e so constructed that there are adequate facilities for climb<strong>in</strong>g on the top of the<br />
same with proper work<strong>in</strong>g space for conduct<strong>in</strong>g theodolite work. Necessary<br />
base/reference l<strong>in</strong>es and pillars as & where required for sett<strong>in</strong>g out of the bridge<br />
and execution work are also to be constructed and ma<strong>in</strong>ta<strong>in</strong>ed by contractor<br />
without any extra cost as per directions of the Eng<strong>in</strong>eer-<strong>in</strong>-charge.<br />
17.0 BARRICADING:<br />
17.1 The contractor before start<strong>in</strong>g the construction work along the runn<strong>in</strong>g l<strong>in</strong>e shall<br />
have to barricade the entire length of runn<strong>in</strong>g l<strong>in</strong>e along which the work has to be<br />
carried out. Barricad<strong>in</strong>g will also be done at all location where contractor’s vehicle<br />
will ply along the track. Barricad<strong>in</strong>g has to be done as per approved plan and to<br />
the entire satisfaction of the Eng<strong>in</strong>eer-<strong>in</strong>-charge.. Contractor has to take<br />
precaution that the barricad<strong>in</strong>g should not fall towards the railway runn<strong>in</strong>g l<strong>in</strong>e.<br />
Payment for barricad<strong>in</strong>g will be made under relevant NS-item.<br />
18.0 FORM WORK:<br />
18.1 Form work shall be of steel plates of m<strong>in</strong>imum 3.0mm thick fixed on the angle<br />
iron frame or waterproof ply wood shutter<strong>in</strong>g of adequate thickness unless<br />
otherwise directed by the Eng<strong>in</strong>eer-<strong>in</strong>- charge. It should be watertight, sufficiently<br />
strong and rigid to resist forces caused by vibration and <strong>in</strong>cidental loads<br />
associated with it and keep the form rigid.<br />
18.2 If the work is to be executed <strong>in</strong> close proximity of runn<strong>in</strong>g track, the shutter<strong>in</strong>g<br />
should be so planned so as not to <strong>in</strong>fr<strong>in</strong>ge with schedule of m<strong>in</strong>imum mov<strong>in</strong>g<br />
dimension, B.G of 1963 (1973 repr<strong>in</strong>t). Shutter<strong>in</strong>g should be of self-support<strong>in</strong>g<br />
nature as no centr<strong>in</strong>g or propp<strong>in</strong>g will be permitted on the runn<strong>in</strong>g track side.<br />
18.3 Work shall be executed without disturb<strong>in</strong>g the exist<strong>in</strong>g position of runn<strong>in</strong>g track as<br />
shown <strong>in</strong> plan and entire work should be planned accord<strong>in</strong>gly.<br />
18.4 If at any stage of work dur<strong>in</strong>g/ after plac<strong>in</strong>g the concrete <strong>in</strong> the structure, the work<br />
is found defective, such concrete shall be removed and work shall be redone<br />
with fresh concrete at the cost of contractor. The props for the centr<strong>in</strong>g wherever<br />
permitted shall be supported by the double wedges <strong>in</strong> order to facilitate caus<strong>in</strong>g<br />
& removal of the shutter<strong>in</strong>g without jarr<strong>in</strong>g. Centr<strong>in</strong>g and shutter<strong>in</strong>g should be<br />
carefully released <strong>in</strong> order to prevent the load<strong>in</strong>g be<strong>in</strong>g <strong>in</strong>stantly transferred to<br />
concrete. The period that shall lapse after the last pour of concrete for eas<strong>in</strong>g<br />
removal of centr<strong>in</strong>g and shutter<strong>in</strong>g shall be fixed by the Eng<strong>in</strong>eer-<strong>in</strong>-charge and<br />
will be b<strong>in</strong>d<strong>in</strong>g on the contractor/s.<br />
18.5 It may be necessary to make provision for holes/ grooves <strong>in</strong> the form work to<br />
house the various services, for which neither any extra payment shall be made to<br />
the contractor/s for mak<strong>in</strong>g these provisions nor any deduction shall be made on<br />
a/c of any sav<strong>in</strong>g <strong>in</strong> RCC work due to these provision.<br />
OS/Works 53