18.6 Wherever chamfer or rounded corners are mentioned <strong>in</strong> the draw<strong>in</strong>g formwork,<br />

should be such that no chisell<strong>in</strong>g/ cutt<strong>in</strong>g is required. The surface of formwork<br />

should be clear, smooth and free of cement mortar.<br />

18.7 The Contractor shall give the Eng<strong>in</strong>eer In-charge sufficient notice <strong>in</strong> advance<br />

before plac<strong>in</strong>g any concrete <strong>in</strong> the forms to permit him to <strong>in</strong>spect and accept the<br />

false work and forms as to their strength, alignment and general fitness but such<br />

<strong>in</strong>spection shall not relieve the contractor of his responsibility for safety of works,<br />

men, mach<strong>in</strong>ery, materials and for result obta<strong>in</strong>ed.<br />

19.0 REMOVAL OF FORM WORK:<br />

19.1 The Eng<strong>in</strong>eer-In-Charge shall be <strong>in</strong>formed <strong>in</strong> advance by the contractor of his<br />

<strong>in</strong>tention While fix<strong>in</strong>g the time for removal of form work, due consideration shall be<br />

given to the local conditions, character of the structure, the weather and the other<br />

conditions that <strong>in</strong>fluence the sett<strong>in</strong>g of concrete and of the material used <strong>in</strong> the<br />

mixes to strike any formwork.<br />

19.2 The period shall be suitably <strong>in</strong>creased <strong>in</strong> case of temperature lower than 25<br />

degree Celsius and for any other conditions tend<strong>in</strong>g to delay the sett<strong>in</strong>g of<br />

concrete.<br />

19.3 These field operation are controlled by strength tests of concrete. The removal of<br />

the load support<strong>in</strong>g arrangements of soffit may commence when concrete has<br />

atta<strong>in</strong>ed 70% characteristic strength, at the time of strik<strong>in</strong>g props <strong>in</strong>clud<strong>in</strong>g the<br />

effect of any further additions of loads. When field operations are not controlled by<br />

strength, test of the concrete, the vertical forms of beams, columns & walls may<br />

be removed as per orders of the Eng<strong>in</strong>eer- In-charge.<br />

19.4 For pre-stressed units the side forms shall be released as early as possible after<br />

12 hours of cast<strong>in</strong>g and so fit forms shall be permitted without restra<strong>in</strong>t<br />

deformation of the member when pre-stressed is applied.<br />

19.5 All formwork shall be removed without caus<strong>in</strong>g any damage to be concrete.<br />

Centr<strong>in</strong>g shall be gradually and uniformly lowered <strong>in</strong> such a manner as to avoid<br />

any shock or vibrations. Supports shall be removed <strong>in</strong> such a manner as to<br />

permit concrete to take stress due to its own weight uniformly and gradually.<br />

Where <strong>in</strong>ternal metal ties are permitted, their removable parts shall be extracted<br />

without caus<strong>in</strong>g any damage to the concrete and the rema<strong>in</strong><strong>in</strong>g holes filled with<br />

mortar. No permanently embedded metal parts shall have less than 40mm cover<br />

to the f<strong>in</strong>ished concrete surfaces, where it is <strong>in</strong>tended to re-use released form<br />

work, it shall be cleaned and make good to the satisfaction of Eng<strong>in</strong>eer-<strong>in</strong>charge.<br />

20.0 MEASUREMENT:<br />

20.1 All work will be paid for at the tendered rates on the basis of actual<br />

measurements taken at site. Individual rate for each non-schedule item should<br />

be fore complete f<strong>in</strong>ished work, <strong>in</strong>clusive of all operational charges. Noth<strong>in</strong>g extra<br />

will be payable on any account.<br />

OS/Works 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!