SPECIAL CONDITIONS RELATING TO SITE DATA AND SPECIFICATIONS 1.0 Name of Work: “Construction of 16 nos. Auto Relay Huts for Automatic signalling between Manda Road to Mughal Sarai Station of ALD Division over NC Railway.” DETAILED SCOPE OF WORK: (i) Site clearance, removing and dismantling of all obstructions etc. before commencement of works as specified or as directed. (ii) Provision of all necessary labour, instruments and appliances in connection therewith as specified or as directed (iii) Earthwork in filling, injecting chemical emulsion for pre-constructional antitermite treatment. (iv) Building structural works. (v) All aspects of quality assurance, including testing of materials and other components of the work, as specified or as directed. (vi) Clearing of site and handling over of all the works, as specified or as directed. (vii) Maintenance of the completed work during the period as directed. (viii) Any other item of work as may be required to be carried out for completing the work under this contract in all respects in accordance with the provisions of the contract and / or to ensure the structural stability and safety during and after construction. The work shall be executed as per latest Railway specifications, and relevant, codes, details furnished in the tender documents and specifications and as per the best practices of the trade complete in all respect as per site condition. (ix) The value of the work shall be on item rates accepted in letter of acceptance subject to such additions thereto or deduction there form as may be made under the provisions of the contract. (x) The rates are inclusive of all materials/transport/labour/all taxes etc, for completion of work except otherwise specified in Bill of Quantities. 2.0 LOCATION OF WORK: The work required to be executed for “Construction of 16 nos. Auto Relay Huts for Automatic signalling between Manda Road to Mughal Sarai Station of ALD Division over NC Railway.” 3.0 Applicable Codes, Standards & Publications for Structural & Architectural Work. 3.1 The Work shall be executed as per Indian Railway Unified Standard Specifications (Works & Materials) Volume I & II Engineering Department 2010 and approved drawings, Indian Railways Unified Standard Schedule of Rates (Works & Materials) North Central Railway Allahabad Engineering Department 2010 OS/Works 42
with up to date correction slips, North Central Railway Engineering Department Regulations for Tender and Contracts, General Conditions of Contract - 2005 with correction slip issued up to date and relevant IRS/IRC/IS codes and circulars. 3.3 The design and construction will be done in terms of IRS, IRC and IS Specifications. a) The specifications mentioned herein bid documents shall be prime governing. b) Where there is conflict between IRS & IS Specifications, IRS Specifications shall prevail. c) Where there is no provision of specification in IRS, the IRS conditions shall be referred to and followed. d) For items not covered in IRS/IRC Specification, BS-5400 part 1 to 10 may be followed. e) The decision of CA0/IRPMU of the Project shall be final and binding in the interpretation of the clause of the codes of practice and specifications under the special Conditions regarding site Date and Specifications of this tender and no claim whatsoever shall be entertained on this account by Railways. Any difference of opinion between site engineer and contractor shall be referred to Engineer-in-charge of work. The appeal against Engineer-in-charge shall be with CAO/IRPMU/North Central Railway whose decision shall be final, Items under this scope shall be deemed to be Excepted Matters. Apart from the basic data, specifications etc, all items of works shall be governed by the following codes as revised/correct/amended up to the time of submission of the tender/negotiated cost for acceptance. The more important Codes, Standards and Publications to Contract are listed hereunder: IS:875 (part 3) IS:1322 IS:1893 IS:2572 IS:3414 IS:6408 (Para 1,2) IS:10958 IS:11817 Code of practice for design loads (other than earthquake) for buildings and structure Bitumen felts for water proofing and damp-proofing Criteria for earthquake resistant design of structures Code of Practice for construction of hollow concrete block masonry Code of practice for design and installation of joints in buildings Recommendations for modular co-ordination in building industry-tolerances General check list of functions of joints in buildings Classification of joints in buildings for accommodation of dimensional deviations during construction OS/Works 43
- Page 1 and 2: CONTENTS “Construction of 16 nos.
- Page 3 and 4: Tender Notice INDIAN RAILWAY PROJEC
- Page 5 and 6: c) I/We realize from my/our offer o
- Page 7 and 8: Officer/IRPMU, Shivaji Bridge, New
- Page 9 and 10: III. Cases where measurements have
- Page 11 and 12: 2 lakhs plus ½ % (half percent) of
- Page 13 and 14: laws, ordinance, rules and regulati
- Page 15 and 16: 5.2 (a) The successful bidder may g
- Page 17 and 18: 7.0 STUDY OF DRAWINGS AND LOCAL CON
- Page 19 and 20: 9.3.1 The contractor shall work in
- Page 21 and 22: the non-schedule items quoted by th
- Page 23 and 24: him/them for plying his/their vehic
- Page 25 and 26: may be for highly skilled, semi ski
- Page 27 and 28: Land for setting up a workshop by t
- Page 29 and 30: A minimum value addition of 20% by
- Page 31 and 32: Annexure-B SUPPLEMENTARY AGREEMENT
- Page 33 and 34: Annexure-D CONSTITUTION OF THE FIRM
- Page 35 and 36: Annexure -F LIST OF ENGINEERS/PERSO
- Page 37 and 38: Annexure - H Statement of works bei
- Page 39 and 40: FORM NO.E-5 FORMS Electronic Cleari
- Page 41: enforceable till all the dues of th
- Page 45 and 46: 383-1970 and IS-515 & 516-1959. I.S
- Page 47 and 48: iii) For the purpose of levy of ces
- Page 49 and 50: 6.8 Railway may also take samples d
- Page 51 and 52: incurred by the contractor in conne
- Page 53 and 54: e so constructed that there are ade
- Page 55 and 56: 21.0 PLAIN/REINFORCED CEMENT CONCRE
- Page 57 and 58: 25.1.2 Batch mixers will be tested
- Page 59 and 60: place before the labour proceeds fo
- Page 61 and 62: 31.8 The contractor/s shall keep/ma
- Page 63 and 64: W - Index Number of wholesale price
- Page 65 and 66: trailer tools and plants their spar
- Page 67 and 68: 3) Steel Register: - Verify & ensur
- Page 69 and 70: Verify the register recording the d
- Page 71 and 72: Railways or nay other departments o
- Page 73 and 74: NORTH CENTRAL RAILWAY SCHEDULE OF I
- Page 75 and 76: suspended floors , roofs etc 14 042
- Page 77 and 78: sand: 4 graded stone etc 44 108178
- Page 79 and 80: Indian Railway Project Management U
- Page 81 and 82: Hkkjrh; jsy ifj;kstuk izcU/ku bdkbZ
- Page 83: 1 Lkfpo Ikh-lh-bZ-@,u-vkj-] lh-,-vk
with up to date correction slips, North Central Railway Eng<strong>in</strong>eer<strong>in</strong>g Department<br />
Regulations for <strong>Tender</strong> and Contracts, General Conditions of Contract - 2005<br />
with correction slip issued up to date and relevant<br />
IRS/IRC/IS codes and circulars.<br />
3.3 The design and construction will be done <strong>in</strong> terms of IRS, IRC and IS<br />
Specifications.<br />
a) The specifications mentioned here<strong>in</strong> bid documents shall be prime <strong>gov</strong>ern<strong>in</strong>g.<br />
b) Where there is conflict between IRS & IS Specifications, IRS Specifications shall<br />
prevail.<br />
c) Where there is no provision of specification <strong>in</strong> IRS, the IRS conditions shall be<br />
referred to and followed.<br />
d) For items not covered <strong>in</strong> IRS/IRC Specification, BS-5400 part 1 to 10 may be<br />
followed.<br />
e) The decision of CA0/IRPMU of the Project shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g <strong>in</strong> the<br />
<strong>in</strong>terpretation of the clause of the codes of practice and specifications under the<br />
special Conditions regard<strong>in</strong>g site Date and Specifications of this tender and no<br />
claim whatsoever shall be enterta<strong>in</strong>ed on this account by Railways.<br />
Any difference of op<strong>in</strong>ion between site eng<strong>in</strong>eer and contractor shall be referred to<br />
Eng<strong>in</strong>eer-<strong>in</strong>-charge of work. The appeal aga<strong>in</strong>st Eng<strong>in</strong>eer-<strong>in</strong>-charge shall be with<br />
CAO/IRPMU/North Central Railway whose decision shall be f<strong>in</strong>al, Items under this<br />
scope shall be deemed to be Excepted Matters.<br />
Apart from the basic data, specifications etc, all items of works shall be <strong>gov</strong>erned by<br />
the follow<strong>in</strong>g codes as revised/correct/amended up to the time of submission of the<br />
tender/negotiated cost for acceptance.<br />
The more important Codes, Standards and Publications to Contract are listed<br />
hereunder:<br />
IS:875 (part 3)<br />
IS:1322<br />
IS:1893<br />
IS:2572<br />
IS:3414<br />
IS:6408 (Para 1,2)<br />
IS:10958<br />
IS:11817<br />
Code of practice for design loads (other than earthquake) for<br />
build<strong>in</strong>gs and structure<br />
Bitumen felts for water proof<strong>in</strong>g and damp-proof<strong>in</strong>g<br />
Criteria for earthquake resistant design of structures<br />
Code of Practice for construction of hollow concrete block<br />
masonry<br />
Code of practice for design and <strong>in</strong>stallation of jo<strong>in</strong>ts <strong>in</strong><br />
build<strong>in</strong>gs<br />
Recommendations for modular co-ord<strong>in</strong>ation <strong>in</strong> build<strong>in</strong>g<br />
<strong>in</strong>dustry-tolerances<br />
General check list of functions of jo<strong>in</strong>ts <strong>in</strong> build<strong>in</strong>gs<br />
Classification of jo<strong>in</strong>ts <strong>in</strong> build<strong>in</strong>gs for accommodation of<br />
dimensional deviations dur<strong>in</strong>g construction<br />
OS/Works 43