may be for highly skilled, semi skilled personnel drafted for operat<strong>in</strong>g the<br />

plant and mach<strong>in</strong>ery.<br />

(vi)<br />

The payment for the fuel cost shall be paid on the basis of the actual<br />

expenditure <strong>in</strong>curred by the contractor for purchase +10% contractor's<br />

profit thereof which will be the payments towards his miscellaneous<br />

expenses too.<br />

16.0 NIGHT WORK<br />

16.1 If the Eng<strong>in</strong>eer is satisfied that the work is not likely to be completed <strong>in</strong> time<br />

except by resort<strong>in</strong>g to night work, he may order without confirm<strong>in</strong>g any right on<br />

the contractor for claim<strong>in</strong>g any extra payment for the same.<br />

17.0 DISPOSAL OF SURPLUS EXCAVATED MATERIALS<br />

17.1 The contractor shall at all time keep the site free from all surplus earth,<br />

surplus materials, and all rubbish which shall arise from the works and should<br />

dispose of the surplus excavated materials as ordered by the Eng<strong>in</strong>eer<br />

fail<strong>in</strong>g which it will be done at the cost of the contractor and cost will be<br />

deducted from his dues.<br />

17.2 The contractor shall with<strong>in</strong> 15 days of completion of entire works remove all<br />

unused and surplus materials tools and plants stag<strong>in</strong>g and refuge or other<br />

materials produced by his operations and shall leave the site <strong>in</strong> a clear and tidy<br />

conditions.<br />

18.0 SITE INSPECTION REGISTER<br />

18.1 A site <strong>in</strong>spection register will be ma<strong>in</strong>ta<strong>in</strong>ed by the Eng<strong>in</strong>eer or his representative<br />

<strong>in</strong> which the contractor will be bound to sign day to day entries made by the<br />

Eng<strong>in</strong>eer or his representative. The contractor is required to take note of the<br />

<strong>in</strong>structions given to him through the site <strong>in</strong>spection register and should<br />

comply with the same with<strong>in</strong> a reasonable time. The contractor will also<br />

arrange to receive all the letters etc., issued to him at the site of works.<br />

18.2 The contractor shall, from time to time (before the surface of any portion or<br />

the site is <strong>in</strong>terfered with or the work thereon begun) take such levels as the<br />

Eng<strong>in</strong>eer may direct <strong>in</strong> his presence or any person authorized by him <strong>in</strong> writ<strong>in</strong>g.<br />

Such levels approved and checked by him or such authorized persons shall be<br />

recorded <strong>in</strong> writ<strong>in</strong>g and signed by the contractor and shall form the basis of the<br />

measurements. Immediately before any portion of the work,<br />

19.0 The contractor shall have to make and ma<strong>in</strong>ta<strong>in</strong> at his own cost suitable<br />

approach road and path, etc., for proper <strong>in</strong>spection of the various works. He<br />

OS/Works 25