01.02.2015 Views

Tender Document - irpmu.railnet.gov.in

Tender Document - irpmu.railnet.gov.in

Tender Document - irpmu.railnet.gov.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

It may clearly be noted that the CAO/IRPMU/ Dy Chief Eng<strong>in</strong>eer/IRPMU shall<br />

have full power to make alterations <strong>in</strong> the draw<strong>in</strong>gs and to give such further<br />

<strong>in</strong>struction directions as may appear to him necessary for the guidance of the<br />

contractor and for the officials for execution, completion and ma<strong>in</strong>tenance of the<br />

work, if required dur<strong>in</strong>g execution of the work.<br />

The plan, sites and items of work are subject to alterations to suit the local<br />

conditions as per requirement of the Railway and the contractors will have no<br />

claim on account of the change <strong>in</strong> plan, sites and items of work etc.<br />

6.0 CEMENT:<br />

6.1 Portland Pozolona cement grade-33/43 conform<strong>in</strong>g to IS: 8112 capable of<br />

achiev<strong>in</strong>g the required Design concrete strength shall only be used, If contractor<br />

desire to use ready factory made blended cement with the precautions regard<strong>in</strong>g<br />

cur<strong>in</strong>g and limitations with the specific approval of Dy, Chief Eng<strong>in</strong>eer.<br />

6.2 To improve the workability of concrete admixtures conform<strong>in</strong>g to IS: 6925 AND is:<br />

9103 could be permitted subject to satisfactory proven use. Admixtures<br />

generat<strong>in</strong>g hydrogen, nitrogen, chlorides etc, shall not be used.<br />

6.3 Cement content <strong>in</strong> concrete for PSC work shall neither be less than 400 kg/cum<br />

of concrete nor more than 500 kg/cum of concrete <strong>in</strong> design mix.<br />

6.4 Quality test certificate for cement from manufacturer as per IS Code shall be<br />

produced by the contractor before use of Cement supplied.<br />

6.5 The contractor shall procure cement for use <strong>in</strong> the works from the ma<strong>in</strong><br />

producers or their authorized dealers only.<br />

6.6 Cement older than 6 weeks from the date of manufacture as marked on the bags<br />

shall not be accepted. Cement bags preferably <strong>in</strong> HDPE bags pack<strong>in</strong>g should<br />

bear the follow<strong>in</strong>g mark<strong>in</strong>gs:-<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

Manufacturer’s Name<br />

Registered trademark of manufacturer, if any.<br />

Type of cement.<br />

Weight of each bad <strong>in</strong> Kg or No. of Bags/Tonne.<br />

Time/Period of manufacture generally marked as week of the year/year of<br />

manufacture.<br />

6.7 Every delivery of cement shall be accompanied by a producer’s certificate<br />

confirm<strong>in</strong>g that the supplied cement conforms to relevant specifications, Every<br />

consignment of cement must have identification marks on packages <strong>in</strong>dicat<strong>in</strong>g<br />

date of manufactur<strong>in</strong>g and grade and type of cement.<br />

OS/Works 48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!