31.0 Labour:<br />

31.1 The pr<strong>in</strong>cipal Contractor/s will be held responsible for the compliance with<br />

provision of Wages Act 1936 and Rules framed there under even <strong>in</strong> respect of<br />

labour employed <strong>in</strong> his/their sub contractor <strong>in</strong> the execution of the work<br />

contracted by him/them.<br />

31.2 The contractor/s shall carry out the provision of any regulation that may be<br />

enforced <strong>in</strong> the area <strong>in</strong> which work is to be done prohibit<strong>in</strong>g the recruitment of<br />

local labour.<br />

31.3 The contractor/s shall obta<strong>in</strong> license from the appropriate licens<strong>in</strong>g officer of the<br />

area before commencement of the work and shall produce a copy there of along<br />

with the orig<strong>in</strong>al to the Dy. CE/IRPMU to start the work.<br />

31.4.1 In any case <strong>in</strong> which by virtue of relevant sections of the Contract Labour<br />

(Regulation and Abolition) Act 1970, the Railway is obliged to provide amenities<br />

and or pay wages to labour employed by the contractor or through petty<br />

contractor or sub contractor/s under this contract, then the contractor shall<br />

<strong>in</strong>demnify the Railway fully and Railway shall be entitled to recover from the<br />

contractor the expenditure <strong>in</strong>curred on provid<strong>in</strong>g the said amenities and or wages<br />

so paid by deduct<strong>in</strong>g it from the security deposit or from any sum due to the<br />

contractor (from the Railway) provided that if any dispute arises as to the<br />

expenditure <strong>in</strong>curred by the Railway or provisions of the said amenities, the<br />

decision of the Eng<strong>in</strong>eer shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g.<br />

31.4.2 The Contractor/s shall provide Rest Shelters, Latr<strong>in</strong>es and Ur<strong>in</strong>als, Wash<strong>in</strong>g<br />

facilities, First aid and Medical facilities strictly <strong>in</strong> accordance with the provision of<br />

relevant sections of Contractor Labour Central Rules-1989. If the contractor does<br />

not provide these facilities, with<strong>in</strong> the stipulated periods, the Railway will provide<br />

these and the cost of the same will be recovered from the contractor/s.<br />

31.5 The Railway will not take responsibility or make arrangements for Supply of Food<br />

Stuff to the contractor/s his/their staff or labourers.<br />

31.6 The contractor shall make his/their own arrangement at his/their own cost for<br />

supply of water to his/their staff and labour and the Railway under take no<br />

responsibility for supply of water to the contractor/s his/their staff or labour or for<br />

the work.<br />

31.7 The contractor shall take all precautionary measures <strong>in</strong> order to ensure<br />

protection of their own personal mov<strong>in</strong>g about or work<strong>in</strong>g on the Railway<br />

premises and shall have to conform to the Rules and Regulation of the North<br />

Central Railway. If unforeseen accident or <strong>in</strong>jury happens while on work<strong>in</strong>g the<br />

contractor shall be solely responsible for the same.<br />

OS/Works 60