iii)<br />
For the purpose of levy of cess, cost of construction shall <strong>in</strong>clude all<br />
expenditure <strong>in</strong>curred by an employer <strong>in</strong> connection with the build<strong>in</strong>g or<br />
other construction work but shall not <strong>in</strong>clude.<br />
a) Cost of land; and<br />
b) Any compensation paid or payable to a worker or his <strong>in</strong> under the<br />
Workmen’s Compensation Act, 1923.<br />
iv)<br />
Every build<strong>in</strong>g worker who has been engaged <strong>in</strong> any build<strong>in</strong>g or other<br />
construction work for not less than 90 days dur<strong>in</strong>g the preced<strong>in</strong>g twelve<br />
months is required to be registered as a beneficiary under this Act.<br />
v) This will be applicable from the date of receipt of notice from State Labour<br />
Commissioner/Labour Deptt.<br />
With a view to enabl<strong>in</strong>g Railways <strong>in</strong> the implementation of the provisions of the<br />
two Acts, M<strong>in</strong>istry of Railways have decided that the <strong>Tender</strong> Notice/ <strong>Tender</strong><br />
documents may <strong>in</strong>clude a new clause as follows:-<br />
“The tenderer for carry<strong>in</strong>g out any construction work <strong>in</strong> -------------(name of the<br />
State) must get themselves registered from the Register<strong>in</strong>g Officer under<br />
Section-7 of the Build<strong>in</strong>g and Other Construction Workers Act, 1996 and rules<br />
made thereto by the -----------(Name of the State) Govt and submit certificate of<br />
Registration issued from the Register<strong>in</strong>g Officer of the --------------------(name of<br />
the State) Govt. (Labour Deptt.). For enactment of this Act, the tenderer shall be<br />
required to pay cess @ 1% of cost of construction work to be deducted from<br />
each bill. Cost of material shall be outside the purviews of cess, when supplied<br />
under a separate schedule item.”<br />
4.0 PLAN UNDER WHICH THE WORKS ARE TO BE CARRIED OUT:<br />
4.1 The draw<strong>in</strong>gs for the works can be seen <strong>in</strong> the officer of Dy Chief Eng<strong>in</strong>eer/IRPMU,<br />
Shivaji Bridge/North Central Railway, New Delhi. These draw<strong>in</strong>gs are meant for<br />
general guidance only and <strong>in</strong> terms of clause 7 of Special tender conditions and<br />
Instruction to <strong>Tender</strong>er/s, Railway may suitably modify them, without mak<strong>in</strong>g the<br />
Railway’s liable for any claims on account of such changes or delay <strong>in</strong><br />
modification of the plan.<br />
5.0 SUPPLY OF DRAWINGS:<br />
The Railway, dur<strong>in</strong>g the course of execution of work may supply detailed work<strong>in</strong>g<br />
draw<strong>in</strong>g if required by the agency/Contractor.<br />
OS/Works 47