observ<strong>in</strong>g these <strong>in</strong>structions, the Eng<strong>in</strong>eer may undertake the cur<strong>in</strong>g through<br />
another agency/ labour without any notice to the contractor at the cost of the<br />
contractor. The cost <strong>in</strong>curred along with <strong>in</strong>cidental charges of 2% and along with<br />
supervision charges 12.5% of the total cost will be debited to the contractor.<br />
Intimation of the employment of another agency, for cur<strong>in</strong>g will be given to the<br />
contractor as soon as possible. This <strong>in</strong>timation <strong>in</strong> writ<strong>in</strong>g to the contractor under<br />
the hand of the Eng<strong>in</strong>eer-<strong>in</strong>-charge of the work shall be conclusive evidence of<br />
the employment.<br />
28.0 CONTRACTOR’S SUPERVISION:<br />
28.1 The contractor shall be required to employ qualified technical person together<br />
with necessary supervis<strong>in</strong>g staff; dur<strong>in</strong>g provid<strong>in</strong>g tube wells and construction of<br />
pump houses, The contractor or his authorized representative, approved <strong>in</strong><br />
writ<strong>in</strong>g by Eng<strong>in</strong>eer shall be available at all times for supervision of the work &<br />
receiv<strong>in</strong>g directions, written communications sign<strong>in</strong>g site records on behalf of the<br />
contractor,. The contractor shall not change any of his supervisory staff<br />
employed on the work unless approved by Eng<strong>in</strong>eer <strong>in</strong>-charge of work.<br />
29.0 PROTECTION AND STEPS TO BE TAKEN IN ORDER TO AVOID.<br />
DANGERS TO RAILWAY INSTALLATIONS.<br />
a) At such of the locations where contractor/s road vehicle are permitted to ply<br />
adjacent to the runn<strong>in</strong>g l<strong>in</strong>es and yard, an experienced Track man shall be<br />
deputed as flagman at the cost of the contractor to prevent accidents. This factor<br />
should be borne <strong>in</strong> m<strong>in</strong>d by the contractor/s while formulat<strong>in</strong>g the rates.<br />
b) The contractor shall take all precautionary measures <strong>in</strong> order to ensure<br />
protection of his own personnel mov<strong>in</strong>g about or work<strong>in</strong>g <strong>in</strong> the railway premises<br />
and shall have to conform to the rules and regulations of North Central Railway.<br />
If any unforeseen accident or <strong>in</strong>jury happens while on work<strong>in</strong>g, the contractor<br />
shall be solely responsible for the same.<br />
c) The Contractors shall see that no change is caused to Railway signall<strong>in</strong>g and<br />
transmission wire, stations, <strong>in</strong>stallation, communication l<strong>in</strong>es, electric devices,<br />
tra<strong>in</strong>s of any k<strong>in</strong>d, fenc<strong>in</strong>g, as well as any roll<strong>in</strong>g stock and <strong>in</strong> general to all<br />
railway <strong>in</strong>stallation and equipment <strong>in</strong> case of any damage is caused to these due<br />
to the fault of the contractor on the part of any one on his behalf all repairs there<br />
required will be carried out by the railway at the entire cost of the contractor and<br />
amount of expenses thus <strong>in</strong>curred will be recovered from the payment due to<br />
him.<br />
d) The contractor shall be responsible for safe custody of tools and for the safety of<br />
his labour. He should ensure that labour no work removes their tools after the<br />
day work,. The contractor should ensure that the tools are deposited <strong>in</strong> proper<br />
OS/Works 58