create any isolated borrow pit which is likely to cause accumulation of water<br />
which may breed mosquitoes.<br />
9.9.2 Non fulfilment of the provision <strong>in</strong> 9.9.1 above shall be a breach of the contract<br />
and contractor/s shall be liable to pay by way of agreed liquidated damages to<br />
the Railway at the rates of Rs.100/- for each breach and <strong>in</strong> addition to that<br />
contractor further undertake to pay the amount <strong>in</strong>curred by the Railway <strong>in</strong> gett<strong>in</strong>g<br />
the said job/s done at the risk and cost of the contractor. Besides this, the<br />
contractor will also be held responsible for any laws for contraven<strong>in</strong>g them.<br />
10.0 SETTING OUT WORKS<br />
10.1 The contractor is to set out the whole of the work <strong>in</strong> consultation with the<br />
eng<strong>in</strong>eer or an official to be deputed by the Eng<strong>in</strong>eer and dur<strong>in</strong>g the progress of<br />
works to amend on the requisition of the Eng<strong>in</strong>eer any errors which may arise<br />
there <strong>in</strong> and provide efficient and sufficient staff and labour thereon. The<br />
contractor shall also alter or amend any errors <strong>in</strong> the dimension l<strong>in</strong>es on levels to<br />
the satisfaction of the Eng<strong>in</strong>eer or his authorized representative without claim<strong>in</strong>g<br />
any compensation for the same.<br />
10.2 The contractor shall provide, fix and be responsible for ma<strong>in</strong>tenance of all stocks,<br />
templates, profiles, land marks, po<strong>in</strong>ts, burjies, monuments, centre l<strong>in</strong>e pillars,<br />
reference pillars, etc. and shall take all necessary precautions to prevent their<br />
be<strong>in</strong>g removed altered or disturbed and will be responsible for the consequence<br />
of such removal, alterations or disturbance and for their efficient re<strong>in</strong>statement.<br />
10.3 The contractor shall protect and support, as may be required or as directed by<br />
the Eng<strong>in</strong>eer, all build<strong>in</strong>g, fences, walls, towers, dra<strong>in</strong>s, road paths,<br />
waterways, foreshores banks, bridges, Railway ground and overhead electric<br />
light<strong>in</strong>g, the telegraphs/telephones and cross<strong>in</strong>g water service ma<strong>in</strong> pipes<br />
and cables and wires and altogether matters and th<strong>in</strong>gs of whatever k<strong>in</strong>d<br />
not otherwise here<strong>in</strong> specified other than those specified or directed to be<br />
removed or altered which may be <strong>in</strong>terfered with or which likely to be affected<br />
disturbed or endanger by the execution completion of ma<strong>in</strong>tenance of the<br />
works and shall support provided under this clause to such cases as directed by<br />
the Eng<strong>in</strong>eer. No payment shall be made by the Railway to the contractor for<br />
these works on account of delay for re-arrangement of road traffic or <strong>in</strong> the<br />
contractor hav<strong>in</strong>g to carry out the short lengths and <strong>in</strong> such places as per<br />
conditions and circumstances may warrant. These will not form the basis of<br />
any claim and or dispute for compensation of any k<strong>in</strong>d.<br />
11.0 DRAWINGS FOR WORKS:<br />
11.1 The Railway Adm<strong>in</strong>istration reserves the right to modify the plans and draw<strong>in</strong>gs<br />
as referred to <strong>in</strong> the special data and specifications as also the estimate and<br />
specifications without assign<strong>in</strong>g any reasons as and when considered necessary<br />
by the railway. The percentage rates for the schedule items and items rates for<br />
OS/Works 20