NORTH CENTRAL RAILWAY<br />
TENDER FORM (FIRST SHEET)<br />
The President of India,<br />
Act<strong>in</strong>g through<br />
Chief Adm<strong>in</strong>istrative Officer (IRPMU),<br />
Dy Chief Eng<strong>in</strong>eer (IRPMU)<br />
Shivaji Bridge, New Delhi.<br />
1. I/We _____________________________________________________have<br />
read the various conditions to tender attached here to and hereby agree to abide by the<br />
said conditions. I/We also agree to keep this tender open for acceptance for a period of<br />
90 days from the date fixed for open<strong>in</strong>g the same and <strong>in</strong> default thereof I/We will be<br />
liable for forfeiture of My/Our Earnest Money. I/We offer to do the work “Construction of<br />
16 nos. Auto Relay Huts for Automatic signall<strong>in</strong>g between Manda Road to Mughal Sarai<br />
Station of ALD Division over NC Railway”. for North Central Railway at the rates quoted<br />
<strong>in</strong> the attached schedule and hereby b<strong>in</strong>d myself/ourselves to complete the work <strong>in</strong> all<br />
respects with<strong>in</strong> 6 month from the date of issue of letter of acceptance of tender.<br />
2. I/We also hereby agree to abide by the General Condition of Contract-2005<br />
corrected up to date pr<strong>in</strong>ted/advance correction slip and to carry out the work<br />
accord<strong>in</strong>g to the Special Conditions of Contract and specifications for material<br />
and works as laid down by the Railway <strong>in</strong> the annexed Special<br />
Conditions/specifications and the North Central Railway Works Hand Book<br />
corrected up to date pr<strong>in</strong>ted/advance correction slip, for Schedule of Rates<br />
corrected up to date pr<strong>in</strong>ted/advance correction slip for the present contract.<br />
3. Rs. 2,26,510/-(Two Lakh Twenty Six Thousand Five Hundred Ten Only)<strong>in</strong> favour of<br />
Dy.FA&CAO/IRPMU, Shivaji Bridge, New Delhi. i.e. For works estimated to cost(<br />
tender cost) up to Rs 1 crore @ 2% of estimated cost of the work and for works<br />
estimated to cost more than Rs 1 crore, i.e. Rs 2 lakhs plus ½ % (half percent)<br />
of the excess of estimated cost of work beyond Rs 1 crore subject to a maximum<br />
of Rs 1 crore. The earnest money shall be rounded to the nearest Rs.10/-<br />
(Rupees Ten only). The full value of the Earnest Money shall stand forfeited<br />
without prejudice to any other rights or remedies <strong>in</strong> case my/our tender is<br />
accepted and if:-<br />
a) I/We do not execute the contract documents with<strong>in</strong> Fifteen Days after receipt of<br />
the notice issued by the Railway that such documents are ready.<br />
b) I/We do not commence the work with<strong>in</strong> fifteen days after receipt of orders to that<br />
effect.<br />
OS/Works 4