01.02.2015 Views

Tender Document - irpmu.railnet.gov.in

Tender Document - irpmu.railnet.gov.in

Tender Document - irpmu.railnet.gov.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

iii)<br />

For the purpose of levy of cess, cost of construction shall <strong>in</strong>clude all<br />

expenditure <strong>in</strong>curred by an employer <strong>in</strong> connection with the build<strong>in</strong>g or<br />

other construction work but shall not <strong>in</strong>clude.<br />

a) Cost of land; and<br />

b) Any compensation paid or payable to a worker or his <strong>in</strong> under the<br />

Workmen’s Compensation Act, 1923.<br />

iv)<br />

Every build<strong>in</strong>g worker who has been engaged <strong>in</strong> any build<strong>in</strong>g or other<br />

construction work for not less than 90 days dur<strong>in</strong>g the preced<strong>in</strong>g twelve<br />

months is required to be registered as a beneficiary under this Act.<br />

v) This will be applicable from the date of receipt of notice from State Labour<br />

Commissioner/Labour Deptt.<br />

With a view to enabl<strong>in</strong>g Railways <strong>in</strong> the implementation of the provisions of the<br />

two Acts, M<strong>in</strong>istry of Railways have decided that the <strong>Tender</strong> Notice/ <strong>Tender</strong><br />

documents may <strong>in</strong>clude a new clause as follows:-<br />

“The tenderer for carry<strong>in</strong>g out any construction work <strong>in</strong> -------------(name of the<br />

State) must get themselves registered from the Register<strong>in</strong>g Officer under<br />

Section-7 of the Build<strong>in</strong>g and Other Construction Workers Act, 1996 and rules<br />

made thereto by the -----------(Name of the State) Govt and submit certificate of<br />

Registration issued from the Register<strong>in</strong>g Officer of the --------------------(name of<br />

the State) Govt. (Labour Deptt.). For enactment of this Act, the tenderer shall be<br />

required to pay cess @ 1% of cost of construction work to be deducted from<br />

each bill. Cost of material shall be outside the purviews of cess, when supplied<br />

under a separate schedule item.”<br />

4.0 PLAN UNDER WHICH THE WORKS ARE TO BE CARRIED OUT:<br />

4.1 The draw<strong>in</strong>gs for the works can be seen <strong>in</strong> the officer of Dy Chief Eng<strong>in</strong>eer/IRPMU,<br />

Shivaji Bridge/North Central Railway, New Delhi. These draw<strong>in</strong>gs are meant for<br />

general guidance only and <strong>in</strong> terms of clause 7 of Special tender conditions and<br />

Instruction to <strong>Tender</strong>er/s, Railway may suitably modify them, without mak<strong>in</strong>g the<br />

Railway’s liable for any claims on account of such changes or delay <strong>in</strong><br />

modification of the plan.<br />

5.0 SUPPLY OF DRAWINGS:<br />

The Railway, dur<strong>in</strong>g the course of execution of work may supply detailed work<strong>in</strong>g<br />

draw<strong>in</strong>g if required by the agency/Contractor.<br />

OS/Works 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!