shall also provide all facilities as required by the Eng<strong>in</strong>eer such as Ladder and<br />

other appliances for satisfactory <strong>in</strong>spection of the works and places where<br />

materials for the work are stored or prepared.<br />

20.0 OPENING UP OF WORK OR MATERIALS FOR INSPECTION OR TEST:<br />

Should the Eng<strong>in</strong>eer, or any representative consider it necessary for the<br />

purpose of enabl<strong>in</strong>g <strong>in</strong>spection of tests analysis to be made to verify or<br />

ascerta<strong>in</strong> the quality of any part of the works or of any materials, the<br />

contractor shall as and when required by the Eng<strong>in</strong>eer or his representatives<br />

open up the work or materials for <strong>in</strong>spection or test or analysis, pull down or cut<br />

<strong>in</strong>to any part of the work to make such open<strong>in</strong>gs, <strong>in</strong>to under or through any<br />

part of the works as may be directed and shall/provide all th<strong>in</strong>gs facilities<br />

which <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer or his representative are necessary and<br />

essential for the purpose of <strong>in</strong>spection or test or analysis of the works or of any<br />

part thereof or the materials, or of workmanship and the contractor shall close<br />

up, cover, rebuild and made good the whole at his own cost, as and when<br />

directed by and to the satisfaction of Eng<strong>in</strong>eer provided always that of the work<br />

<strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer is found to his satisfaction and <strong>in</strong> accordance<br />

with the contract. The excess expenditure <strong>in</strong> such exam<strong>in</strong>ation, <strong>in</strong>spection or test<br />

shall, upon the certificate of the Eng<strong>in</strong>eer, be borne by the Railways.<br />

21.0 GENERAL<br />

21.1 PROVISION OF LIGHT SIGNALS ETC.,<br />

The contractor/s shall make such provision for light<strong>in</strong>g the works, materials and<br />

plant and provide all such marks and lights, signals and other appliances as may be<br />

necessary or as may be required by the Eng<strong>in</strong>eer or other responsible authorities<br />

dur<strong>in</strong>g the execution completion and ma<strong>in</strong>tenance of the work and shall provide all<br />

labour, stores, etc. required for their efficient work<strong>in</strong>g and use at any time of day or<br />

night. He/They shall also provide all arrangement of every description of<br />

watch<strong>in</strong>g and ma<strong>in</strong>tenance required <strong>in</strong> connection with the forego<strong>in</strong>g and all other<br />

services for protection of any secur<strong>in</strong>g all dangerous places whether to the<br />

contractor's workmen or to other persons and or vehicular traffic until the work is<br />

certified by the eng<strong>in</strong>eer to have been completed and taken over <strong>in</strong> accordance<br />

with the contract.<br />

21.2 The contractor/s will provide upon the works to the satisfaction of the Eng<strong>in</strong>eer<br />

and at such, places as he may nom<strong>in</strong>ate, proper and sufficient life sav<strong>in</strong>g, fire<br />

fight<strong>in</strong>g and first aid appliances which shall at all times be available for use.<br />

21.3 LABOUR CAMPS<br />

OS/Works 26