create any isolated borrow pit which is likely to cause accumulation of water<br />

which may breed mosquitoes.<br />

9.9.2 Non fulfilment of the provision <strong>in</strong> 9.9.1 above shall be a breach of the contract<br />

and contractor/s shall be liable to pay by way of agreed liquidated damages to<br />

the Railway at the rates of Rs.100/- for each breach and <strong>in</strong> addition to that<br />

contractor further undertake to pay the amount <strong>in</strong>curred by the Railway <strong>in</strong> gett<strong>in</strong>g<br />

the said job/s done at the risk and cost of the contractor. Besides this, the<br />

contractor will also be held responsible for any laws for contraven<strong>in</strong>g them.<br />

10.0 SETTING OUT WORKS<br />

10.1 The contractor is to set out the whole of the work <strong>in</strong> consultation with the<br />

eng<strong>in</strong>eer or an official to be deputed by the Eng<strong>in</strong>eer and dur<strong>in</strong>g the progress of<br />

works to amend on the requisition of the Eng<strong>in</strong>eer any errors which may arise<br />

there <strong>in</strong> and provide efficient and sufficient staff and labour thereon. The<br />

contractor shall also alter or amend any errors <strong>in</strong> the dimension l<strong>in</strong>es on levels to<br />

the satisfaction of the Eng<strong>in</strong>eer or his authorized representative without claim<strong>in</strong>g<br />

any compensation for the same.<br />

10.2 The contractor shall provide, fix and be responsible for ma<strong>in</strong>tenance of all stocks,<br />

templates, profiles, land marks, po<strong>in</strong>ts, burjies, monuments, centre l<strong>in</strong>e pillars,<br />

reference pillars, etc. and shall take all necessary precautions to prevent their<br />

be<strong>in</strong>g removed altered or disturbed and will be responsible for the consequence<br />

of such removal, alterations or disturbance and for their efficient re<strong>in</strong>statement.<br />

10.3 The contractor shall protect and support, as may be required or as directed by<br />

the Eng<strong>in</strong>eer, all build<strong>in</strong>g, fences, walls, towers, dra<strong>in</strong>s, road paths,<br />

waterways, foreshores banks, bridges, Railway ground and overhead electric<br />

light<strong>in</strong>g, the telegraphs/telephones and cross<strong>in</strong>g water service ma<strong>in</strong> pipes<br />

and cables and wires and altogether matters and th<strong>in</strong>gs of whatever k<strong>in</strong>d<br />

not otherwise here<strong>in</strong> specified other than those specified or directed to be<br />

removed or altered which may be <strong>in</strong>terfered with or which likely to be affected<br />

disturbed or endanger by the execution completion of ma<strong>in</strong>tenance of the<br />

works and shall support provided under this clause to such cases as directed by<br />

the Eng<strong>in</strong>eer. No payment shall be made by the Railway to the contractor for<br />

these works on account of delay for re-arrangement of road traffic or <strong>in</strong> the<br />

contractor hav<strong>in</strong>g to carry out the short lengths and <strong>in</strong> such places as per<br />

conditions and circumstances may warrant. These will not form the basis of<br />

any claim and or dispute for compensation of any k<strong>in</strong>d.<br />

11.0 DRAWINGS FOR WORKS:<br />

11.1 The Railway Adm<strong>in</strong>istration reserves the right to modify the plans and draw<strong>in</strong>gs<br />

as referred to <strong>in</strong> the special data and specifications as also the estimate and<br />

specifications without assign<strong>in</strong>g any reasons as and when considered necessary<br />

by the railway. The percentage rates for the schedule items and items rates for<br />