Q<br />
ii) M = ----------------- X ------<br />
Wo 100<br />
R x (F - Fo) Z<br />
iii) U = ---------------- X ------<br />
Fo 100<br />
R x (E - Eo) S<br />
iv) X = ----------------- X ------<br />
Eo 100<br />
R x (D - Do) T<br />
v) N = ----------------- X ------<br />
Do 100<br />
L<br />
- Amount of price variation <strong>in</strong> labour.<br />
M - Amount of price variation <strong>in</strong> materials.<br />
U - Amount of price variation <strong>in</strong> fuel.<br />
X - Amount of price variation <strong>in</strong> explosive.<br />
N - Amount of price variation <strong>in</strong> detonators.<br />
R - Gross value of the work done by the contractor as per on account bill(s)<br />
exclud<strong>in</strong>g cost of materials supplied by Railway at fixed price. This will also<br />
exclude specific payment, if any, to be made to the consultant engaged by<br />
the contractors (such payment will be <strong>in</strong>dicated <strong>in</strong> the contractor's offer).<br />
Io - Consumer price Index Number for Industrial Workers - All India - Published<br />
<strong>in</strong> R.B.I. Bullet<strong>in</strong> for the base period.<br />
I - Consumer price Index Number for Industrial Workers. - All India - Published<br />
<strong>in</strong> R.B.I. Bullet<strong>in</strong> for the average price Index of 3 months of the quarter<br />
under consideration.<br />
Wo - Index Number of wholesale prices By groups and Sub-Groups - All<br />
commodities - as published <strong>in</strong> the R. B.I. Bullet<strong>in</strong> for the base period.<br />
OS/Works 62