01.02.2015 Views

fufonk ifji - irpmu.railnet.gov.in

fufonk ifji - irpmu.railnet.gov.in

fufonk ifji - irpmu.railnet.gov.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IRPMU<br />

INDIAN RAILWAYS PROJECT MANAGEMENT UNIT<br />

SHIVAJI BRIDGE (IRCOT Complex),<br />

NEW DELHI – 110 001<br />

Tender Document<br />

Design, Supply, Installation and<br />

commission<strong>in</strong>g of IP DSLAM at<br />

various locations over Northern &<br />

North Central Railways and Central<br />

Organization of Railway<br />

Electrification<br />

Tender No. IRPMU/ W / 2008/144/ IP DSLAM (NR & NCR) dated 08.02.2008<br />

Copy No.___<br />

Sold to M/s …………….<br />

Price Rs. 10000/-<br />

By Post Rs. 10500/-


INDEX<br />

SECTION CHAPTER SUBJECT<br />

I 1 Tender Notice<br />

2 Preamble<br />

3 Schedule of Requirement<br />

II 1 Instructions to tenderer &<br />

Conditions of tender<strong>in</strong>g<br />

2 Special conditions of contract<br />

3 Forms of tenderer etc.<br />

III<br />

Technical Specification<br />

1 Technical Overview<br />

2 Equipment Requirement &<br />

Configuration<br />

3 Technical Specifications of IP<br />

DSLAM<br />

4 Technical Specifications of NMS /<br />

EMS<br />

5 IP DSLAM Equipment<br />

Characteristics<br />

6 Technical Specifications of ADSL<br />

Modem<br />

7 Technical Specifications of Router<br />

8 Technical Specifications of Layer –<br />

3 Switches<br />

9 Technical Specifications of ADSL<br />

L<strong>in</strong>e Tester<br />

1


Section – I<br />

Chapter – 1<br />

Tender Notice<br />

2


Hkkjrh; jsy ifj;kstuk izcU/ku bdkbZ<br />

bjdkWV ifjlj] f'kokth fczt ('kadj ekfdZV ds ihNs),<br />

ubZ fnYyh & 110001<br />

nwjHkk"k% 91&11&23412260 @ 23414161] QSDl% 91&11&23412556<br />

izFake 'kqf/n i=<br />

<strong>fufonk</strong> la-% vkbZvkjih,e;w@MCY;w@2008@144@ Mh,l,y,,e (,uvkj ,oa ,ulhvkj) fnukad<br />

08-02-08<br />

25-2-08<br />

dk;Z dk<br />

uke<br />

mRrj jsyos] mRrj e/; jsyos ,oa dsUnzh; jsy fo|qfRkdj.k laxBu ds fofHkUu<br />

LFkkuksa ij vkbZih Mh,l,y,,e dk;ksZ dk vfHkdYi] iwrhZ] laLFkkiu] ijh{k.k ,oa<br />

pkyw djuk<br />

mijkssDr <strong>fufonk</strong> lwpuk es U;wure ;ksX;rk ekun.M ds vUrxZr le:i dk;Z dk vFkZ vkbZih<br />

Mh,l,y,,e dk;ksZ dk vfHkdYi] fofuekZ.k] iwrhZ] laLFkkiu] ijh{k.k ,oa pkyw djuk ds<br />

LFkku ij vkbZih vk/kkfjr usVodZ dk vfHkdYi] fofuekZ.k] iwrhZ] laLFkkiu] ijh{k.k ,oa<br />

pkyw djauk i


TENDER NOTICE<br />

E-mail address: adm@<strong>irpmu</strong>.<strong>railnet</strong>.<strong>gov</strong>.<strong>in</strong> Tel.: +91-11-2341 2260 /2341 4161<br />

Fax: +91-11-2341 2556<br />

Tender No.: IRPMU/ W / 2008/144/ IP DSLAM (NR & NCR)<br />

Dated: 08/02/2008<br />

Chief Adm<strong>in</strong>istrative Officer, Indian Railway Project Management Unit, New Delhi, for<br />

and on behalf of the President of India <strong>in</strong>vites sealed Open tenders from the established,<br />

reliable and experienced manufacturers or their authorized agents with sufficient proven<br />

experience <strong>in</strong> similar work as per follow<strong>in</strong>g details.<br />

Name of Work:<br />

Design, Supply, Installation and commission<strong>in</strong>g of IP DSLAM<br />

at various locations over Northern & North Central Railways<br />

and Central Organization of Railway Electrification.<br />

Approximate cost<br />

Rs. 20,237,370<br />

Earnest Money<br />

Price of Tender Docs<br />

(Non refundable):<br />

Forward<strong>in</strong>g Charges<br />

(if required by post / courier)<br />

Completion Period:<br />

Rs. 251190/-<br />

(Rupees Two lakhs fifty one thousand one hundred n<strong>in</strong>ety<br />

only)<br />

Rs 10000.00<br />

(Rupees ten thousand only)<br />

Rs 500.00<br />

(Rupees five hundred only)<br />

6 Months<br />

Sale of Tender Documents Between 1030 hrs to 1500 hrs from 22/02/2008 to 24/03/2008<br />

Last Date / Time of Tender<br />

Receipt<br />

Tender Open<strong>in</strong>g Date / Time<br />

Place of Open<strong>in</strong>g<br />

Validity of Offer<br />

25/03/2008 up to 1430 Hrs<br />

25/03/2008 at 1500 Hrs.<br />

In the office of CAO/IRPMU, IRCOT complex, Shivaji<br />

Bridge, New Delhi.<br />

6 months from date of open<strong>in</strong>g.<br />

Tenders without Earnest Money will be summarily rejected.<br />

The tender documents can be obta<strong>in</strong>ed from the office of Chief Adm<strong>in</strong>istrative Officer (IRPMU),<br />

IRCOT Complex, Shivaji Bridge, New Delhi - 110001 Between 1030 hrs to 1500 hrs from<br />

22/02/2008 to 24/03/2008 on production of Pay order/Demand Draft from a<br />

Nationalized/Scheduled Indian Bank drawn <strong>in</strong> favour of Dy FA & CAO / IRPMU New Delhi<br />

towards the cost of tender document shown above. Tender document can also be purchased<br />

through post / courier by send<strong>in</strong>g Demand Draft / Pay Order for Rs 10500 (Rupees ten thousand<br />

five hundred only) drawn <strong>in</strong> favour of Dy FA & CAO / IRPMU. However IRPMU will not be<br />

responsible for any forward<strong>in</strong>g delay. Tender document can also be downloaded from IRPMU’s<br />

website www.<strong>irpmu</strong>.<strong>railnet</strong>.<strong>gov</strong>.<strong>in</strong>. Tenderer submitt<strong>in</strong>g downloaded tender document, should<br />

submit cost of tender document as given above <strong>in</strong> the form of Pay order/Demand Draft from a<br />

Nationalized/Scheduled IndianBank drawn <strong>in</strong> favour of Dy FA & CAO / IRPMU New Delhi<br />

along with bid. Payment to contractor will be made through EFT/ECS.<br />

M<strong>in</strong>imum Qualification Eligibility Criteria:<br />

4


1. The tenderer should have completed successfully at least one work of similar nature to<br />

that of this tender cost<strong>in</strong>g not less than 35% of advertised value of the tender, <strong>in</strong> the last<br />

three f<strong>in</strong>ancial years (i.e. current year and three previous f<strong>in</strong>ancial years.) Mean<strong>in</strong>g of<br />

similar work for this tender is as under:<br />

“Supply, Installation, test<strong>in</strong>g and commission<strong>in</strong>g of IP DSLAM work”<br />

2. As a proof of sufficient f<strong>in</strong>ancial capacity and organizational resources, contractor should<br />

have received total payment aga<strong>in</strong>st satisfactory execution of completed/ongo<strong>in</strong>g works<br />

(of all types) dur<strong>in</strong>g preced<strong>in</strong>g three years as per current ITCC/Audited Balance Sheet of<br />

a value not less than 150% of the advertised cost of work.<br />

If the tenderer deliberately give(s) wrong <strong>in</strong>formation whose credentials/documents <strong>in</strong> his/their<br />

tenders and thereby create(s) circumstances for acceptance of his/their tender, Railway reserves<br />

the right to reject such tender at any stage, besides, shall suspend the Bus<strong>in</strong>ess for one year.<br />

Note: 1.<br />

Tender Forms are non transferable.<br />

2. In case, any of the days here<strong>in</strong> mentioned above is declared a holiday or closed on<br />

any account, the said date, shall automatically be substituted by the date of the next<br />

work<strong>in</strong>g day.<br />

3. The tender notice & tender document can also be seen at official website of IRPMU<br />

"www.<strong>irpmu</strong>.<strong>railnet</strong>.<strong>gov</strong>.<strong>in</strong>".<br />

(Shailesh Tiwari)<br />

Dy.CSTE/HQ<br />

Indian Railway Project Management Unit<br />

New Delhi, India<br />

for & behalf of the President of India<br />

5


Hkkjrh; jsy ifj;kstuk izcU/ku bdkbZ<br />

bjdkWV ifjlj] f'kokth fczt ('kadj ekfdZV ds ihNs),<br />

ubZ fnYyh & 110001<br />

<strong>fufonk</strong> lwpuk<br />

nwjHkk"k% 91&11&23412260 @ 23414161] QSDl% 91&11&23412556<br />

<strong>fufonk</strong> la-% vkbZvkjih,e;w@MCY;w@2008@144@ Mh,l,y,,e (,uvkj ,oa ,ulhvkj)<br />

fnukad 08-02-08<br />

Hkkjr ds jk"Vzifr ds fy;s dh vksj ls eq[; iz'kklfud vf/kdkjh] Hkkjrh;<br />

jsyos ifj;kstuk izca/ku bdkbZ] bjdkWV ifjlj] f'kokth fczt] ubZ fnYyh }kjk jsyos<br />

ladsr dk;Z ds fy;s fo'oLuh;] vuqHkoh ,oa LFkkfir Bsdsjknksa] ftuds ikl izekf.kr<br />

i;kZIr vuqHko gks] ls fuEufyf[kr ^[kqyh <strong>fufonk</strong>^ vkeaf=r dh tkrh gS %&<br />

dk;Z dk uke<br />

mRrj jsyos] mRrj e/; jsyos ,oa dsUnzh; jsy fo|qfRkdj.k<br />

laxBu ds fofHkUu LFkkuksa ij vkbZih Mh,l,y,,e dk;ksZ<br />

dk vfHkdYi] iwrhZ] laLFkkiu] ijh{k.k ,oa pkyw djuk<br />

dk;Z dh vuqekfur ykxr #-20]237]370-00<br />

c;kuk jkf'k #- 251190-00 :I;s nks yk[k bdkou gtkj ,d lkS uCcs<br />

dsoy !<br />

<strong>fufonk</strong> izys[k dh dher #-10000@& #i;s nl gtkj ek=<br />

(vgLrkarj.kh;<br />

izs"k.k 'kqYd (;fn Mkd @ #-500@&<br />

dksfj;j }kjk izkIr djuk #-ikWap lkS ek=<br />

gks)<br />

dk;Z iwjk djus dh N% ekg<br />

vof/k<br />

<strong>fufonk</strong> tek djus dh fnukad 25-03-2008 dks cts 14-30 cts rd<br />

vafre frfFk<br />

<strong>fufonk</strong> [kqyus dh frfFk]<br />

le; ,oa Lfkku<br />

fnukad 25-03-2008 dks 15-00 cts eq[; iz'kklfud<br />

vf/kdkjh dk;kZy;] bjdkWV ifjlj] f'kokth fczt] ubZ<br />

fnYyh&110001<br />

<strong>fufonk</strong> izLrko dh oS/krk <strong>fufonk</strong> [kqyus ds fnu ls N% ekg<br />

<strong>fufonk</strong> izys[k izkfIr dh fnukad 22-02-08 ls 24-03-08 rd le; 10-30 cts<br />

6


frfFk ,oa le;<br />

ls 15-00 cts rd<br />

fcuk /kjksgj jkf'k ds <strong>fufonk</strong>;sa fujLr dj nh tk;saxh<br />

vU; fooj.k ,oa <strong>fufonk</strong> eq[; iz'kklfud vf/kdkjh] vkbZ vkj ih ,e ;w<br />

@bjdkV ifjlj] f'kokth fczt] ubZ fnYyh dk;kZy; esa #-10000@& #i;s nl gtkj<br />

ek= dk Hkqxrku] mi foRr lykgdkj ,oa eq[; ys[kk vf/kdkjh@ Hkkjrh; jsyos<br />

ifj;kstuk izca/ku bdkbZ] ubZ fnYyh ds i{k esa jk"Vzh; @ vuqlwfpr Hkkjrh; cSad }kjk<br />

tkjh Hkqxrku vkns'k @ fMek.M MzkQ~V izLrqr dj dz; fd;k tk ldrk gS ! Mkd<br />

}kjk <strong>fufonk</strong> izys[k #- 10500@& esa dz; fd;k tk ldrk gS ! <strong>fufonk</strong> izys[k dh dz;<br />

jkf'k izfrns; ugha gS ! Hkkjrh; jsyos ifj;kstuk izca/ku bdkbZ dk;kZy; fdlh Hkh izdkj<br />

ds foyEc ds fy;s mRrjnk;h ugha gksxk ! <strong>fufonk</strong> dh ykxr vkSj nLrkost<br />

vgLrkarj.kh; gS A <strong>fufonk</strong> izi= osolkbV ls Mkmu yksM fd;s tk ldrsa gSa] Mkmu<br />

yksM dh x;h <strong>fufonk</strong> ds lkFk <strong>fufonk</strong> nLrkost dk ewY ; <strong>fufonk</strong> ds lkFk tek<br />

djkuk gksxk rFkk <strong>fufonk</strong> rHkh ekU; gksxh A Bsdsnkj dks b,QVh @ bZlh,l ds }kjk<br />

Hkqxrku fd;k tk;sxk A<br />

<strong>fufonk</strong>dkjksa ds fy;s U;wure ;ksX;rk ekun.M%<br />

1- <strong>fufonk</strong>dkj }kjk fiNys rhu o"kksZ esa vFkkZr pkyw ,oa rhu fiNys foRrh; o"kksZ esa<br />

de ls de ,d le:i dk;Z dk lQy lekiu djok;k gks ftldh ykxr mDr<br />

<strong>fufonk</strong> dh jkf'k ls 35% ls de ugha gksuh pkfg;s !<br />

le:i dk;Z dk vFkZ vkbZih Mh,l,y,,e dk;ksZ dk vfHkdYi] fofuekZ.k] iwrhZ]<br />

laLFkkiu] ijh{k.k ,oa pkyw djuk %&<br />

2- Bsdsnkj dh foRrh; {kerk ,oa laxBu lalk/ku dh izekf.kdrk ds fy;s mls pkyw<br />

vkbZVhlhlh@,oa ys[kk ijhf{kr rqyui= fiNys rhu o"kksZ ds vuqlkj iw.kZ ,oa pkyw dk;ksZ<br />

ds larks"k tud fu"iknu }kjk <strong>fufonk</strong> ewY; ds 150% ls de dk Hkqxrku izkIr ugha<br />

fd;k gksuk pkfg;s A<br />

;fn <strong>fufonk</strong>nkrk tkucw>dj nks"kiw.kZ lwpuk izLrqr djrk gS] ftlds vk/kkj ij<br />

mldh <strong>fufonk</strong> dks Lohdkj dj fy;k tkrk gS rks jsyos ;g vf/kdkj j[krh gS fd og<br />

fdlh Hkh le; mls vLohd`r dj ns lkFk gh ,d o"kZ ds fy;s mldk O;olk;<br />

fuyafcr dj ldrh gS !<br />

lHkh izi=ks ds lkFk ,d fyQkQs esa lhy gq;h <strong>fufonk</strong> ftlds mij dk;Z dk<br />

uke vafdr gksuk pkfg;s] eq[; iz'kklfud vf/kdkjh] vkbZ vkj ih ,e ;w] bjdkWV<br />

ifjlj] f'kokth fczt] ubZ fnYyh & 110001 dh fu/kkZfjr <strong>fufonk</strong> isVh esa tek dh<br />

tkuh pkfg;s ! ;Fkkfof/k lhy dh gq;h <strong>fufonk</strong> iathd`r Mkd }kjk Hkh<br />

7


izsf"kr fd;k tk ldrk gS ftls fu/kkZfjr le; ,oa frfFk ls iwoZ vkbZ vkj ih<br />

,e ;w dk;kZy; esa izkIr gks tkuk pkfg;s ! fu/kkZfjr le; ds i'pkr~ izkIr<br />

<strong>fufonk</strong> vLohdk;Z gksxh !<br />

uksV%<br />

1- <strong>fufonk</strong> i= vgLrkrajf.k; gS !<br />

2- ;fn fdlh dkj.ko'k mijksDr frfFk;ksa dks dk;kZy; dk vodk'k gks tkrk gS<br />

rks Lor% vxys dk;Zfnol dks nLrkost izLrqr fd, tk ldrs gSa !<br />

3-<strong>fufonk</strong> lwpuk ,oa <strong>fufonk</strong> <strong>ifji</strong>= vkbZ vkj ih ,e ;w dh vf/kdkfjd<br />

csclkbVwww.<strong>irpmu</strong>.<strong>railnet</strong>.<strong>gov</strong>.<strong>in</strong> ij Hkh miyC/k gS !<br />

('kSys'k frokjh)<br />

mi eq[; ladsr ,oa flxuy vfHk;Urk@eq[;ky;@vkbZvkjih,e;w<br />

bjdkWV ifjlj] f'kokth fczt] ubZ fnYyh & 110001<br />

Hkkjr ds jk"Vzifr dh vksj ls @ ds fy;s<br />

8


Section – I<br />

Chapter – 2<br />

Preamble<br />

9


PREAMBLE<br />

Tender No. IRPMU/ W / 2008/144/IP DSLAM(NR&NCR)<br />

1 NAME OF WORK:<br />

Design, Supply, Installation Test<strong>in</strong>g and commission<strong>in</strong>g of IP-DSLAM at various<br />

locations of Nothern & North Central Railways and Centre for Railway<br />

Electrification<br />

2 SCOPE OF WORK:<br />

2.1) The scope of work for the tender shall <strong>in</strong>clude, <strong>in</strong> general, but not be limited to<br />

cover Design, Supply, Installation, Test<strong>in</strong>g, Commission<strong>in</strong>g of IP-DSLAM<br />

Equipment to provide voice and broadband connectivity to Railway’s staff as<br />

mentioned <strong>in</strong> the annexure to preamble. The work is to be executed at the Zonal<br />

Headquarters of Northern & North Central Railway at Delhi and Allahabad,<br />

Headquarter of Centre for Railway Electrification at Allahabad & Divisions of<br />

Northern & North Central Railway as per list attached.<br />

2.2) Completion Schedule: The IP DSLAM network for Indian Railways should be<br />

fully operational with<strong>in</strong> 180 days of issue of LOA by Indian Railways. The<br />

bidders must ensure that they shall be able to meet these timel<strong>in</strong>es of the project.<br />

There is no scope for any delay <strong>in</strong> the project implementation. This should be<br />

kept <strong>in</strong> m<strong>in</strong>d while submission of the bids.<br />

2.3) Network Topology : Any type of medium, such as Fiber Optic Transmission,<br />

Copper Transmission shall be able to <strong>in</strong>terpose between DSLAM-Railway<br />

Network, DSLAM-DSLAM or DSLAM-soft switch, where ever applicable. The<br />

required transmission medium shall be decided on a case by case basis.<br />

2.4) Contract Requirements<br />

i) The proposed DSLAM shall have the capability to provide broadband<br />

connectivity to Railway Staff by us<strong>in</strong>g Railway’s exist<strong>in</strong>g or new <strong>in</strong>frastructure.<br />

The Bidder shall provide fully detailed description of upgradeability and<br />

expandability of the equipment offered.<br />

ii).<br />

iii)<br />

Availability: Network availability is the essence of this contract. The solution<br />

offered should be able to meet the availability requirement of at least 99% per<br />

Quarter.<br />

The solution shall adequately address related issues, so that the specified<br />

network uptime is achievable.<br />

10


The solution offered should be based on robust and state of art products and<br />

technology, and should ensure <strong>in</strong>vestment protection to Indian Railways, through<br />

the period of the contract.<br />

iv)<br />

Voice connectivity : The solution offered should provide voice and broadband<br />

connectivity to Railway’s staff countrywide.<br />

v) Data Security: The bidder should ensure end-to-end security of data<br />

transmission through their network. The bidder shall specify the security<br />

measures be<strong>in</strong>g deployed <strong>in</strong> the bidder’s network, so that IP DSLAM data is<br />

protected from external hack<strong>in</strong>g.<br />

vi)<br />

vii)<br />

viii)<br />

ix)<br />

Response time: Indian Railways shall <strong>in</strong>timate the bidder about the problem<br />

occurrence <strong>in</strong> case it is required. In most cases of problem occurrence, it is<br />

envisaged that the contractor shall get alerts generated by NMS. A maximum<br />

time of 12 hours to respond from the time of <strong>in</strong>timation, and a maximum problem<br />

resolution time of 6 hours thereafter, shall be allowed. For other regions of<br />

deployment, the contractor shall plan his support offices accord<strong>in</strong>gly, to meet<br />

these response times. These Service Support Centres shall be made<br />

operational to match the commission<strong>in</strong>g of IP DSLAM network <strong>in</strong> the respective<br />

regions.<br />

Network Reports: The bidder shall provide reports of the network, on a monthly<br />

basis. Additionally, any such reports should also be made available to Indian<br />

Railways, whenever requested. The contractor shall ma<strong>in</strong>ta<strong>in</strong> record of all the<br />

logs, perta<strong>in</strong><strong>in</strong>g to the IP DSLAM network, dur<strong>in</strong>g the currency of the contract.<br />

Also, two eng<strong>in</strong>eers of Indian railways shall be made conversant with the NMS<br />

configuration for IP DSLAM network at each location.<br />

Electrical Power: At all the field <strong>in</strong>stallation sites regulated AC and DC Ma<strong>in</strong>s<br />

/Generator power shall be made available with sufficient power back up by<br />

Railway.<br />

Project Key Dates: Time is the essence of the contract. It, therefore,<br />

emphasized that the implementation time schedules mentioned <strong>in</strong> the tender<br />

document shall be strictly adhered to. Further, the bidders are required to submit<br />

details of the project implementation plans.<br />

x) Network Management System / Element Management System<br />

The NMS / EMS shall be offered, enabl<strong>in</strong>g centralized monitor<strong>in</strong>g and<br />

configuration of each DSLAM equipment.<br />

The NMS / EMS shall have a user-friendly GUI, with first level diagnostic<br />

capability.<br />

The NMS / EMS shall have fault management, alarm monitor<strong>in</strong>g, fault<br />

localization, configuration management, performance management, security<br />

management, software download, subscriber l<strong>in</strong>e test functions.<br />

Each DSLAM shall have <strong>in</strong>dependent NMS / EMS.<br />

11


In future, it should be possible to have central EMS to manage all the NMS<br />

countrywide.<br />

3. TENDER BID<br />

The tender bid shall be submitted <strong>in</strong> two separate sealed covers as under <strong>in</strong> time<br />

with<strong>in</strong> the last date of tender submission <strong>in</strong> the sealed Tender Box to be kept for<br />

the purpose <strong>in</strong> the office of Chief Adm<strong>in</strong>istrative Officer /IRPMU, Shivaji Bridge<br />

(IRCOT complex),New Delhi 110001.<br />

Part-I – technical and credential elements of the tender bid here<strong>in</strong>after called"<br />

Credential bid”<br />

Part-II - Price element of the tender bid here<strong>in</strong>after called “price bid”<br />

The details to be <strong>in</strong>cluded with the bid are given <strong>in</strong> Para 6 of `Instructions to<br />

Tenderers and Conditions of Tender<strong>in</strong>g'.<br />

4. QUALIFYING CRITERIA<br />

To qualify for the bid, the Contractor shall be required to meet the eligibility<br />

requirements as given <strong>in</strong> Para - 18 of Instructions to Tenderers and Conditions of<br />

Tender<strong>in</strong>g.<br />

5. LAST DATE OF SUBMISSION:<br />

The Tender shall be received up to 1430 hrs on 25.03.2008 at New Delhi <strong>in</strong> the<br />

office of Chief Adm<strong>in</strong>istrative Officer /IRPMU, Shivaji Bridge (IRCOT complex),<br />

New Delhi 110001.<br />

6. DATE OF OPENING OF TENDER:<br />

The Tender will be opened at 1500 hrs on 25.03.2008 at the same address as<br />

mentioned <strong>in</strong> Para-5 above.<br />

7. COMPLETION PERIOD OF WORK:<br />

The entire work is to be completed with<strong>in</strong> 180 (one hundred & Eighty) days from<br />

the date of issue of Letter of Acceptance of the Tender.<br />

8. THE LIST OF ADDRESS TO WHICH CORRESPONDENCE AND<br />

DOCUMENTS RELATING TO THE CONTRACT SHOULD BE SENT.<br />

(a) Prior to award of the contract:<br />

Chief Adm<strong>in</strong>istrative Officer / IRPMU, Shivaji Bridge (IRCOT complex), New<br />

Delhi Telephone no. +91 11 23412260, Fax No. +91 11 23412556.<br />

(b) After the award of the Contract:<br />

12


The Chief Adm<strong>in</strong>istrative Officer / IRPMU, Shivaji Bridge (IRCOT complex),New<br />

Delhi or his Successor Nom<strong>in</strong>ee (Whose address will be <strong>in</strong>timated <strong>in</strong> due<br />

course).<br />

9. EARNEST MONEY:<br />

The Tenderer should furnish the requisite Earnest Money along with their offer <strong>in</strong><br />

favour of the Dy F<strong>in</strong>ancial Advisor& Chief Accounts Officer/IRPMU, Shivaji<br />

Bridge New Delhi’ as <strong>in</strong>dicated <strong>in</strong> Para-5 of Instructions to Tenderers and<br />

Conditions of Tender<strong>in</strong>g.<br />

10. SECURITY DEPOSIT:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

Security deposit shall be 5% of the contract value<br />

The rate of recovery shall be @10% of the bill amount till the full<br />

security deposit is recovered.<br />

Security deposit will be recovered only from the runn<strong>in</strong>g bill of the<br />

contract and no other mode of collect<strong>in</strong>g SD as <strong>in</strong> the form of<br />

<strong>in</strong>struments like BG, FD etc shall be accepted towards Security<br />

Deposit.<br />

No <strong>in</strong>terest will be payable upon the Security Deposit or amounts<br />

payable to the contractor under this contract.<br />

Security Deposit will be returned to the contractor after six months of physical<br />

completion of work as certified by competent authority and settlement of all dues and<br />

disputes. The competent shall normally be the authority, who is competent to sign the<br />

contract. If this competent authority is of the rank lower than the JA grade, then a JA<br />

grade officer (concerned with the work) should issue the certificate. The certificate <strong>in</strong>ter<br />

allia should mention that the work has been completed <strong>in</strong> all respects & that all the<br />

contractual obligations have been fulfilled by the contractors and that there is no due<br />

from the contractor to Railways aga<strong>in</strong>st the contract concerned. Before releas<strong>in</strong>g the<br />

Security Deposit, contractor concerned should submit an unconditional & unequivocal no<br />

claim certificate.<br />

11. PERFORMANCE GUARANTEE<br />

The procedure for obta<strong>in</strong><strong>in</strong>g Performance Guarantee is outl<strong>in</strong>ed below:-<br />

(a).<br />

(b).<br />

The successful bidder shall submit a Performance Guarantee (PG) <strong>in</strong> the form of<br />

an irrevocable bank guarantee amount<strong>in</strong>g to 5% of the contract value.<br />

A Performance Guarantee shall be submitted by the successful bidder after the<br />

letter of acceptance has been issued, but before sign<strong>in</strong>g of the agreement. The<br />

agreement should normally be signed with<strong>in</strong> 15 days after the issue of LOA and<br />

Performance Guarantee shall also be submitted with<strong>in</strong> this time limit. This<br />

guarantee shall be <strong>in</strong>itially valid up to the stipulated date of completion plus 60<br />

days beyond that. In case, the time for completion of work gets extended, the<br />

13


contractor shall get the validity of Performance Guarantee extended to cover such<br />

extended time for completion of work plus 60 days.<br />

(c ). The Performance Guarantee (PG) shall be released after the physical completion<br />

of the work based on the “Completion Certificate” issued by the competent<br />

authority stat<strong>in</strong>g that the contractor has completed the work <strong>in</strong> all respects<br />

satisfactorily . The security deposit, however, shall be released only after the<br />

expiry of the ma<strong>in</strong>tenance period and after pass<strong>in</strong>g the f<strong>in</strong>al bill based on “NO<br />

Claim Certificate.<br />

(d).<br />

(e).<br />

Wherever the contracts is resc<strong>in</strong>ded, the security deposit shall be forfeited and<br />

Performance Guarantee shall be encashed and the balance work shall be got done<br />

<strong>in</strong>dependently without risk and cost of the failed contractor. The failed contractor<br />

shall be debarred from participat<strong>in</strong>g <strong>in</strong> the tender for execut<strong>in</strong>g the balance work.<br />

If the failed contractor is a JV or a partnership firm, then every member/partner<br />

of such a firm shall be debarred from participat<strong>in</strong>g <strong>in</strong> the tender for the balance<br />

work either <strong>in</strong> his/her <strong>in</strong>dividual capacity or as a partner of any other<br />

JV/partnership firm.<br />

The Eng<strong>in</strong>eer shall not make a claim under the Performance Guarantee except for<br />

amounts to which the President of India is entitled under the contract ( not<br />

withstand<strong>in</strong>g and /or without prejudice to any other provisions <strong>in</strong> the contract<br />

agreement) <strong>in</strong> the event of :<br />

1. Failure by the contractor to extend the validity of the Performance Guarantee<br />

as described here<strong>in</strong> above, <strong>in</strong> which event the Eng<strong>in</strong>eer may claim the full<br />

amount of the Performance Guarantee.<br />

2. Failure by contractor to pay President of India any amount due, either as<br />

agreed by the contractor or determ<strong>in</strong>ed under any of the Clauses/Conditions<br />

of the agreement, with<strong>in</strong> 30 days of the service of notice to this effect by<br />

Eng<strong>in</strong>eer.<br />

3. The contract be<strong>in</strong>g determ<strong>in</strong>ed or resc<strong>in</strong>ded under provision of the GCC the<br />

Performance Guarantee shall be forfeited <strong>in</strong> full and shall be absolutely at the<br />

disposal of the President of India.<br />

12. SPECIFICATIONS / DRAWINGS:<br />

Reference of specification/draw<strong>in</strong>g of the important equipment, components and<br />

other materials required for the execution of the Contract is given <strong>in</strong> the Technical<br />

Supplement. The work shall be executed <strong>in</strong> compliance with all the technical<br />

requirements given there.<br />

13. SCHEDULE OF QUANTITIES:<br />

14


The Schedule of Quantities for Supply & Execution of various works are<br />

<strong>in</strong>dicated <strong>in</strong> Schedule of Requirement. The tenderers are advised to quote for all<br />

items.<br />

NOTE:- If it is considered necessary that the item of Supply and works<br />

<strong>in</strong>cluded <strong>in</strong> Schedule of requirement would not cover all works <strong>in</strong>volved <strong>in</strong> the<br />

execution of the work, additional item of work which are considered necessary<br />

and unit prices of such items shall be given separately as Schedule `Y' along with<br />

Explanatory Notes.<br />

15


S.No.<br />

Annexure to Preamble<br />

Calculation of quantity of items required at<br />

Place of HQ Qty of<br />

central<br />

office<br />

equipment S.N. Divisions<br />

Qty of<br />

Central<br />

office<br />

equipment<br />

Railway<br />

1 Northern Railway New Delhi,<br />

Baroda House 1 1 Delhi 4<br />

2 Northern Central<br />

Railway<br />

Allahabad<br />

6 CORE Allahabad 1<br />

Total no of<br />

systems for<br />

Zonal Railway 3<br />

Summary 1. Total IP DSLAMs for Zonal Hd<br />

Qtrs 3<br />

2. Total IP DSLAMs for Divisions 5<br />

3. No of subscribers at a Zonal HQ 528<br />

4. No of subscribers at a division 192<br />

1 2 Allahabad 1<br />

Sub Total 5<br />

16


Section – I<br />

Chapter – 3<br />

Schedule of Requirement<br />

17


Schedule-A (SUPPLY)<br />

S.NO. DESCRIPTION OF ITEM Unit Qty Unit Rate Total<br />

1 Supply of IP DSLAM<br />

Systemwith equipped<br />

capacity of 528 Ports and<br />

expandable up to 640<br />

Ports with 2 Nos of<br />

Gigabit Ethernet Optical<br />

Upl<strong>in</strong>k Module ( 1000<br />

Base -LX , 10 KM )<br />

alongwith element<br />

management system,<br />

Rack, Sub-Racks, Power<br />

Supply, and Installation<br />

material like 528 Primary /<br />

Secondary MDF, krone<br />

block for term<strong>in</strong>at<strong>in</strong>g 528<br />

l<strong>in</strong>es,Patch Cords , 12<br />

Core FDF etc. confirm<strong>in</strong>g<br />

to technical specification<br />

of tender document.<br />

2 Supply of 528 port splitter<br />

unit alongwith splitter<br />

shelf , covered rack Unit<br />

and associated Krone<br />

Block with 19" Rack Mount<br />

alongwith accessories like<br />

<strong>in</strong>terconnect<strong>in</strong>g cables,<br />

switchboard cables and<br />

0.5 mm copper cables etc.<br />

as required at site<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

3 Supply of IP DSLAM<br />

System with equipped<br />

capacity of 192 Ports and<br />

expandable up to 256<br />

Ports with 2 Nos of<br />

Gigabit Ethernet Optical<br />

Upl<strong>in</strong>k Module ( 1000<br />

Base -LX , 10 KM ) along<br />

with<br />

element<br />

management system,<br />

Rack, Sub-Racks, Power<br />

Supply, and Installation<br />

Nos. 3<br />

Set 3<br />

Nos. 5<br />

18


material like 192 Primary /<br />

Secondary MDF, krone<br />

block for term<strong>in</strong>at<strong>in</strong>g 192<br />

l<strong>in</strong>e Patch Cords , 12 Core<br />

FDF etc. confirm<strong>in</strong>g to<br />

technical specification of<br />

tender document.<br />

4 Supply of 192 port splitter<br />

unit alongwith splitter<br />

shelf , covered rack Unit<br />

and associated Krone<br />

Block with 19" Rack Mount<br />

alongwithl accessories<br />

like <strong>in</strong>terconnect<strong>in</strong>g<br />

cables, switchboard cables<br />

and 0.5 mm copper<br />

cables etc. as required at<br />

site confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

5 Supply of Local crafts<br />

term<strong>in</strong>al for provisio<strong>in</strong>g ,<br />

configuration,<br />

management etc of<br />

DSLAM and CPEs<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

6 Supply of ADSL2+<br />

Modem with Built<strong>in</strong> Splitter<br />

( CPE ) ,USB, ethernet<br />

and wireless ports etc<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

7 Supply of Portable ADSL<br />

Tester<br />

8 Supply of 8 port ADSL 2+<br />

extender confirm<strong>in</strong>g to<br />

technical specification of<br />

tender document.<br />

9 Supply of managed layer<br />

3 gigabit ethernet switch<br />

/router confirm<strong>in</strong>g to<br />

technical specification of<br />

tender document.<br />

10 Supply of router with<br />

G.703 and ethernet ports<br />

Set 5<br />

Nos. 1<br />

Nos. 2544<br />

Nos. 8<br />

Nos. 32<br />

Nos. 8<br />

Nos. 8<br />

19


confirm<strong>in</strong>g to technical<br />

specification<br />

11 Spares as per para 13 of LS 1<br />

SCC (detail of spares<br />

along with rates to be<br />

submitted by bidder)<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

Schedule-B (SERVICES)<br />

1 Installation , test<strong>in</strong>g and Set 3<br />

commssion<strong>in</strong>g of IP<br />

DSLAM and splitter<br />

System with equipped<br />

capacity of 528 Ports and<br />

expandable up to 640<br />

Ports with 2 Nos of<br />

Gigabit Ethernet Optical<br />

Upl<strong>in</strong>k Module ( 1000<br />

Base -LX , 10 KM )<br />

alongwith element<br />

management system,<br />

Rack, Sub-Racks, Power<br />

Supply, and Installation<br />

material like 528 Primary /<br />

Secondary MDF, Patch<br />

Cords , 12 Core FDF etc. ,<br />

alonwith splitter unit and<br />

associated equipment<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

2 Installation , test<strong>in</strong>g and Set 5<br />

commssion<strong>in</strong>g of IIP<br />

DSLAM and splitter<br />

System with equipped<br />

capacity of 192 Ports and<br />

expandable up to 256<br />

Ports with 2 Nos of<br />

Gigabit Ethernet Optical<br />

Upl<strong>in</strong>k Module ( 1000<br />

Base -LX , 10 KM )<br />

alongwith element<br />

management system,<br />

Rack, Sub-Racks, Power<br />

Supply, and Installation<br />

material like 192 Primary /<br />

20


Secondary MDF, Patch<br />

Cords , 12 Core FDF<br />

etc.alongwith splitter unit<br />

and associated equipment<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

3 Installation , test<strong>in</strong>g and Set 2544<br />

commssion<strong>in</strong>g of ADSL2+<br />

Modem with Built<strong>in</strong> Splitter<br />

( CPE ) ,USB, ethernet<br />

and wireless ports at<br />

various locations alongwith<br />

Installation Material like<br />

wir<strong>in</strong>gs and connectors ,<br />

rosette and splitter<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

4 Installation, test<strong>in</strong>g and Nos 32<br />

commissio<strong>in</strong>g of of 8 port<br />

ADSL 2+ extender<br />

confirm<strong>in</strong>g to technical<br />

specification of tender<br />

document.<br />

5 Installation, test<strong>in</strong>g and Nos. 8<br />

commissio<strong>in</strong>g of managed<br />

layer 3 gigabit ethernet<br />

switch /routerconfirm<strong>in</strong>g to<br />

technical specification of<br />

tender document.<br />

6 Installation, test<strong>in</strong>g and Nos 8<br />

commissio<strong>in</strong>g of router<br />

with G.703 and ethernet<br />

ports confirm<strong>in</strong>g to<br />

technical specification of<br />

tender document.<br />

7 Tra<strong>in</strong><strong>in</strong>g of Railway staff man<br />

weeks<br />

4<br />

21


Section – II<br />

Chapter – 1<br />

Instructions to<br />

Tenderer &<br />

Conditions of<br />

Tender<strong>in</strong>g<br />

22


Section – II<br />

Chapter – 1<br />

Instructions to Tenderer & Conditions of Tender<strong>in</strong>g<br />

INDEX<br />

1. GENERAL INSTRUCTIONS<br />

2. INTERPRETATIONS<br />

3. LOCAL CONDITIONS<br />

4. COMPLIANCE TO TENDER CONDITIONS, TECHNICAL<br />

SPECIFICATION & DRAWINGS<br />

5. EARNEST MONEY/BID GUARANTEE<br />

6. SUBMISSION OF OFFERS<br />

7. CONSTITUTION OF FIRM & POWER OF ATTORNEY<br />

8. UNIT PRICES<br />

9. VALIDITY OF OFFER<br />

10. RATES DURING NEGOTIATION<br />

11. INCOME TAX CLEARANCE CERTIFICATE<br />

12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH<br />

13. OPENING OF TENDER<br />

14. NON-TRANSFERABILITY & NON-REFUNDABILITY<br />

15. ERRORS OMISSIONS & DISCREPANCIES<br />

16. WRONG INFORMATION BY TENDERER<br />

17. CONSORTIUM BIDS<br />

18. QUALIFICATION CRITERIA<br />

19 DETERMINATION OF RESPONSIVENESS<br />

20. CORRECTION OF ERRORS<br />

23


21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES<br />

22. SYSTEM PERFORMANCE GUARANTEE<br />

23. AUTHORITY FOR ACCEPTANCE<br />

24. PURCHASE PREFERENCE<br />

25. AGREEMENT<br />

26. TENDERER'S ADDRESS<br />

27. FOREIGN EXCHANGE<br />

24


INSTRUCTIONS TO TENDERERS<br />

AND CONDITIONS OF<br />

TENDERING<br />

1. GENERAL INSTRUCTIONS:<br />

1.1 Chief Adm<strong>in</strong>istrative Officer, Indian Railway Project Management Unit, New<br />

Delhi, for and on behalf of the President of India <strong>in</strong>vites sealed Open tenders<br />

from the established, reliable and experienced manufacturers or their<br />

authorized agents with sufficient proven experience <strong>in</strong> similar work for the<br />

work of Design, Supply, Installation Test<strong>in</strong>g and commission<strong>in</strong>g of IP-<br />

DSLAM at various locations of Nothern & North Central Railways and<br />

Centre for Railway Electrification as given <strong>in</strong> the Preamble.<br />

1.2 The General Conditions of contract, Special Conditions of Contract,<br />

Instructions to Tenderers and Conditions of Tender<strong>in</strong>g, Technical<br />

Specifications, Preamble <strong>in</strong>clud<strong>in</strong>g Schedule of Work & Supplies <strong>in</strong>clud<strong>in</strong>g<br />

all Annexure & forms etc. shall, hereafter, be collectively referred to as the<br />

"Tender papers".<br />

1.3 Any clarifications required by the tenderer may be obta<strong>in</strong>ed from the Chief<br />

Adm<strong>in</strong>istrative Officer / IRPMU, Shivaji Bridge (IRCOT Complex), New<br />

Delhi 110001.<br />

2. INTERPRETATIONS:<br />

The follow<strong>in</strong>g terms wherever occurr<strong>in</strong>g <strong>in</strong> the tender papers and wherever<br />

used throughout the execution of the work, shall, unless excluded by or<br />

repugnant to the context, have the mean<strong>in</strong>g attributed there to as follows: -<br />

"CONTRACT" Means the Agreement or Work Order result<strong>in</strong>g from the<br />

acceptance by the Purchaser of this tender either <strong>in</strong> whole or <strong>in</strong> part.<br />

"CONTRACTOR” Means the successful Tenderer, i.e., the Tenderer<br />

whose Tender has been accepted either <strong>in</strong> whole or <strong>in</strong> part.<br />

“CONTRACTOR’S REPRESENTATIVE” Shall mean a person <strong>in</strong><br />

supervisory capacity who shall be so declared by the contractor and who shall<br />

be authorised under a duly executed power of attorney to receive materials<br />

issued by the Purchaser to the Contractor for the works. He shall be<br />

responsible for proper execution of works at each or all places and shall take<br />

orders from Purchaser's Eng<strong>in</strong>eers and carry out the same.<br />

25


"ENGINEER” Shall mean the Divisional Eng<strong>in</strong>eer/Divisional Electrical<br />

Eng<strong>in</strong>eer/Divisional Signal & Telecom. Eng<strong>in</strong>eer or the Assistant Eng<strong>in</strong>eers<br />

<strong>in</strong> executive charge of the Railway works and shall <strong>in</strong>clude the superior<br />

officers of the Railway. He is responsible for ensur<strong>in</strong>g that all field works<br />

covered by the contract are carried out <strong>in</strong> accordance with approved designs,<br />

draw<strong>in</strong>gs and specifications and conditions of contract as agreed to.<br />

“ENGINEER’S REPRESENTATIVE" Shall mean the Sr. Section<br />

Eng<strong>in</strong>eers/ Section Eng<strong>in</strong>eers <strong>in</strong> direct charge of the works of Signal &<br />

Telecom./Civil/Electrical Eng<strong>in</strong>eer<strong>in</strong>g department of Railway.<br />

"EQUIPMENT" Means all or any equipment considered necessary by the<br />

Purchaser's Eng<strong>in</strong>eers for the satisfactory operation, as a whole, of the<br />

<strong>in</strong>stallations.<br />

“GENERAL MANAGER” Means the officer <strong>in</strong> Adm<strong>in</strong>istrative charge of<br />

this Railway and shall mean and <strong>in</strong>clude the officers to whom the functions<br />

are delegated. His postal address shall be <strong>in</strong>timated to the successful<br />

Tenderers <strong>in</strong> due course.<br />

"MONTH” Means One English Calendar Month.<br />

"MATERIALS” Means all equipment, components, fitt<strong>in</strong>gs and other<br />

materials <strong>in</strong>clud<strong>in</strong>g raw materials required to complete the work.<br />

"PURCHASER” Means the President of India act<strong>in</strong>g through his accredited<br />

officers or any one of them. The Chief Adm<strong>in</strong>istrative Officer / IRPMU,<br />

North Central Railway New Delhi shall be deemed to be one of such<br />

accredited officers.<br />

Subject as otherwise provided <strong>in</strong> this contract, all notices to be given and all<br />

other action to be taken on behalf of President of India may be given or taken<br />

on his behalf by General Manager, North Central Railway Allahabad/ Chief<br />

Adm<strong>in</strong>istrator Officer, IRPMU, IRCOT Complex, Shivaji Bridge, New Delhi<br />

or any other representative of the North Central Railway Adm<strong>in</strong>istration<br />

nom<strong>in</strong>ated by him.<br />

“PURCHASER’S ENGINEERS" Means the Chief Adm<strong>in</strong>istrative Officer /<br />

IRPMU North Central Railway or successor who will decide all matters<br />

relat<strong>in</strong>g to survey, design, manufacture, <strong>in</strong>stallation and commission<strong>in</strong>g of<br />

the plant and equipment at site.<br />

"RAILWAY” Shall mean the President of the Republic of India or the<br />

Adm<strong>in</strong>istrative Officers of the Railway or of the successor Railway<br />

authorised to deal with any matters with which these present are concerned<br />

on his behalf.<br />

26


"SUB-CONTRACTOR" Means an <strong>in</strong>dividual or a firm of Contractor<br />

or a Company registered under Indian Company Act or an approved supplier<br />

of materials to whom the Contractor sublets portions of the contract after<br />

obta<strong>in</strong><strong>in</strong>g specific prior approval of the Purchaser <strong>in</strong> writ<strong>in</strong>g to sub-lett<strong>in</strong>g of<br />

contract.<br />

"SITE" Means the areas to be taken up for the execution of works,<br />

together with any other area or areas as shall be determ<strong>in</strong>ed by the<br />

Purchaser's Eng<strong>in</strong>eers, which may be placed at the disposal of the Contractor<br />

for the purpose of the contract and also such area or areas as the Purchaser'<br />

Eng<strong>in</strong>eers may have authorised as an extension of the site, irrespective of the<br />

terms and conditions under which they are occupied by the Contractor.<br />

"TENDERER" Means and <strong>in</strong>cludes any firm of eng<strong>in</strong>eers or Contractors or<br />

any company or body, corporate or otherwise, who submit the Tender which<br />

has been <strong>in</strong>vited.<br />

“WORK OR WORKS" Means all or any of the items of the work for<br />

which the Tenderer/ Contractor has Tendered/contracted accord<strong>in</strong>g to the<br />

specifications, draw<strong>in</strong>gs and Annexure hereto annexed or to be implied there<br />

from, or <strong>in</strong>cidental thereto or to be hereafter specified or required <strong>in</strong><br />

such explanatory <strong>in</strong>structions and draw<strong>in</strong>gs, be<strong>in</strong>g <strong>in</strong> conformity with the<br />

orig<strong>in</strong>al specifications, draw<strong>in</strong>gs, Annexure and schedules, and also such<br />

<strong>in</strong>structions and draw<strong>in</strong>gs additional to the aforementioned as may from time<br />

to time be issued by the Purchaser's Eng<strong>in</strong>eer dur<strong>in</strong>g the progress of the<br />

contracted work.<br />

"WRITING" Includes all matters written, typewritten or pr<strong>in</strong>ted either <strong>in</strong><br />

whole or <strong>in</strong> part.<br />

3. LOCAL CONDITIONS :<br />

3.1 It will be imperative on each tenderer to fully acqua<strong>in</strong>t himself with all the<br />

local conditions and factors which would have any effect on the<br />

performance of the contract and cost of the stores. The purchaser shall not<br />

enterta<strong>in</strong> any request for clarifications from the tenderer regard<strong>in</strong>g such local<br />

conditions. No request for the change of price or time schedule of delivery of<br />

stores shall be enterta<strong>in</strong>ed after the offer is accepted by the purchaser on<br />

account of any local condition or factor.<br />

3.2 In the event of the tenderer desir<strong>in</strong>g to have a field survey before furnish<strong>in</strong>g<br />

his quotations, he may apply to Railways for permission <strong>in</strong> this regard. Such<br />

permission will be given <strong>in</strong> writ<strong>in</strong>g by the Railways but the expenses <strong>in</strong> this<br />

regard will be borne by the tenderer completely.<br />

3. 3 The <strong>in</strong>tend<strong>in</strong>g tenderer is advised to study the tender papers carefully. Any<br />

submission of a quotation by the tenderer shall be deemed to have been done<br />

after a careful study and exam<strong>in</strong>ation of these documents with full<br />

27


understand<strong>in</strong>g of the implication thereof. These conditions and specifications<br />

shall be deemed to have been accepted unless otherwise, specifically<br />

commented upon by the Tenderer <strong>in</strong> his quotation. Failure to adhere to<br />

anyone or all these <strong>in</strong>structions may render his offer liable to be ignored<br />

without any reference.<br />

3.4 Should a tenderer f<strong>in</strong>d discrepancies <strong>in</strong> or omission from the draw<strong>in</strong>g or any<br />

of the Tender papers or he has any doubt to their mean<strong>in</strong>g, he should at once<br />

notify the Railway who may send a written clarification to all tenderers.<br />

4. COMPLIANCE TO TENDER CONDITIONS, TECHNICAL<br />

SPECIFICATION & DRAWINGS :<br />

4.1 Tenderer should note that the IP DSLAM equipment offered should be<br />

complete and compatible with the Railway equipments <strong>in</strong>stalled on Indian<br />

Railways. Any equipment/work required to make the <strong>in</strong>terface equipments<br />

match with Railway equipments is the responsibility of the contractor. Indian<br />

Railway will not undertake any change <strong>in</strong> their equipments, nor shall bear any<br />

extra cost on account of changes/addition required for ensur<strong>in</strong>g compatibility<br />

of <strong>in</strong>terface devices with their equipments.<br />

4.2 The tenderer shall <strong>in</strong>dicate paragraph by paragraph for each section and each<br />

clause and sub-clause of all annexure of technical specifications of the tender<br />

document that either his tender complies <strong>in</strong> every respect with the<br />

requirements of each clause and sub-clause or if not, precisely how they differ<br />

from the requirements of the tenderer. In later case, the tenderer shall enclose<br />

a separate statement as per pro-forma given, <strong>in</strong>dicat<strong>in</strong>g only the deviations for<br />

any clause or sub-clause of General Conditions of Contract, Special<br />

Conditions of Contract, Instructions to tenderers and conditions of tender<strong>in</strong>g,<br />

Technical Specification, Preamble etc. which he proposes with "detailed<br />

justifications for deviations proposed". The purchaser, reserves the right to<br />

accept or reject these deviations and his decision thereon shall be f<strong>in</strong>al (see<br />

Form 5).<br />

4.3 The equipment & material offered shall be <strong>in</strong> accordance with the draw<strong>in</strong>gs<br />

and specifications. Details of variation from the draw<strong>in</strong>gs and specifications,<br />

if any, should be clearly <strong>in</strong>dicated and <strong>in</strong> such an event, a certificate from the<br />

users must be furnished to the effect that the product offered performs the<br />

requisite functions satisfactorily & is an alternative acceptable <strong>in</strong> one or more<br />

other countries. The name of users <strong>in</strong> those foreign countries should also be<br />

<strong>in</strong>dicated.<br />

4.4 Firms who have not carried out the works and supplied the items tendered for<br />

<strong>in</strong> this case for the Indian Railways <strong>in</strong> the past should give details of supplies<br />

and works carried out and the customers along with their performance<br />

certificates.<br />

5. EARNEST MONEY/BID GUARANTEE :<br />

28


5.1 The tenderer shall deposit <strong>in</strong> favour of the Dy F<strong>in</strong>ancial Adviser & Chief<br />

Accounts Officer, IRPMU, Shivaji Bridge,NewDelhi-110001, a sum of Rs.<br />

251190/- (Rupees Two lakhs fifty one thousand one hundred n<strong>in</strong>ety only) as<br />

Earnest Money.<br />

5.2 The Earnest Money receipt shall be <strong>in</strong>corporated <strong>in</strong> the orig<strong>in</strong>al copy of the<br />

tender document. The other copies of the offer shall conta<strong>in</strong> true copies of<br />

Earnest Money receipt. The Earnest Money should be furnished either <strong>in</strong><br />

cash or <strong>in</strong> any of the follow<strong>in</strong>g forms:<br />

(a) Deposit receipt, pay orders, Demand Drafts. These should be either of the<br />

State Bank of India or any of the Nationalised Bank. No confirmatory advice<br />

from the Reserve Bank of India will be necessary.<br />

(b) Deposit receipt executed by the Schedule Banks (other than the State<br />

Bank of India and the Nationalised Banks) approved by RBI for this<br />

purpose. The Railways will not, however accept deposit receipt without<br />

gett<strong>in</strong>g <strong>in</strong> writ<strong>in</strong>g the concurrence of the RBI.<br />

NOTE: (a) In case the Earnest Money is deposited <strong>in</strong> cash the payment should be<br />

made to the Chief Cashier, North Central Railway, Allahabad and cash<br />

receipts obta<strong>in</strong>ed from him should be furnished along with the tender.<br />

(b)<br />

Deposit receipts, Pay Order and Demand Drafts should be drawn <strong>in</strong> favour of<br />

the Dy F<strong>in</strong>ancial Adviser & Chief Accounts Officer, IRPMU, Shivaji Bridge,<br />

New Delhi 110001, and endorsed "Account Payee". These <strong>in</strong>struments<br />

should be valid at least for the period cover<strong>in</strong>g the validity of the offer.<br />

5.3 No reference to the previous deposit of Earnest Money & Security Deposit for<br />

adjustment aga<strong>in</strong>st the present tender will be accepted and any request for<br />

recovery from any Security Deposit aga<strong>in</strong>st present tender will not be<br />

enterta<strong>in</strong>ed.<br />

5.4 The Earnest Money shall rema<strong>in</strong> deposited with the Purchaser for the period<br />

of 180 days from the date of open<strong>in</strong>g of the tender. If the validity of the offer<br />

is extended, the Earnest Money Deposit duly extended shall also be furnished,<br />

fail<strong>in</strong>g which the offer after the expiry of the aforesaid period shall not be<br />

considered by the Purchaser.<br />

5.5 No <strong>in</strong>terest will be payable by the Purchaser on the Earnest Money.<br />

5.6 The Earnest Money deposited is liable to be forfeited if the tenderer<br />

withdraws or amends impairs or derogates from the tender <strong>in</strong> any respect<br />

with<strong>in</strong> the period of validity of his offer.<br />

5.7 The Earnest Money of the successful tenderer will be returned after the<br />

contract Performance Guarantee (Security Deposit) as required under the<br />

29


special conditions of contract is furnished and formal contract duly signed is<br />

received by the Purchaser.<br />

5.8 If the successful tenderer fails to furnish a Contract Performance Guarantee<br />

& Security Deposit) as required <strong>in</strong> the Special Conditions of Contract and<br />

fails to return the formal contract duly signed with<strong>in</strong> (30) thirty days of the<br />

receipt of the formal contract, then the Earnest Money shall be liable to be<br />

forfeited by the Purchaser.<br />

5.9 The Earnest Money of all unsuccessful tenderers will be returned by the<br />

Purchaser with<strong>in</strong> reasonable time after the f<strong>in</strong>alisation of the tender.<br />

5.10 Any tender not accompanied by Earnest Money <strong>in</strong> one of the approved forms<br />

will be summarily rejected.<br />

6. SUBMISSION OF OFFERS:<br />

6.1 All offers <strong>in</strong> the prescribed forms should be submitted before the time and<br />

date fixed for the receipt of the offers. Offers received after the stipulated<br />

time and date will be dealt with as per rules <strong>in</strong> vogue <strong>in</strong> the Railways.<br />

6.2 In case the date of open<strong>in</strong>g happens to be a holiday or Bandh, the tender will<br />

be received and opened at the same time on the next work<strong>in</strong>g day.<br />

6.3 All offers shall be either type written or written neatly <strong>in</strong> <strong>in</strong>delible <strong>in</strong>k <strong>in</strong><br />

English. Each page of the offer must be numbered consecutively. A reference<br />

to total number of pages compris<strong>in</strong>g the offer must be made at the top right<br />

hand corner of the top page. All the support<strong>in</strong>g documents should be<br />

submitted either <strong>in</strong> orig<strong>in</strong>al or duly attested by a gazetted officer or notary<br />

public unless stated otherwise <strong>in</strong> these documents. The orig<strong>in</strong>al documents<br />

shall be produced for verification when called for.<br />

6.4 All copies of the tender paper shall be signed <strong>in</strong> <strong>in</strong>k by the tenderer, on each<br />

page <strong>in</strong>clud<strong>in</strong>g clos<strong>in</strong>g page, <strong>in</strong> token of his hav<strong>in</strong>g studied the Tender papers<br />

carefully.<br />

6.5 RATES IN FIGURES & WORDS: - All prices and other <strong>in</strong>formation like<br />

discounts etc. hav<strong>in</strong>g a bear<strong>in</strong>g on the price shall be written both <strong>in</strong> figures<br />

and <strong>in</strong> words <strong>in</strong> the prescribed offer form. In case of difference <strong>in</strong> words and<br />

figures the amount written <strong>in</strong> words will be taken <strong>in</strong>to consideration.<br />

6.6 ATTESTATION OF ALTERATION: - No scribbl<strong>in</strong>g is permissible <strong>in</strong> the<br />

tender documents. Tender conta<strong>in</strong><strong>in</strong>g erasures and alterations <strong>in</strong> the tender<br />

documents are liable to be rejected. Any correction made by the tenderer/<br />

tenderers <strong>in</strong> his/their entries must be attested by him/them.<br />

6.7 The tenderer shall submit his tender <strong>in</strong> two copies <strong>in</strong> sealed cover. Each copy<br />

of the tender shall be complete <strong>in</strong> all respects. The two copies should be<br />

30


marked "Orig<strong>in</strong>al" and “Duplicate”. The orig<strong>in</strong>al tender paper purchased from<br />

this office shall be returned duly signed along with the orig<strong>in</strong>al offer. Tenderer<br />

submitt<strong>in</strong>g downloaded tender document, should submit cost of tender document as<br />

given <strong>in</strong> tender notice <strong>in</strong> the form of Pay order/Demand Draft from a<br />

Nationalized/Scheduled IndianBank drawn <strong>in</strong> favour of Dy FA & CAO / IRPMU<br />

New Delhi along with bid.<br />

6.8 The tender shall conta<strong>in</strong> details mentioned <strong>in</strong> sub para a and b. Bids shall be<br />

sealed <strong>in</strong> envelope. All the envelopes should bear the tender number with its<br />

description and date of clos<strong>in</strong>g/open<strong>in</strong>g clearly written on it and addressed to<br />

the Chief Adm<strong>in</strong>istrative Officer, IRPMU, Shivaji Bridge (IRCOT complex)<br />

New Delhi 110001.<br />

(a)<br />

Full Technical specifications of the equipment and sub systems. A brief<br />

outl<strong>in</strong>e of the system be<strong>in</strong>g proposed along with diagrams and draw<strong>in</strong>gs,<br />

description of the equipment and materials used <strong>in</strong> the system, along with<br />

cross reference to the equipment specifications shall be enclosed.<br />

(b) The bid shall consist of the follow<strong>in</strong>g :-<br />

i) Offer letter complete. Form No.1<br />

ii)<br />

iii)<br />

iv)<br />

Schedule of Supply and Execution.<br />

Earnest money <strong>in</strong> prescribed form. (Para 5.0 of I.T.T.)<br />

Clause-wise compliance to tender conditions & Statements of deviations.<br />

Form No. 5 (Para 4 of I.T.T.)<br />

v) A copy of partnership deed and affidavit for proprietorship. (Para 7 of I.T.T.)<br />

vi)<br />

vii)<br />

viii)<br />

ix)<br />

Consortium agreement must accompany with the bid if the tenderer will<strong>in</strong>g to<br />

form consortia (Para 17 of I.T.T.).<br />

Tenderer's credentials and will<strong>in</strong>gness of orig<strong>in</strong>al manufacturer as per Form<br />

No.13 Qualify<strong>in</strong>g Criteria (General) (Para 18.1 of I.T.T.).<br />

Similar works executed. (para 18.2 of I.T.T.)<br />

Works <strong>in</strong> hand (para 18.2 of I.T.T.)<br />

x) Income Tax Clearance Certificate and audited balance sheet (Para 18.3 of<br />

I.T.T.)<br />

xi)<br />

xii)<br />

Eng<strong>in</strong>eer<strong>in</strong>g Organisation. (Para 18.5 of I.T.T.)<br />

Construction Mach<strong>in</strong>ery. (Para 18.6 of I.T.T.)<br />

31


xiii) Details of recommended Spares with quantities (S.C.C. Para 13).<br />

xiv) Details of special tools & <strong>in</strong>stallation materials (S.C.C. Para 10).<br />

xv)<br />

xvi)<br />

xvii)<br />

System performance guarantee (Para 22 of I.T.T.).<br />

Tenderers scheme of work and Time Schedule (Para 12 of I.T.T.).<br />

Complete technical data and particulars of the equipment offered, as specified<br />

<strong>in</strong> the Tender papers together with descriptive literature, leaflets etc.<br />

Draw<strong>in</strong>gs, if any, complete with list (Para 18.4 of I.T.T.).<br />

xviii) Name of manufacturers, place of manufacture and the certificate for proven<br />

design and performance (Para 18.4 of I.T.T.)<br />

xix)<br />

xx)<br />

xxi)<br />

xxii)<br />

Technical proposal of the tenderer <strong>in</strong> conformity with system design or<br />

alternative proposal of the tenderer, if any.<br />

Any other <strong>in</strong>formation desired to be submitted by the tenderer.<br />

The price of each item quoted exactly accord<strong>in</strong>g to the rate schedule given <strong>in</strong><br />

the tender document.<br />

Any other <strong>in</strong>formation as asked for <strong>in</strong> the preamble, Special conditions of<br />

contract or relevant to tender.<br />

7. CONSTITUTION OF FIRM & POWER OF ATTORNEY:<br />

7.1 Any <strong>in</strong>dividual(s) sign<strong>in</strong>g the tender or other documents connected therewith<br />

should specify whether he is sign<strong>in</strong>g: -<br />

(a) As sole proprietor of the concern or as attorney of the sole proprietor;<br />

(b) As a partner or partners of the firm;<br />

(c) As a Director, Manager or Secretary <strong>in</strong> the case of Limited Company duly<br />

authorised by a resolution passed by the Board of Directors or <strong>in</strong> pursuance of<br />

the authority conferred by Memorandum of Association.<br />

7.2 In the case of a firm not registered under the Indian Partnership Act, the<br />

names of all the exist<strong>in</strong>g partners and their full particulars should be furnished<br />

at the time of submitt<strong>in</strong>g the tender and all the partners with their full<br />

particulars or the attorney duly authorised by all of them should sign the<br />

tender and all other connected documents. The orig<strong>in</strong>al power of attorney or<br />

other documents empower<strong>in</strong>g the <strong>in</strong>dividual or <strong>in</strong>dividuals to sign should be<br />

furnished to the Purchaser for verification, if required.<br />

7.3 The Railway will not be bound by Power of Attorney granted by the tenderer<br />

or by the changes <strong>in</strong> the composition of the firm made subsequent to the<br />

execution of the contract. It may, however, recognise such power of attorney<br />

32


and advice, the cost of which will be chargeable to the contractor. These<br />

charges have been fixed at Rs.100/- (Rs. One Hundred only) payable by the<br />

tenderer at the time of submitt<strong>in</strong>g the Power of Attorney for Scrut<strong>in</strong>y and<br />

legal advice.<br />

7.4 In case where the Power of Attorney partnership deed has not been executed<br />

<strong>in</strong> English, the true and authenticated copies of the translation of the same by<br />

Advocate, authorised translators of Courts and Licensed Petition Writers<br />

should be supplied by the Contractor(s) while tender<strong>in</strong>g for the work.<br />

7.5 The cancellation of any documents such as Power of Attorney, Partnership<br />

deed etc. should be forthwith communicated by the contractor to the Railway<br />

Adm<strong>in</strong>istration <strong>in</strong> writ<strong>in</strong>g fail<strong>in</strong>g which the Railway Adm<strong>in</strong>istration shall<br />

have neither responsibility nor liability for any act so taken on the strength of<br />

the said documents.<br />

8. UNIT PRICES:<br />

8.1 It is necessary for the rate to be quoted separately on unit basis for each item<br />

shown <strong>in</strong> the Schedule of works.<br />

8.2 The unit Prices should be quoted by the Contractor after tak<strong>in</strong>g all the<br />

relevant factors <strong>in</strong>to consideration and these should be Firm and all <strong>in</strong>clusive<br />

without any variation clauses. The prices shall be quoted <strong>in</strong> Indian Rupees for<br />

the units under metric system. Reference may be made to para-38 of Special<br />

Conditions of Contract.<br />

8.3 Necessary 'D' form will be issued by the Railway adm<strong>in</strong>istration on<br />

Contractor’s name only for supply of materials where Central Sales Tax is<br />

levied. The tenderer may take this consideration <strong>in</strong>to account while quot<strong>in</strong>g<br />

the rates.<br />

9. VALIDITY OF OFFER:<br />

9.1 The tenderer shall keep the offer open for a m<strong>in</strong>imum period of 180 days from<br />

the date of open<strong>in</strong>g of the tender. With<strong>in</strong> that period, the tenderer can not<br />

withdraw his offer subject to the period be<strong>in</strong>g extended further if required by<br />

mutual agreement from time to time. Any contravention of the above<br />

condition will make the tenderer liable for forfeiture of his Earnest Money<br />

Deposit.<br />

10. RATES DURING NEGOTIATION:<br />

10.1 The tenderer/s shall not <strong>in</strong>crease his/their quoted rates <strong>in</strong> case the Railway<br />

Adm<strong>in</strong>istration negotiate for reduction of rates, such a negotiation shall not<br />

amount to cancellation or withdrawal of the orig<strong>in</strong>al offer and the rates<br />

orig<strong>in</strong>ally quoted will be b<strong>in</strong>d<strong>in</strong>g on the tenderer/s.<br />

33


11. INCOME TAX CLEARANCE CERTIFICATE:<br />

11.1 The Tenderers are required to enclose along with the tender a Photostat copy<br />

of the valid Income Tax clearance certificate duly attested by Notary Public.<br />

The Tenderer will however submit the orig<strong>in</strong>al Income Tax clearance<br />

certificate whenever asked for by the purchaser for verification.<br />

12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH:<br />

12.1 The works/work are/is to be completed with<strong>in</strong> a period as mentioned <strong>in</strong><br />

preamble from the date of issue of Letter of Acceptance of the tender.<br />

12.2 The Tenderer shall enclose with his offer the scheme of work and time<br />

schedule <strong>in</strong> the form of PERT chart <strong>in</strong>dicat<strong>in</strong>g all activities & show<strong>in</strong>g the<br />

period of time that he will take for the various items of work listed there<strong>in</strong>.<br />

The Tenderer shall <strong>in</strong>dicate <strong>in</strong> the form of notes to the schedule the<br />

assumptions and the basis adopted for the preparation of the time schedule.<br />

12.3 The Successful Tenderer shall, however, submit their f<strong>in</strong>al programme <strong>in</strong><br />

consultation with Eng<strong>in</strong>eer of the project <strong>in</strong> terms of clause 6 of Special<br />

Condition of Contract.<br />

13. OPENING OF TENDER:<br />

13.1 The tender will be opened at the time & date of open<strong>in</strong>g of the tender given <strong>in</strong><br />

the preamble <strong>in</strong> presence of such Tenderers/Representatives who choose to be<br />

present.<br />

13.2 If the offers are sent by post, should be sent only by registered post with<br />

acknowledgement due addressed to the Chief Adm<strong>in</strong>istrative Officer,<br />

IRPMU, Shivaji Bridge (IRCOT complex) New Delhi 110001 before the<br />

clos<strong>in</strong>g time and date given <strong>in</strong> preamble.<br />

14. NON-TRANSFERABILITY & NON-REFUNDABILITY: -<br />

The tender documents are not transferable. The cost of tender paper is not<br />

refundable.<br />

15. ERRORS OMISSIONS & DISCREPANCIES:<br />

The Contractor(s) shall not take any advantage of any mis<strong>in</strong>terpretation of the<br />

conditions due to typ<strong>in</strong>g or any other error and if <strong>in</strong> doubt, shall br<strong>in</strong>g it to the<br />

notice of the Eng<strong>in</strong>eer, without delay. In case of any contradiction only the<br />

pr<strong>in</strong>ted rules, and books should be followed and no claim for the<br />

mis<strong>in</strong>terpretation shall be enterta<strong>in</strong>ed.<br />

16. WRONG INFORMATION BY TENDERER:<br />

34


If the tenderer/s deliberately gives/give wrong <strong>in</strong>formation <strong>in</strong> his/their tender,<br />

creates/create circumstances for the acceptance of his/their tender, the<br />

Railway reserve the right to reject such tender at any stage.<br />

17. CONSORTIUM BIDS:<br />

17.1 In view of nature of work covered <strong>in</strong> the Bid documents, it is anticipated that<br />

some of the <strong>in</strong>tend<strong>in</strong>g bidders will pool their resources and experience to form<br />

consortia. In their own <strong>in</strong>terest, the bidders who form such consortia are<br />

advised to <strong>in</strong>vestigate capabilities, availability of resources, experienced<br />

personnel, f<strong>in</strong>ancial soundness, past experience and concurrent engagements<br />

of constitut<strong>in</strong>g partners.<br />

17.2 Consortia of bidders, if any must clearly def<strong>in</strong>e role/scope of work of each<br />

partner/member. Further the legal agreement for a consortium must<br />

accompany the bid and should clearly def<strong>in</strong>e the leader of such a consortium<br />

who will be the prime contractor and will be responsible for timely<br />

completion of work as also dur<strong>in</strong>g execution of work, if awarded, co-ord<strong>in</strong>ate<br />

with Purchaser on behalf of the consortium, receive payments for the works<br />

executed and be liable for due performance of the contract <strong>in</strong> all respect. The<br />

tenderer must clearly write whether the offer is Consortium Bid or not.<br />

Remarks like ‘Complied’, ‘Noted’ will not suffice. In absence of clear<br />

submission, the offer will not be considered as Consortium Bid.<br />

17.3 Qualification documents, details etc., must however, be provided for each<br />

member firm complete <strong>in</strong> all respects strictly <strong>in</strong> requisite pro-forma.<br />

17.4 A consortium formed will not be subject to alteration with regard to change <strong>in</strong><br />

constitut<strong>in</strong>g firms and/or reorientation of roles. Any changes if proposed by<br />

consortium to take advantage of certa<strong>in</strong> developments dur<strong>in</strong>g evaluation stage<br />

will render the bid liable to be rejected. As all details are required to be<br />

furnished along with the bids and should be critically exam<strong>in</strong>ed dur<strong>in</strong>g<br />

evaluation of bids, it is imperative that such details should have been<br />

thoroughly exam<strong>in</strong>ed as a safeguard aga<strong>in</strong>st a possible disqualification of bids<br />

on these grounds.<br />

17.5 All partners of the consortium shall be jo<strong>in</strong>tly and severally liable to the<br />

purchaser for the execution of the entire contract <strong>in</strong> accordance with its terms.<br />

18. QUALIFICATION CRITERIA:<br />

18.1 GENERAL:<br />

18.1.1 Qualification criteria under this para lays down m<strong>in</strong>imum acceptable<br />

qualifications <strong>in</strong> various areas to ensure that qualified bidder has necessary<br />

experience, expertise, f<strong>in</strong>ancial and human resources to successfully complete<br />

the project. In case of a consortium bid, the qualification document details<br />

etc. must be provided for each member of consortium.<br />

35


18.1.2 If the tenderer proposes to buy any equipment from other suppliers/sources,<br />

documents <strong>in</strong>dicat<strong>in</strong>g their will<strong>in</strong>gness to supply the equipment and provide<br />

technical support to the tenderer that may be required dur<strong>in</strong>g <strong>in</strong>stallation,<br />

commission<strong>in</strong>g and warranty period and later on directly to the railways, shall<br />

be <strong>in</strong>cluded <strong>in</strong> the tender. Qualification documents and other details for such<br />

supplier shall be <strong>in</strong>cluded <strong>in</strong> the tender.<br />

18.1.3 The tenderer should submit the details of experience <strong>in</strong> works and services <strong>in</strong><br />

projects of similar nature br<strong>in</strong>g<strong>in</strong>g out clearly the expertise <strong>in</strong> the equipment<br />

manufacture, <strong>in</strong>stallation of IP based network.<br />

18.1.4 The tenderer shall complete the pro-forma at Form No.13 and submit a<br />

certificate from the orig<strong>in</strong>al user for whom the project was undertaken<br />

certify<strong>in</strong>g the date of award of contract, date of completion, date of<br />

commission<strong>in</strong>g and the present work<strong>in</strong>g state of the system so established.<br />

The tenderer shall provide these details for all the projects that he has<br />

executed which satisfy the m<strong>in</strong>imum requirements <strong>in</strong> each case.<br />

18.2 MINIMUM ELIGIBILITY:<br />

The tenderer or the consortium should have m<strong>in</strong>imum eligibility criteria as<br />

given <strong>in</strong> the table below:<br />

18.2.1 The tenderer should have completed successfully at least one work of similar<br />

nature to that of this tender cost<strong>in</strong>g not less than 35% of advertised value of the<br />

tender, <strong>in</strong> the last three f<strong>in</strong>ancial years (i.e. current year and three previous<br />

f<strong>in</strong>ancial years.) Mean<strong>in</strong>g of similar work for this tender is as under:<br />

“Supply, Installation, test<strong>in</strong>g and commission<strong>in</strong>g of IP based network”<br />

18.2.2 As a proof of sufficient f<strong>in</strong>ancial capacity and organizational resources, contractor<br />

should have received total payment aga<strong>in</strong>st satisfactory execution of<br />

completed/ongo<strong>in</strong>g works (of all types) dur<strong>in</strong>g preced<strong>in</strong>g three years as per<br />

current ITCC/Audited Balance Sheet of a value not less than 150% of the<br />

advertised cost of work.<br />

18.3 FINANCIAL:<br />

18.3.1 The tenderer should produce:<br />

i) Latest Income Tax clearance certificate.<br />

ii)<br />

Audited Balance Sheet and Income statement of just concluded year. Audited<br />

Balance sheets of last 3 years shall be supplied to assess f<strong>in</strong>ancial soundness f<br />

the tenderer<br />

18.3.2 The tenderer shall furnish such documents as to establish the f<strong>in</strong>ancial<br />

soundness of his company as well as that of other companies if more than one<br />

36


company is <strong>in</strong>volved <strong>in</strong> bidd<strong>in</strong>g for this tender. The latest balance sheet,<br />

audited or certified by a neutral agency shall be furnished.<br />

18.3.3 The bidder shall submit required <strong>in</strong>formation <strong>in</strong> a separate Annexure and also<br />

a certificate from the user for whom the project was executed about the<br />

correctness of the dates <strong>in</strong>volved and satisfactory performance of the<br />

equipment/system.<br />

18.4 TECHNOLOGY & EQUIPMENT:<br />

18.4.1 The requirement of the system has been described <strong>in</strong> para 2 of Preamble.<br />

System offered shall comply with this para and as per the technical<br />

specification of the tender document.<br />

18.4.2 The tenderer shall clearly identify the sources from which the equipment to be<br />

supplied under this tender will be obta<strong>in</strong>ed. Specific attention is drawn to para<br />

16 of Special Conditions of Contract.<br />

18.4.2.1The bidders should clearly <strong>in</strong>dicate the technology for which the offer has<br />

been made. If it is a case of transfer of technology, the details such as name of<br />

technology, name of company etc. should be given and the copy of<br />

Memorandum of Understand<strong>in</strong>g for transfer of technology and RBI clearance,<br />

if applicable, should be enclosed.<br />

18.4.2.2 Preference will be given to vender offer<strong>in</strong>g transfer of technology and<br />

subsequent manufactur<strong>in</strong>g <strong>in</strong> India.<br />

18.4.3 All equipment proposed to be used shall be of proven design and performance.<br />

The equipment of same family shall have been successfully commissioned<br />

and rema<strong>in</strong>ed <strong>in</strong> service at least for a period of two year on the date of tender<br />

submission. Certificate from the actual user of the equipment about<br />

satisfactory performance shall be enclosed with the tender. Any equipment<br />

proposed to be manufactured with foreign collaborator shall be covered by the<br />

performance guarantee of the foreign collaborator.<br />

Equipment not available <strong>in</strong>digenously nor proposed to be manufactured with<br />

foreign collaboration with<strong>in</strong> the time schedule of the contract, shall be<br />

covered by the performance guarantee of the orig<strong>in</strong>al foreign manufacturer.<br />

Such equipment shall have been <strong>in</strong> field service at least for a period of one<br />

year on the date of submission of the tender. Certificate from the actual user<br />

of the equipment about the satisfactory performance shall be enclosed with<br />

the tender. The tenderer shall submit a declaration from those orig<strong>in</strong>al<br />

equipment manufacturers regard<strong>in</strong>g their Indian agent and the service support<br />

available with<strong>in</strong> the country.<br />

18.5 ENGINEERING ORGANISATION:<br />

37


18.5.1 The tenderer shall make an assessment of the requirement of personnel for<br />

execution of this project and shall give details as to how he proposes to<br />

mobilise all technical manpower required for the project. Details of the<br />

qualification and experience of the personnel identified for project execution<br />

shall be <strong>in</strong>cluded <strong>in</strong> the tender.<br />

18.5.2 The successful tenderer shall appo<strong>in</strong>t a Project Manager who would have<br />

adequate experience <strong>in</strong> project management of similar nature, unless the<br />

railway so desire, the Project Manager should preferably be reta<strong>in</strong>ed till all<br />

the obligations under the contract have been fulfilled.<br />

18.5.3 The tenderers shall have at least one graduate Eng<strong>in</strong>eer and two experienced<br />

supervisors (Diploma Holders) hav<strong>in</strong>g 5/6 years experience <strong>in</strong> the relevant<br />

field, supported by at least 5 Nos. of artisan staff.<br />

18.5.4 Tenderer shall advise the number of Eng<strong>in</strong>eers, Supervisors and Cable<br />

Jo<strong>in</strong>ters/Artisans employed by him or go<strong>in</strong>g to be employed by him with their<br />

names, qualifications bio-data and experience <strong>in</strong> this particular trade under<br />

consideration along with the Tender positively. Irrevocable letters of<br />

commitment of the said Supervisors and Key Technicians/Artisans for do<strong>in</strong>g<br />

the work shall be furnished along with Tender Papers if they are not already<br />

<strong>in</strong> employment of the Tenderer.<br />

18.6 CONSTRUCTION MACHINERY:<br />

The firm should have m<strong>in</strong>imum construction mach<strong>in</strong>ery, Tools and plants, test &<br />

measur<strong>in</strong>g <strong>in</strong>struments, Vehicles etc. Details of which will be furnished by them<br />

along with the bid.<br />

No tools and plants, scaffold<strong>in</strong>g materials for shutter<strong>in</strong>g, enter<strong>in</strong>g, shor<strong>in</strong>g etc.<br />

shall be supplied by the Railway and contractor will have to make his own<br />

arrangement for execution of the work.<br />

38


19 DETERMINATION OF RESPONSIVENESS –<br />

19.1 Purchaser will determ<strong>in</strong>e whether each bid is substantively responsive to the<br />

equipment of the bidd<strong>in</strong>g documents.<br />

19.2 For the purpose of this Clause, a substantively responsive bid is one, which<br />

conforms to all the terms, conditions and specifications of the bidd<strong>in</strong>g<br />

documents without material deviation or reservation. A material deviation or<br />

reservation is one, which affects <strong>in</strong> substantial way the scope, quality or<br />

performance of the works, or which limits <strong>in</strong> any substantial way, <strong>in</strong>consistent<br />

with the bidd<strong>in</strong>g documents, the Purchaser’s right or the bidder’s obligations<br />

under the Contract and the rectification of which deviation or reservation<br />

would affect unfairly the competitive position of other bidders present<strong>in</strong>g<br />

substantively responsive bids.<br />

20. CORRECTION OF ERRORS –<br />

20.1 Bids determ<strong>in</strong>ed to be substantively responsive will be checked by the<br />

Purchaser for any arithmetic errors <strong>in</strong> computation and summation. The<br />

Purchaser will correct errors as follows: -<br />

a) Where there is a discrepancy between amounts <strong>in</strong> figures and <strong>in</strong> words, the<br />

amount <strong>in</strong> words will <strong>gov</strong>ern; and<br />

b) Where there is a discrepancy between the unit rate and the total amount<br />

derived from the multiplication of the unit rate and the quantity, the unit rate<br />

as quoted will <strong>gov</strong>ern, unless <strong>in</strong> the op<strong>in</strong>ion of the Purchaser there is an<br />

obviously gross misplacement of the decimal po<strong>in</strong>t <strong>in</strong> the unit rate, <strong>in</strong> which<br />

event the total amount as quoted will <strong>gov</strong>ern and the unit rate will be<br />

corrected.<br />

20.2 The amount stated <strong>in</strong> the Form of Bid will be adjusted by the Purchaser <strong>in</strong><br />

accordance with the above procedure for the correction of errors and with the<br />

concurrence of the bidder, shall be considered as b<strong>in</strong>d<strong>in</strong>g upon the bidder. If<br />

the bidder does not accept the corrected amount of bid, his bid will be rejected<br />

and the bid security will be forfeited.<br />

21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES: -<br />

Should there be any necessity of conversion to a s<strong>in</strong>gle currency i.e. Indian<br />

Rupees for the purpose of evaluation and comparison of offers, the Purchaser<br />

will convert the foreign currency content of each tender received <strong>in</strong>to Rupees<br />

at the sell<strong>in</strong>g exchange rate for each currency established by the Reserve Bank<br />

of India or any other Commercial Bank <strong>in</strong> the Purchaser's country, for similar<br />

transactions on the earlier of the follow<strong>in</strong>g date, namely, on the day twenty<br />

eight days before the latest date of tender open<strong>in</strong>g.<br />

39


22. SYSTEM PERFORMANCE GUARANTEE:<br />

22.1 S<strong>in</strong>ce the design of the system to achieve the end objective shall be checked<br />

and confirmed by the contractor and the supply of the materials will be<br />

accord<strong>in</strong>g to this system design, the tenderer shall give unqualified and<br />

unconditional guarantee that when the equipment supplied by him is <strong>in</strong>stalled<br />

and commissioned at site, it shall achieve the desired objective and that <strong>in</strong> the<br />

event of performance of the system when <strong>in</strong>stalled not comply<strong>in</strong>g with the<br />

end objective or with the specifications, he shall provide further <strong>in</strong>puts to<br />

enable the Railways to realise the end objectives with full compliance of the<br />

specifications conta<strong>in</strong>ed <strong>in</strong> these documents. No additional payment will be<br />

made to the contractor for supply of any additional goods and service<br />

required <strong>in</strong> this regard.<br />

22.2 This certificate <strong>in</strong> the pro-forma given <strong>in</strong> Form No.7, shall accompany the<br />

offer. Absence of this certificate which will form part of the agreement shall<br />

disqualify the tenderer automatically.<br />

23. AUTHORITY FOR ACCEPTANCE:<br />

The authority for the acceptance of the tender will rest with the Purchaser.<br />

The purchaser shall not be bound to accept the lowest or any tender or to<br />

assign any reason for non-acceptance or rejection of a tender. The purchaser<br />

reserves the right to accept any tender <strong>in</strong> respect of the whole or any portion<br />

of the work specified <strong>in</strong> the tender paper or to sub-divide the work among<br />

different Tenderers or to reduce the work or to accept any tender for less<br />

than the tendered quantities without assign<strong>in</strong>g any reason whatsoever.<br />

24. PURCHASE PREFERENCE:<br />

10% Purchase preference as applicable of lowest valid bid price, other th<strong>in</strong>gs<br />

be<strong>in</strong>g equal for product & services will be admissible for Central Public<br />

Sector Under tak<strong>in</strong>g <strong>in</strong> this tender subject to satisfaction of all other Terms &<br />

Conditions.<br />

25. AGREEMENT:<br />

The successful tenderer/s shall be required to execute an agreement with the<br />

President of India act<strong>in</strong>g through the Chief Adm<strong>in</strong>istrative Officer, IRPMU,<br />

Shivaji Bridge (IRCOT Complex) New Delhi 110001 or his accredited officer<br />

for carry<strong>in</strong>g out the work accord<strong>in</strong>g to the tender documents as <strong>in</strong>dicated <strong>in</strong><br />

para 2 of Special Conditions of Contract.<br />

26. TENDERER'S ADDRESS:<br />

Tenderer shall state <strong>in</strong> the tender his postal address fully and clearly. Any<br />

communication sent to the tenderers by post at his said address, shall be<br />

40


deemed to have reached the tenderer duly & timely, notwithstand<strong>in</strong>g the fact<br />

that the communication could not reach the tenderer at all or <strong>in</strong> time for<br />

whatever reason. Important documents shall be sent by Registered post.<br />

27. FOREIGN EXCHANGE:<br />

No foreign exchange and/or import license will be released /provided to the<br />

contractor <strong>in</strong> connection with this contract.<br />

*****<br />

41


Section – II<br />

Chapter – 2<br />

SPECIAL<br />

CONDITIONS OF<br />

CONTRACT<br />

42


Section – II<br />

Chapter – 2<br />

SPECIAL CONDITIONS OF CONTRACT<br />

INDEX<br />

1. TENDER DOCUMENTS:<br />

2. AGREEMENT:<br />

3. CONTRACT PERFORMANCE GUARANTEE and SECURITY DEPOSIT<br />

4. CONTRACTOR'S OFFICE & STORES DEPOT<br />

5. USE OF RAILWAY LAND:<br />

6. PROGRAMME OF WORK:<br />

7. COMPETENT SUPERVISORS:<br />

8. SPECIFIED RAILWAY STORES:<br />

9. OTHER RAILWAY STORES:<br />

10. TESTING & MEASURING INSTRUMENTS, SPECIAL TOOLS AND<br />

INSTALLATION MATERIAL<br />

11. STORES TO BE SUPPLIED BY CONTRACTOR:<br />

12. SUPPLY OF TECHNICAL LITERATURES, DOCUMENTATION,<br />

DRAWINGS & COMPLETION PLANS ETC.<br />

13. SPARES:<br />

14. LONG TERM AVAILABILITY OF SPARES AND SYSTEM SUPPORT:<br />

15. QUALITY ASSURANCE:<br />

16. EQUIPMENT EVALUATION AND APPROVAL<br />

17. INSPECTION OF MATERIALS<br />

18. INSPECTION OF WORKS<br />

19. QUANTUM OF WORK AND VARIATION IN QUANTITIES<br />

43


20. RIGHT OF RAILWAY TO KEEP BACK FROM THE CONTRACT ANY<br />

PORTION OF WORK:<br />

21. SUBLETTING AND ASSIGNMENT<br />

22. EXECUTION OF WORK<br />

23. PROGRESS REPORTING<br />

24. MAINTENANCE OF WORKS<br />

25 CLEARANCE OF SITE<br />

26. PROVISIONAL ACCEPTANCE<br />

27. PLACING IN SERVICE & MAINTENANCE SUPERVISION<br />

28 FINAL ACCEPTANCE<br />

29. WARRANTY<br />

30. TRAINING<br />

31. INFRINGEMENT OF PATENTS<br />

32. LICENSE AS PER GOVT. OF INDIA CONTRACT LABOUR ACT<br />

33. DEFAULT & DELAYS<br />

34. LOSS SUSTAINED DUE TO DEFAULT AND DELAY<br />

35. PENALTY FOR DELAY IN COMPLETION<br />

36. EXTENSION OF TIME<br />

37. CONTRATOR'S LIABILITIES FOR COSTS AND DAMAGES<br />

38. UNIT PRICES<br />

39. MEASUREMENT OF WORKS:<br />

40. TERMS OF PAYMENT<br />

41. FINAL PAYMENT<br />

42. FINAL SETTLEMEN<br />

43. CERTIFICATE FOR MODVAT BENEFITS ON BILLS:<br />

44


44. DEDUCTION FROM ON ACCOUNT PAYMENT BILLS<br />

45. TAXES<br />

46. MOBILIZATION ADVANCE (Not applicable <strong>in</strong> Present tender)<br />

47. INSURANCE:<br />

48. FORCE MAJEURE CLAUSE:<br />

49. SETTLEMENT OF DISPUTE AND ARBITRATION:<br />

50. DEMAND FOR ARBITRATION:<br />

*****<br />

45


SPECIAL CONDITIONS OF CONTRACT<br />

1. TENDER DOCUMENTS:<br />

1.1 The goods and services required, bidd<strong>in</strong>g procedure and contract terms are<br />

prescribed <strong>in</strong> the tender documents. Bid documents can be obta<strong>in</strong>ed from the<br />

office of the Chief Adm<strong>in</strong>istrative Officer / IRPMU, (IRCOT complex) Shivaji<br />

Bridge, New Delhi-110001, after deposit<strong>in</strong>g Rs.10000.00 only <strong>in</strong> the form of bank<br />

draft made <strong>in</strong> favour of Dy. FA&CAO, IRPMU, Shivaji Bridge, New Delhi-<br />

110001 on any work<strong>in</strong>g day Between 1030 hrs to 1500 hrs from 22/02/08 to<br />

24/3/08 or the corrigendum thereof. The attention of tenderer is <strong>in</strong>vited to the<br />

follow<strong>in</strong>g documents:<br />

Section-I:<br />

Preamble along with Schedule of Requirement.<br />

Section-II: I) Instructions to tenderers and conditions of tender<strong>in</strong>g.<br />

II) Special Conditions of Contract.<br />

III) Tender Forms and Annexure etc.<br />

Section-III:<br />

Technical Supplement along with technical Instructions, specifications and<br />

Draw<strong>in</strong>gs etc. for the scope of the work <strong>in</strong>cluded <strong>in</strong> this tender.<br />

Miscellaneous:<br />

I) General Conditions of contract (G.C.C.) as amended by advance<br />

correction slips issued up to date.<br />

II) IRS conditions of contract for the stores department with up to date<br />

modification (CCSS).<br />

General Conditions of Contract (G.C.C.) as amended by advance correction slips<br />

issued up to-date and IRS conditions of contract for the stores department with up<br />

to date modification (CCSS) can be obta<strong>in</strong>ed, if need be, from the office of the<br />

CAO/IRPMU after pay<strong>in</strong>g the cost prescribed for it <strong>in</strong> the form of Bank Draft <strong>in</strong><br />

favour of Dy FA&CAO/IRPMU, Shivaji Bridge, New Delhi.<br />

1.2 If the Tender submitted by a tenderer is accepted and the contract awarded to the<br />

Tenderer, the various works com<strong>in</strong>g under purview of the contract shall be<br />

<strong>gov</strong>erned by tender documents mentioned above. Where there is any conflict<br />

between the <strong>in</strong>structions to tenderers and conditions of tender<strong>in</strong>g and special<br />

conditions of contract, Tender forms, annexure etc. on one hand and General<br />

Conditions of Contract on the other, the former shall prevail.<br />

46


1.3 Any Special conditions stated by the Tenderer <strong>in</strong> the cover<strong>in</strong>g letter submitted<br />

along with the tender shall be deemed to be a part of the Contract to such extent<br />

only, as have been explicitly accepted by the Railway.<br />

1.4 The expression General conditions of contract (GCC), wherever occurr<strong>in</strong>g <strong>in</strong> these<br />

papers shall be deemed to mean the General conditions of contract, 1969 of<br />

Northern Railway department as amended by advance correction slips issued upto-date.<br />

2. AGREEMENT:<br />

The successful Tenderer shall with<strong>in</strong> 15 days after hav<strong>in</strong>g been called upon by<br />

notice to do so be bound to execute an agreement based on accepted rates and<br />

conditions, <strong>in</strong> such form as the Railways may prescribe, and lodge the same with<br />

the Railway together with the conditions of contract, specifications and<br />

Schedule of prices referred to there<strong>in</strong> duly completed. The form for agreement is<br />

<strong>in</strong>cluded <strong>in</strong> Section II, Chapter-III, and (Form No.3).<br />

3. CONTRACT PERFORMANCE GUARANTEE and SECURITY DEPOSIT<br />

3.1 SECURITY DEPOSIT:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

Security deposit shall be 5% of the contract value<br />

The rate of recovery shall be @10% of the bill amount till the full security<br />

deposit is recovered.<br />

Security deposit will be recovered only from the runn<strong>in</strong>g bill of the<br />

contract and no other mode of collect<strong>in</strong>g SD as <strong>in</strong> the form of <strong>in</strong>struments<br />

like BG, FD etc shall be accepted towards Security Deposit.<br />

No <strong>in</strong>terest will be payable upon the Security Deposit or amounts<br />

payable to the contractor under this contract.<br />

Security Deposit will be returned to the contractor after six months of<br />

physical completion of work as certified by competent authority and<br />

settlement of all dues and disputes. The competent shall normally be<br />

the authority, who is competent to sign the contract. If this competent<br />

authority is of the rank lower than the JA grade, then a JA grade officer<br />

(concerned with the work) should issue the certificate. The certificate<br />

<strong>in</strong>ter alia should mention that the work has been completed <strong>in</strong> all<br />

respects & that all the contractual obligations have been fulfilled by the<br />

contractors and that there is no due from the contractor to Railways<br />

aga<strong>in</strong>st the contract concerned. Before releas<strong>in</strong>g the Security Deposit,<br />

contractor concerned should submit an unconditional & unequivocal no<br />

claim certificate.<br />

3.1.1 PERFORMANCE GUARANTEE<br />

47


The procedure for obta<strong>in</strong><strong>in</strong>g Performance Guarantee is outl<strong>in</strong>ed below:-<br />

(a).<br />

(b).<br />

The successful bidder shall submit a Performance Guarantee (PG) <strong>in</strong><br />

the form of an irrevocable bank guarantee amount<strong>in</strong>g to 5% of the<br />

contract value.<br />

A Performance Guarantee shall be submitted by the successful bidder<br />

after the letter of acceptance has been issued, but before sign<strong>in</strong>g of the<br />

agreement. The agreement should normally be signed with<strong>in</strong> 15 days<br />

after the issue of LOA and Performance Guarantee shall also be<br />

submitted with<strong>in</strong> this time limit. This guarantee shall be <strong>in</strong>itially valid up to<br />

the stipulated date of completion plus 60 days beyond that. In case, the<br />

time for completion of work gets extended, the contractor shall get the<br />

validity of Performance Guarantee extended to cover such extended time<br />

for completion of work plus 60 days.<br />

(c ). The Performance Guarantee (PG) shall be released after the physical<br />

completion of the work based on the “Completion Certificate” issued by<br />

the competent authority stat<strong>in</strong>g that the contractor has completed the<br />

work <strong>in</strong> all respects satisfactorily . The security deposit, however, shall be<br />

released only after the expiry of the ma<strong>in</strong>tenance period and after pass<strong>in</strong>g<br />

the f<strong>in</strong>al bill based on “NO Claim Certificate.<br />

(d).<br />

(e).<br />

wherever the contracts is resc<strong>in</strong>ded, the security deposit shall be forfeited<br />

and Performance Guarantee shall be encashed and the balance work<br />

shall be got done <strong>in</strong>dependently without risk and cost of the failed<br />

contractor. The failed contractor shall be debarred from participat<strong>in</strong>g <strong>in</strong><br />

the tender for execut<strong>in</strong>g the balance work. If the failed contractor is a JV<br />

or a partnership firm, then every member/partner of such a firm shall be<br />

debarred from participat<strong>in</strong>g <strong>in</strong> the tender for the balance work either <strong>in</strong><br />

his/her <strong>in</strong>dividual capacity or as a partner of any other JV/partnership firm.<br />

The Eng<strong>in</strong>eer shall not make a claim under the Performance Guarantee<br />

except for amounts to which the President of India is entitled under the<br />

contract (not withstand<strong>in</strong>g and /or without prejudice to any other<br />

provisions <strong>in</strong> the contract agreement) <strong>in</strong> the event of:<br />

1. Failure by the contractor to extend the validity of the Performance<br />

Guarantee as described here<strong>in</strong> above, <strong>in</strong> which event the<br />

Eng<strong>in</strong>eer may claim the full amount of the Performance<br />

Guarantee.<br />

2. Failure by contractor to pay President of India any amount due,<br />

either as agreed by the contractor or determ<strong>in</strong>ed under any of the<br />

Clauses/Conditions of the agreement, with<strong>in</strong> 30 days of the<br />

service of notice to this effect by Eng<strong>in</strong>eer.<br />

3. The contract be<strong>in</strong>g determ<strong>in</strong>ed or resc<strong>in</strong>ded under provision of the<br />

GCC the Performance Guarantee shall be forfeited <strong>in</strong> full and shall<br />

be absolutely at the disposal of the President of India.<br />

4. CONTRACTOR'S OFFICE & STORES DEPOT<br />

48


The Contractor shall, with<strong>in</strong> a month of issue of letter of acceptance of tender,<br />

establish an office and store depot at a convenient place for receiv<strong>in</strong>g and stor<strong>in</strong>g<br />

equipments and materials and progress<strong>in</strong>g field work expeditiously <strong>in</strong><br />

consultation and with the approval of the purchaser. He shall <strong>in</strong>timate the<br />

purchaser and address there of to which all correspondence should be sent. Any<br />

communication sent to the contractor by post at his said address shall be deemed<br />

to have reached the contractor duly and <strong>in</strong> time. Important documents shall be<br />

sent by Registered post.<br />

5. USE OF RAILWAY LAND:<br />

Use of Railway land required by the Contractor for constructions of temporary<br />

offices, quarter(s), hutments etc. for the staff and for stor<strong>in</strong>g materials etc., will be<br />

permitted to him/them free by Railway, if available. The location of these offices,<br />

hutments, stores etc. will be subject to the approval of the Eng<strong>in</strong>eer or his<br />

representative. The land will be restored to Railways by the Contractor(s) <strong>in</strong> the<br />

same condition as when taken over or <strong>in</strong> vacant condition as desired by the<br />

Eng<strong>in</strong>eer, after completion of the work or at any earlier day, as specified by the<br />

Eng<strong>in</strong>eer. The failure to do so will make the Contractor(s) liable to pay the cost<br />

<strong>in</strong>curred by the Railway for gett<strong>in</strong>g possession of land.<br />

6. PROGRAMME OF WORK:<br />

6.1 The Contractor shall have necessary resources to execute the work so that the<br />

entire work is completed with<strong>in</strong> a period as mentioned <strong>in</strong> the preamble from<br />

the date of issue of Letter of Acceptance of the tender. He shall also have<br />

necessary resources to take up the work of <strong>in</strong>stallation commission<strong>in</strong>g etc.<br />

simultaneously at different sites.<br />

6.2 With<strong>in</strong> a period of 30 days beg<strong>in</strong>n<strong>in</strong>g from the date of issue of Letter of<br />

Acceptance of Tender, the Contractor shall submit the detailed time Schedule for<br />

the execution of work based on the conditions <strong>in</strong> consultation with the Railway<br />

to the authority mentioned <strong>in</strong> the Preamble and approved by the latter <strong>in</strong> writ<strong>in</strong>g<br />

before commencement of the work.<br />

6.3 The Contractor shall be held responsible for the execution of the work accord<strong>in</strong>g<br />

to the Programme given above for the execution of the work and also the various<br />

clauses of the technical supplement, Technical specifications, <strong>in</strong>structions and<br />

draw<strong>in</strong>gs available separately. Failure to comply with any of these will be dealt<br />

with as per provision laid down <strong>in</strong> General Conditions of Contract.<br />

6.4 The Contractor on his part will have to employ supervisors, technicians and<br />

labour <strong>in</strong> full strength commensurate with work<strong>in</strong>g area available. He will also<br />

arrange match<strong>in</strong>g materials and equipment to complete the job most<br />

expeditiously so as to ensure that the work is completed <strong>in</strong> phases with<strong>in</strong> the<br />

stipulated period.<br />

49


6.5 Inspection Register shall be ma<strong>in</strong>ta<strong>in</strong>ed at the site of work by the Railway<br />

where<strong>in</strong> <strong>in</strong>structions regard<strong>in</strong>g the work<strong>in</strong>g etc. shall be recorded by the<br />

Eng<strong>in</strong>eer or his executive subord<strong>in</strong>ates. It is expected of the Contractor or his<br />

representative at the site to note such <strong>in</strong>structions whenever asked upon to do so<br />

and take action accord<strong>in</strong>gly.<br />

6.6 No facility whatsoever, e.g. provisions of approach road and provision of<br />

temporary level cross<strong>in</strong>g etc. will be provided by Railway for cart<strong>in</strong>g materials.<br />

Approach roads with<strong>in</strong> the Railway limits can be used for cart<strong>in</strong>g materials.<br />

6.7 The contractor will programme his work <strong>in</strong> such a manner so as not to <strong>in</strong>terfere <strong>in</strong><br />

the work<strong>in</strong>g and movement of tra<strong>in</strong>s. No extra payment shall be allowed on this<br />

account and for tak<strong>in</strong>g any precautions or wastage of contractor's labour, time etc.<br />

due to tra<strong>in</strong> work<strong>in</strong>g.<br />

7 COMPETENT SUPERVISORS:<br />

7.1 The Contractor shall place and keep competent Representatives /<br />

Supervisors / Eng<strong>in</strong>eers, as his representative at the work sites who will be<br />

authorised to receive and acknowledge materials issued by the Railway and<br />

take all orders issued by the Railway. The said representatives shall be present<br />

at site dur<strong>in</strong>g work<strong>in</strong>g hours and any written orders or <strong>in</strong>structions which the<br />

purchaser's Eng<strong>in</strong>eer may give to the said representatives of the contractor shall<br />

be deemed to have been duly given or communicated to the contractor.<br />

7.2 The contractor or his representative will accompany the Purchaser's Eng<strong>in</strong>eer or<br />

Eng<strong>in</strong>eer on <strong>in</strong>spection or proceed to their offices whenever called upon to do<br />

so.<br />

8. SPECIFIED RAILWAY STORES:<br />

8.1 The contractor shall furnish a stand<strong>in</strong>g <strong>in</strong>demnity bond for the materials and<br />

equipments supplied to him by Railways <strong>in</strong> form No.6. (Chapter 3, Section II).<br />

8.2 The Contractor shall transport material supplied by Railways to the site of work<br />

as required and no cart<strong>in</strong>g charges shall be payable by Railways.<br />

8.3 RECONCILIATION OF MATERIALS SUPPLIED BY RAILWAYS:<br />

All the materials supplied by the Purchaser shall be correctly accounted for<br />

and the quantities reconciled on completion of the work by the contractor. On<br />

completion of the work all surplus materials supplied by the Purchaser together<br />

with the ones found defective or that have became defective or broken on<br />

account of defective materials and/or workmanship shall be returned to him by the<br />

contractor.<br />

If the contractor fails to return excess and unused materials supplied by the<br />

railway or if there are any shortages dur<strong>in</strong>g f<strong>in</strong>al reconciliation, their cost there<br />

50


of shall be recovered by the Purchaser from the Contractor at the books rate plus<br />

railway freight, handl<strong>in</strong>g, load<strong>in</strong>g, supervision and other <strong>in</strong>cidental charges at the<br />

rates fixed by the railway. To this will be added an <strong>in</strong>crease of 100%.<br />

8.5 CONSIGNEE:<br />

The contractor should consign, if need be, all the materials to 'self' to the nearest<br />

stations where materials can be booked for stack<strong>in</strong>g before erection. For such<br />

items, as admit part payment on receipt by the Railway, can be booked to store<br />

go-down of Sr Section Eng<strong>in</strong>eer/stores / Nangloi, where from the materials shall<br />

be handed over to the contractor for <strong>in</strong>stallation. However transportation<br />

charges to the site of work, taxes, octroi etc and all handl<strong>in</strong>g charges for each such<br />

item shall be borne by the contractor.<br />

8.6 Pack<strong>in</strong>g and forward<strong>in</strong>g<br />

The contractor shall pack at his own cost the stores sufficiently and properly for<br />

transit by rail/road, air and/or sea as provided <strong>in</strong> the contract so as to ensure their<br />

be<strong>in</strong>g free from loss or damage on arrival at their dest<strong>in</strong>ation.<br />

All conta<strong>in</strong>ers (<strong>in</strong>clud<strong>in</strong>g pack<strong>in</strong>g cases, boxes, t<strong>in</strong>s, drums and wrapp<strong>in</strong>gs) <strong>in</strong><br />

which the stores are supplied by the contractor shall be considered as nonreturnable<br />

and their cost as deemed to have been <strong>in</strong>cluded <strong>in</strong> the contract price.<br />

Each bale or package shall conta<strong>in</strong> note specify<strong>in</strong>g the name and address of the<br />

Contractor the number and date of the acceptance of tender and the designation of<br />

the Controll<strong>in</strong>g officer<br />

Each bale or package delivered under the contract shall be marked by the<br />

Contractor at his own expense. Such mark<strong>in</strong>g shall be dist<strong>in</strong>ct (all previous<br />

irrelevant mark<strong>in</strong>g be<strong>in</strong>g carefully obliterated) and shall clearly <strong>in</strong>dicate the<br />

description and quantity of the stores, the name and address of the consignee, the<br />

gross weight of the package and the name of the contractor with a dist<strong>in</strong>ctive<br />

number of mark sufficient for the purpose of identification. All mark<strong>in</strong>gs shall be<br />

carried out with such material as may be found satisfactory by the <strong>in</strong>spect<strong>in</strong>g<br />

officer as regard quickness of dry<strong>in</strong>g, fastness and <strong>in</strong>delibility. Materials and<br />

Equipment meant for each station shall be packed <strong>in</strong> separate boxes and marked<br />

with the name of station, consignee and railway.<br />

The <strong>in</strong>spect<strong>in</strong>g officer may reject the stores if the stores are not packed and/or<br />

marked as aforesaid and <strong>in</strong> case where the pack<strong>in</strong>g materials are separately<br />

prescribed, if such materials are not <strong>in</strong> accordance with the terms of the contract.<br />

Such rejection of the stores by the Inspect<strong>in</strong>g Officer shall be b<strong>in</strong>d<strong>in</strong>g on the<br />

Contractor.<br />

8.7 Consignee’s right of rejection:<br />

Notwithstand<strong>in</strong>g any approval which the Inspect<strong>in</strong>g officer may have given <strong>in</strong><br />

respect of any materials or other particulars or the work or workmanship <strong>in</strong>volved<br />

51


<strong>in</strong> the performance of the contract (whether with or without any test carried out by<br />

the Contractor or the <strong>in</strong>spect<strong>in</strong>g officer or under the direction of the Inspect<strong>in</strong>g<br />

officer) and notwithstand<strong>in</strong>g delivery of the materials where so provided to the<br />

<strong>in</strong>terim consignee, it shall be lawful for the consignee, on behalf of the Railway,<br />

to reject the materials or any part, portion or consignment thereof with<strong>in</strong> a<br />

reasonable time after actual delivery thereof to him at the place or dest<strong>in</strong>ation<br />

specified <strong>in</strong> the contract if such materials or part, portion or consignment thereof<br />

is not <strong>in</strong> all respects <strong>in</strong> conformity with the terms and conditions of the contract<br />

whether on account of any loss, deterioration or damage before despatch or<br />

delivery or dur<strong>in</strong>g transit or otherwise howsoever.<br />

8.8 Security of materials:-<br />

Security of all materials <strong>in</strong> the section where the work is <strong>in</strong> progress shall be the<br />

contractor’s responsibility and he shall arrange to guard the same from theft. In<br />

the event of any loss the contractor shall be responsible to that effect and shall<br />

execute an <strong>in</strong>demnity bond for the materials that will rema<strong>in</strong> <strong>in</strong> his custody, which<br />

has been supplied by the Railway.<br />

9. OTHER RAILWAY STORES:<br />

9.1 If any material other than those specified <strong>in</strong> para 8 above is supplied by the<br />

Railways either at the Contractor's request or suo motto <strong>in</strong> order to prevent any<br />

possible delay <strong>in</strong> the execution of the works likely to occur due to the<br />

Contractor's <strong>in</strong>ability to make adequate arrangements for supply thereof or<br />

otherwise, recovery will be made from Contractor's bill at 1.5 times the cost of<br />

procurement which is <strong>in</strong>clusive of freight or rate given <strong>in</strong> schedule whichever is<br />

higher. Freight between the Railway sources of supply and Railway<br />

Stores/depot shall be to the Contractor's account.<br />

9.2 If however, the material required by the Contractor is not available <strong>in</strong> Railways<br />

stock or the Railways decide not to supply the same, be that for whatever<br />

reasons, the Railway will not be bound to arrange for the supply at the cost<br />

quoted above or at any other cost nor will this fact be accepted as an excuse for<br />

delay <strong>in</strong> execution of works.<br />

10. TESTING & MEASURING INSTRUMENTS, SPECIAL TOOLS AND<br />

INSTALLATION MATERIAL<br />

10.1 Special tools and <strong>in</strong>struments required for <strong>in</strong>stallation and ma<strong>in</strong>tenance of all the<br />

equipment shall be arranged by the tenderer <strong>in</strong> adequate quantities. All<br />

<strong>in</strong>stallation material for complete commission<strong>in</strong>g of the system shall be provided<br />

by the tenderer. Details of special tools, their quantities and unit prices shall be<br />

<strong>in</strong>dicated.<br />

10.2 All tests and measur<strong>in</strong>g <strong>in</strong>struments and other arrangements required for all the<br />

acceptance tests shall be provided by the contractor free of cost.<br />

52


11. STORES TO BE SUPPLIED BY CONTRACTOR:<br />

11.1 All materials required for the execution of the contract other than those<br />

specifically shown as be<strong>in</strong>g supplied by the Railways <strong>in</strong> this document shall be<br />

arranged and supplied by the contractor as detailed <strong>in</strong> the scope so as to realise<br />

the end objective. The materials supplied and used by the contractor shall be of<br />

best quality available.<br />

11.2. The approximate quantities of equipment and material to be supplied by<br />

contractor are <strong>in</strong>dicated <strong>in</strong> Schedule A & B of SoR. The supply of equipment and<br />

materials shall also <strong>in</strong>clude required <strong>in</strong>stallation and other materials and<br />

documents etc., which may not be specifically mentioned here<strong>in</strong>, but which are<br />

usually necessary for complet<strong>in</strong>g the work <strong>in</strong> all respects. The materials supplied<br />

and used by the contractor shall be of best quality available.<br />

12. SUPPLY OF TECHNICAL LITERATURES, DOCUMENTATION,<br />

DRAWINGS & COMPLETION PLANS ETC.<br />

12.1 The supply of equipment and materials shall <strong>in</strong>clude supply of two sets of pr<strong>in</strong>ted<br />

documents from the orig<strong>in</strong>al equipment manufacturers with each equipment. The<br />

documents should <strong>in</strong>clude:-<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

All software documentation required for the equipment / system design.<br />

Design approach of the system.<br />

Functions achieved <strong>in</strong> hardware and software.<br />

Mode of <strong>in</strong>teraction between hardware and software<br />

The follow<strong>in</strong>g certifications from the approved validation agency (<strong>in</strong>dependent<br />

safety auditor).<br />

Correctness and safety of the software<br />

Expected MTBF and availability of the system<br />

Name of manufacturer, place of manufacture and <strong>in</strong>spection. A list of spare parts<br />

as recommended by the manufacturer shall be enclosed.<br />

A list of Test equipment and other special tools as required for data <strong>in</strong>put,<br />

simulation test<strong>in</strong>g, <strong>in</strong>stallation and ma<strong>in</strong>tenance etc. of the system and a detailed<br />

write-up about the procedure to be adopted for use of the same.<br />

Quality assurance & software validation:<br />

The tenderer shall submit along with the tender the quality assurance control, and<br />

<strong>in</strong>spection plan <strong>in</strong>clud<strong>in</strong>g full details of <strong>in</strong>-house quality assurance organization,<br />

procedure and documentation. The tenderer shall submit along with this tender the<br />

details of software validation done by an Accredited Agency of International<br />

repute and standard. Further, all the details of test, certification and validation<br />

done to ensure full safety of the system for use at stations for operation of<br />

53


passenger tra<strong>in</strong> services, as per the Technical Specification, shall be submitted by<br />

the tenderer<br />

12.2 Except where pr<strong>in</strong>ted documents are supplied with each equipment by orig<strong>in</strong>al<br />

equipment manufacturer, all other documentation and <strong>in</strong>formation shall be<br />

prepared us<strong>in</strong>g CAD. All the documentation and draw<strong>in</strong>gs etc. shall be supplied <strong>in</strong><br />

two sets of CD’s. The draw<strong>in</strong>gs etc. shall also be supplied <strong>in</strong> duplicate on J.K.<br />

Copier/map litho white paper to facilitate tak<strong>in</strong>g out copies on pla<strong>in</strong> paper copier.<br />

In addition, four complete sets of such documents shall also be supplied for ready<br />

use duly bounded <strong>in</strong> good plastic folders.<br />

12.3 The supply of equipment and materials shall also <strong>in</strong>clude necessary<br />

documentation related to tra<strong>in</strong><strong>in</strong>g on the ma<strong>in</strong>tenance of equipment <strong>in</strong> sufficient<br />

number of copies and two video-CDs<br />

13. SPARES:<br />

13.1 The tenderer shall <strong>in</strong>clude <strong>in</strong> his tender the details of essential spares, their<br />

quantity and unit prices as per schedule of requirements. Details are to be given to<br />

confirm that quantity of spares quoted is as per requirement of this clause. The<br />

tenderer shall give a detailed list of circuit packs, modules, panels, plug <strong>in</strong> units,<br />

crystals, couplers, connectors, fuses of each type which may be lowest level field<br />

replaceable units for each location. The total cost of essential spares based on the<br />

unit price quoted by the tenderer shall be <strong>in</strong>cluded <strong>in</strong> the tender evaluation.<br />

13.2 Railway shall consider the follow<strong>in</strong>g essential spares at 5% of the quantities used<br />

<strong>in</strong> the equipment subject to a m<strong>in</strong>imum of one. The fraction shall be rounded off<br />

on higher side.<br />

a) All units which may <strong>in</strong>clude but not limited to circuit packs, modules, plug <strong>in</strong><br />

units, ancillary equipment connectors, couplers of each type, which may be lowest<br />

level field replaceable assembly/device.<br />

b) Surge and lightn<strong>in</strong>g protection arrangement.<br />

c) Power supply equipment.<br />

d) Connectors and couplers of each type with cables, crystals, MCBs switches.<br />

In addition follow<strong>in</strong>g are to be supplied as spares :<br />

i) Software back up <strong>in</strong> two sets of CD’s.<br />

ii)<br />

Three times the quantity of fuses used <strong>in</strong> the equipment for each type.<br />

Spares which are considered essential by the Railways but not quoted by the<br />

tenderer shall be assumed by the Railways, based on the highest price quoted by<br />

any other tenderer for the similar spares only for the purpose of evaluation. The<br />

54


spares for which no rates are available <strong>in</strong> the tender offer shall be required to be<br />

supplied free of cost.<br />

Optional Spares:<br />

In addition to the essential spares, tenderer shall <strong>in</strong>dicate additional<br />

recommended quantities of spares for efficient ma<strong>in</strong>tenance of the equipment<br />

and the systems which is considered necessary by the tenderer for a period of 8<br />

years after warranty period of one year. The details, unit price and the total cost of<br />

recommended spares shall be <strong>in</strong>cluded <strong>in</strong> the tender as an option. However, the<br />

cost of such recommended spares shall not be considered for tender evaluation.<br />

14. LONG TERM AVAILABILITY OF SPARES AND SYSTEM SUPPORT:<br />

14.1 The tenderer shall undertake to supply on payment all ma<strong>in</strong>tenance spares<br />

and tools required for the equipment dur<strong>in</strong>g life time. He shall also undertake<br />

to supply additional equipment required for replacement or expansion of the<br />

network, that may become necessary due to additional traffic requirements. The<br />

price variation formula adopted <strong>in</strong> pric<strong>in</strong>g such ma<strong>in</strong>tenance spares and additional<br />

supply that may be ordered <strong>in</strong> future shall be provided by mutual discussions.<br />

14.2 The manufacturer shall guarantee that spare parts for the system shall be<br />

available for a m<strong>in</strong>imum of eight years after expiry of the warranty period and<br />

thereafter at least two years notice shall be given to the Railways before any<br />

equipment or components are discont<strong>in</strong>ued or phased out from the<br />

manufactur<strong>in</strong>g plans. This will enable the Railways to assess the life time<br />

requirement of spares needed and order <strong>in</strong> sufficient quantity prior to stoppage<br />

of the manufacture.<br />

14.3 That the successful tenderer shall further guarantee that if he goes out of<br />

production of spare parts he shall supply the specifications of materials at no<br />

cost to the purchaser, if and when required <strong>in</strong> connection with the equipment to<br />

enable the purchaser to fabricate or procure from other sources.<br />

14.4 The supplier shall recommend and provide, prior to the system acceptance,<br />

calibration procedures. The recommendation shall <strong>in</strong>clude a list of the various<br />

calibration <strong>in</strong>struments, recalibration periods and extent of preventive<br />

ma<strong>in</strong>tenance for each test <strong>in</strong>strument.<br />

15. QUALITY ASSURANCE:<br />

15.1 The tenderer shall submit along with the tender the quality control plan <strong>in</strong>clud<strong>in</strong>g<br />

full details of <strong>in</strong>-house quality assurance organisation, procedures and<br />

documentation. Dur<strong>in</strong>g the manufactur<strong>in</strong>g process, proper record shall be<br />

ma<strong>in</strong>ta<strong>in</strong>ed for the <strong>in</strong>spection and test carried out accord<strong>in</strong>g to this plan.<br />

15.2 In the event of Railways waiv<strong>in</strong>g off the <strong>in</strong>spection, all tests provided <strong>in</strong> the test<br />

schedules approved by Railways shall be carried out by the quality assurance<br />

55


organisation and proper record of all such tests and results thereof shall be<br />

ma<strong>in</strong>ta<strong>in</strong>ed and supplied to Railways on demand.<br />

16. EQUIPMENT EVALUATION AND APPROVAL:<br />

16.1 The equipment shall be supplied by the contractor after the prototype is approved<br />

by the <strong>in</strong>spect<strong>in</strong>g agency.<br />

16.2 The procedure proposed to be adopted for the prototype approval of the<br />

equipment shall be as under:-<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

The test procedure shall be based on the system design. The methodologies to be<br />

adopted for various tests shall be decided tak<strong>in</strong>g <strong>in</strong>to account the system<br />

design/configuration and shall be approved by IR.<br />

Manufacturer shall carry out acceptance tests on equipment to be <strong>in</strong>stalled for<br />

functional acceptance test. These will be subjected to rout<strong>in</strong>e tests and<br />

environmental tests as laid down <strong>in</strong> the Technical Specifications of the Tender<br />

Document. These will be shipped to the consignee only after the <strong>in</strong>spect<strong>in</strong>g<br />

official issues a clear and unequivocal <strong>in</strong>spection certificate.<br />

Functional Acceptance Tests: The Functional Acceptance Tests shall sequence<br />

through all required operations to prove that the System performs <strong>in</strong> accordance<br />

with the Specification and that the local configuration data is acceptable.<br />

After completion of the survey and functional acceptance test, clearance will be<br />

given by the Railway to the Contractor for undertak<strong>in</strong>g manufacture of the total<br />

quantity of equipment to be supplied under this tender.<br />

Rout<strong>in</strong>e Test: The manufacture shall carryout the rout<strong>in</strong>e tests as per Technical<br />

specifications of the tender document on each equipment and the tests results shall<br />

be submitted to the <strong>in</strong>spection authority before call<strong>in</strong>g him for the acceptance<br />

tests.<br />

Acceptance Test: The <strong>in</strong>spect<strong>in</strong>g official shall undertake the Acceptance test on<br />

all the equipments as per technical specification of tender document at the<br />

manufacturer's premises. The material will be shipped only after an issue of<br />

'Inspection Certificate' by the <strong>in</strong>spect<strong>in</strong>g official.<br />

(vii) The Inspect<strong>in</strong>g Officer shall be nom<strong>in</strong>ated by the CAO/IRPMU. Notice /<br />

Intimation shall be sent <strong>in</strong> writ<strong>in</strong>g at least One month <strong>in</strong> advance by the<br />

Contractor to the Inspect<strong>in</strong>g officer when the stores or material to be supplied are<br />

ready for <strong>in</strong>spection and test and no materials shall be delivered or dispatched<br />

until the Inspect<strong>in</strong>g Officer has certified <strong>in</strong> writ<strong>in</strong>g that such stores have been<br />

<strong>in</strong>spected and approved for dispatch.<br />

(viii) Test Procedure: The contractor shall submit detailed Test Procedure for each<br />

equipment, sub-system and system as a whole to the Railway. The Railway shall<br />

56


discuss with the contractor and modify the same as may be required to ensure that<br />

the requirements of Tender Specifications are complied. The f<strong>in</strong>alised Acceptance<br />

Test Procedure/Schedule shall, only, act as broad guidel<strong>in</strong>e and Railway shall be<br />

free to carry out any other test that may be considered essential. The Test<br />

Procedure shall give details of all equipment, test and measur<strong>in</strong>g <strong>in</strong>struments<br />

required to perform the test.<br />

(ix)<br />

(x)<br />

(xi)<br />

Facilities for Test and Exam<strong>in</strong>ation: The contractor shall, at his own cost afford<br />

to the <strong>in</strong>spect<strong>in</strong>g officer all reasonable facilities <strong>in</strong>clud<strong>in</strong>g Office/Lab<br />

accommodation as may be necessary for satisfy<strong>in</strong>g himself, that the materials are<br />

be<strong>in</strong>g and/or have been manufactured <strong>in</strong> accordance with the Specification and<br />

conditions laid down. Contractor shall provide the facilities of <strong>in</strong>spection and<br />

test<strong>in</strong>g at the f<strong>in</strong>al stage of production, assembly and test<strong>in</strong>g <strong>in</strong> the<br />

manufacturer's/supplier's premises.<br />

Cost of Test: The Contractor shall provide, at his cost, all materials, tools, labour<br />

and assistance of every k<strong>in</strong>d, which the Inspect<strong>in</strong>g officer may demand of him for<br />

any test and exam<strong>in</strong>ation, which he shall require to be made on the Contractor's<br />

premises. If the Contractor fails to meet with the conditions aforesaid, the<br />

<strong>in</strong>spect<strong>in</strong>g officer shall, <strong>in</strong> his sole judgement, be entitled to remove for test and<br />

exam<strong>in</strong>ation, all or any of the stores manufactured by the Contractor to any<br />

premises other than that of the Contractor, and <strong>in</strong> all such cases the Contractor<br />

shall bear the cost of transport and/or carry<strong>in</strong>g out such test elsewhere. A<br />

certificate <strong>in</strong> writ<strong>in</strong>g by the Inspect<strong>in</strong>g officer that the Contractor has failed to<br />

provide the facilities and the means for test exam<strong>in</strong>ation shall be f<strong>in</strong>al. The<br />

contractor shall not be entitled to object on any ground whatsoever to the method<br />

of test<strong>in</strong>g adopted by the Inspect<strong>in</strong>g officer.<br />

Delivery of Materials for Test: The Contractor shall also provide and deliver for<br />

test, at his cost, at such place other than his premises as the Inspect<strong>in</strong>g officer may<br />

specify such material or stores, he may require. The premises for test<strong>in</strong>g other<br />

than manufacturer's premises shall be mutually decided by Railway and the<br />

Contractor.<br />

17. INSPECTION OF MATERIALS:<br />

17.1 All equipment, materials, fitt<strong>in</strong>gs and components will be subject to <strong>in</strong>spection by<br />

the purchaser or his representative at the manufacturer's premises before dispatch<br />

and no materials shall be dispatched from the manufacturer's premises until these<br />

are <strong>in</strong>spected and /or approved. The materials may also be <strong>in</strong>spected by the<br />

purchaser or his representative at the contractor's depot at the purchaser’s<br />

discretion. The purchaser or his representative shall have the right to be present<br />

dur<strong>in</strong>g all stages of manufacture, and shall be afforded, free of charge all<br />

reasonable facilities for <strong>in</strong>spection and test<strong>in</strong>g so as to satisfy himself that the<br />

materials are <strong>in</strong> accordance with specifications, approved draw<strong>in</strong>g and<br />

designs.<br />

57


17.2 Materials to IRS/RDSO design or specification and ITD/TEC specification shall<br />

be <strong>in</strong>spected by RDSO before they are f<strong>in</strong>ally used <strong>in</strong> works. Materials other than<br />

this should be <strong>in</strong>spected by purchaser Eng<strong>in</strong>eer or his representative at<br />

factory/site.<br />

17.3 All materials that are not covered under the specification, designs and draw<strong>in</strong>gs of<br />

RDSO/TEC etc. shall be procured from the reputed manufacturers or their<br />

authorised dealers. Such materials are to be approved by the purchaser’s<br />

Eng<strong>in</strong>eer. The Contractor may be required to produce test certificate from the<br />

manufacturer wherever called for by the Eng<strong>in</strong>eer.<br />

17.4 Dur<strong>in</strong>g the execution of the contract, samples may be taken from all the<br />

materials employed for the purpose of test and/or analysis under the conditions<br />

laid down <strong>in</strong> specification; such samples to be prepared for test<strong>in</strong>g and<br />

forwarded to the test<strong>in</strong>g entity shall be free of all costs to the Railway.<br />

17.5 The decision of the purchaser or his successor shall be f<strong>in</strong>al <strong>in</strong> respect of<br />

acceptability or otherwise of any material, equipment etc. required for the work.<br />

17.6 The cost of <strong>in</strong>spection of equipment and materials, all tests and/or analysis<br />

performed shall be borne by the Contractor.<br />

17.7 All expenses of the purchasers representative shall be borne by the purchaser<br />

whether the <strong>in</strong>spected materials is utilised <strong>in</strong> the work or not.<br />

17.8 In case any material is found not accord<strong>in</strong>g to the standard specifications after<br />

delivery at site, the contractor shall immediately remove such materials with<strong>in</strong> 48<br />

hours from Railway premises at his own cost.<br />

18. INSPECTION OF WORKS:<br />

18.1 The Eng<strong>in</strong>eer or his representative may <strong>in</strong>spect and test the various portions of<br />

the work at all stages and shall have full power to reject all or any portion of<br />

the work that he may consider to be defective or <strong>in</strong>ferior <strong>in</strong> quality of<br />

materials workmanship of design <strong>in</strong> comparison to what is called for <strong>in</strong> the<br />

specification. In the event of rejection of any work already executed and not<br />

<strong>in</strong> accordance with specification as <strong>in</strong> this tender and/or as determ<strong>in</strong>ed by the<br />

Eng<strong>in</strong>eer or which the Contractor has been apprised, the Contractor shall<br />

carry out alterations/replacements to such works to the satisfaction of the<br />

Eng<strong>in</strong>eer for which no additional expenses will be Borne by the Railway.<br />

18.2 The contractor shall submit detailed test procedure for each equipment, subsystem<br />

and system as a whole to the Railways. The Railways shall discuss with<br />

the contractor and modify the test procedure as may be required to ensure that<br />

the requirement of tender specifications are complied. The f<strong>in</strong>alised test<br />

procedure shall, only, act as a broad guidel<strong>in</strong>e and Railway shall be free to carry<br />

out any other tests that may be considered essential. The test procedure shall<br />

58


give details of all equipment, test and measur<strong>in</strong>g <strong>in</strong>struments required to perform<br />

the tests which shall be provided by the contractor free of cost.<br />

19. QUANTUM OF WORK AND VARIATION IN QUANTITIES:<br />

19.1 The quantities of various items given <strong>in</strong> the schedules for the works to be<br />

executed are only approximate and are only for the guidance of the contractor. As<br />

far as possible, they have been assessed correctly but are likely to vary dur<strong>in</strong>g the<br />

execution of the work.<br />

19.2 For <strong>in</strong>crease upto 25% of the quantities <strong>in</strong>dicated <strong>in</strong> schedule, the contractor shall<br />

not be entitled for compensation and will be paid for such <strong>in</strong>crease <strong>in</strong> the<br />

quantities at the agreement rate.<br />

19.3 In the event of reduction <strong>in</strong> the quantities to be executed for any reason<br />

whatsoever, the contractor shall not be entitled for any compensation but shall be<br />

paid only for the actual quantity of work done, at the agreement rates.<br />

19.4 When the gross value of the work to be executed is likely to <strong>in</strong>crease <strong>in</strong> excess of<br />

25% of the orig<strong>in</strong>al value of the agreement, the contractor should notify the<br />

Eng<strong>in</strong>eer <strong>in</strong> –charge at least THIRTY DAYS before such necessity arises.<br />

19.5 When the operation of the quantities results <strong>in</strong> the agreement value exceed<strong>in</strong>g by<br />

25% to 50%, for the first 15% <strong>in</strong>crease, the payment will be reduced straightaway<br />

by 2% <strong>in</strong> the <strong>in</strong>cremental value of the agreement and for the next 10% <strong>in</strong>crease <strong>in</strong><br />

the value, the payment will be reduced straightaway by an additional reduction of<br />

2% <strong>in</strong> the further <strong>in</strong>cremental value of the agreement.<br />

19.6 Notwithstand<strong>in</strong>g the above adhoc reduction, Railway reserves the right to refix<br />

the rates, by mutual consent, of those items <strong>in</strong> the schedule, where the quantities<br />

have exceeded by 25% of the agreemental quantities.<br />

19.7 Execution of quantities beyond +50% of overall value shall not be generally<br />

permitted. The rate for quantities <strong>in</strong> excess of 50% of the items shall be decided<br />

between the Railway and the contractor <strong>in</strong> advance of execution of the quantities<br />

<strong>in</strong>volved if <strong>in</strong> the op<strong>in</strong>ion of the Railway, such quantities are also to be executed<br />

by the same contractor. In the event of mutually agreed rate not be<strong>in</strong>g arrived at,<br />

the Railway shall be entitled to execute the excess work by other means and the<br />

contractor shall have no claims on this account.<br />

19.8 An undertak<strong>in</strong>g shall be given to the effect that additional quantities up to 25% of<br />

the contract value at the same unit rates shall be supplied by the tenderer <strong>in</strong> case<br />

order for the additional quantity is placed with<strong>in</strong> the currency period of contract.<br />

It should be noted that this excludes additional quantities that may be required as<br />

warranty or replacement due to defective design and manufacture etc. On this<br />

account, the responsibility of the tenderer under the warranty clause will not be<br />

diluted <strong>in</strong> any way.<br />

59


20. RIGHT OF RAILWAY TO KEEP BACK FROM THE CONTRACT ANY<br />

PORTION OF WORK:<br />

The successful tenderer will however, have no claim or right <strong>in</strong> the execution of<br />

work which <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer should be carried out departmentally<br />

or otherwise and the Railway Reserves the right any time after the acceptance of<br />

the tender to keep back from the contract and carry out the work or any portion of<br />

work through any other agent it may th<strong>in</strong>k without assign<strong>in</strong>g any reason. No<br />

claim for compensation/loss or whatsoever on this account will be enterta<strong>in</strong>ed by<br />

the Railway.<br />

21. SUBLETTING AND ASSIGNMENT:<br />

21.1 The contractor may sublet a part of the works under this contract and enter <strong>in</strong>to<br />

contract with suppliers for supply of materials only with the approval of the<br />

Railway adm<strong>in</strong>istration.<br />

21.2 The names of all sub contractors proposed to be employed for execution of work<br />

or any part thereof <strong>in</strong>clud<strong>in</strong>g manufactur<strong>in</strong>g of equipment and other materials<br />

shall be submitted by the contractor to the purchaser and got approved by him<br />

before the contractor enter <strong>in</strong>to a agreement with the sub contractor for the<br />

purpose.<br />

21.3 The contractor shall arrange for effective supervision of sub contractor's work and<br />

rema<strong>in</strong> solely responsible for materials supplied and for works carried out on his<br />

behalf by the sub contractor.<br />

21.4 The contractor shall not, save with the previous consent <strong>in</strong> writ<strong>in</strong>g of the<br />

Purchaser, sublet, transfer or assign the contract or any part thereof or <strong>in</strong>terest<br />

there<strong>in</strong> or benefit or advantage thereof any manner whatsoever.<br />

21.5 In the event of the Contractor's sublett<strong>in</strong>g or assign<strong>in</strong>g this contract or any part<br />

thereof without such permission, the purchaser shall be entitled to cancel the<br />

contract and to purchase the stores elsewhere on the contractor's account and risk<br />

and the contractor shall be liable for any loss or damage which the purchaser<br />

may susta<strong>in</strong> <strong>in</strong> consequence or aris<strong>in</strong>g out of such purpose.<br />

22.1. EXECUTION OF WORK :<br />

All the work shall be executed <strong>in</strong> strict conformity to the provisions of the<br />

contract document and accord<strong>in</strong>g to detailed draw<strong>in</strong>gs, specifications and<br />

<strong>in</strong>structions as may be approved from time to time by Railway based on<br />

detailed design and eng<strong>in</strong>eer<strong>in</strong>g carried out by contractor <strong>in</strong> l<strong>in</strong>e with<br />

requirements as per contract document. The contractor shall be responsible for<br />

ensur<strong>in</strong>g that the work throughout are executed <strong>in</strong> the most substantial, proper<br />

and workman like manner with the quality of material and workmanship <strong>in</strong><br />

strict accordance with the specifications and as per sound <strong>in</strong>dustrial practices and<br />

to the entire satisfaction of the Railway. In case of any doubts regard<strong>in</strong>g any<br />

60


particulars of construction and any ambiguities <strong>in</strong> the plans, the decision of the<br />

purchaser’s eng<strong>in</strong>eer shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor.<br />

22.2 Safety of Work, Tra<strong>in</strong>s & Personnel :-<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

The contractor should abide by all the Railway regulations and also ensure that<br />

the same are followed by his representatives, agents, servants or workmen. He<br />

is therefore, bound under these clauses to give notice to them about the<br />

provisions of this clause and the consequent liability of the contractor under the<br />

agreement.<br />

No petroleum spirit with<strong>in</strong> the mean<strong>in</strong>g of the Indian Petroleum Act shall be<br />

stored at site or adjacent land until the approval of the Railway and necessary<br />

license under the Act has been obta<strong>in</strong>ed by the contractor.<br />

The contractor's employees and workers shall not for any reason operate any<br />

appliances or <strong>in</strong>stallations of the Railway concern<strong>in</strong>g the safety of tra<strong>in</strong><br />

movements, but they should whenever necessary notify the qualified Railway<br />

staff who will then take necessary steps. The contractor shall also be responsible<br />

for any damage that the may cause due to the carelessness of his workmen and<br />

will bear the consequences <strong>in</strong> this regard.<br />

The works must be carried out most carefully <strong>in</strong> such a way that they do not<br />

h<strong>in</strong>der the Railway operation except as agreed to by the Railway. The<br />

Contractor shall do no work that may <strong>in</strong>terfere with traffic until protection has<br />

been provided by the Railway and under the supervision of Railway's<br />

representative. When the work is required to be carried out on the track itself or<br />

as close to the track as may pose a hazard to rail traffic, the work shall be<br />

carried out under the supervision of an authorized Railway representative Junior<br />

Eng<strong>in</strong>eer/Senior Eng<strong>in</strong>eer/ Senior Section Eng<strong>in</strong>eer (JE/SE/SSE). Whenever<br />

track side works are undertaken by the contractors, areas for unload<strong>in</strong>g of bulk<br />

materials should be clearly demarcated and barricades provided if necessary<br />

with the consent of the Junior Eng<strong>in</strong>eer/Senior Eng<strong>in</strong>eer (JE/SE)<br />

Signal/Telecom, <strong>in</strong>-charge of the work. Suitable steps shall also be taken to<br />

prevent transport vehicles and such other mach<strong>in</strong>ery ga<strong>in</strong><strong>in</strong>g access so near the<br />

track as to threaten the safety of runn<strong>in</strong>g tra<strong>in</strong>s. That, whenever it becomes<br />

<strong>in</strong>escapable to allow transport vehicles or mobile mach<strong>in</strong>ery to operate <strong>in</strong> close<br />

proximity to the runn<strong>in</strong>g l<strong>in</strong>es the maximum mov<strong>in</strong>g dimensions for the said<br />

l<strong>in</strong>es shall be adequately protected by fenc<strong>in</strong>g or such other suitable measures.<br />

No vehicle will normally be permitted to ply adjacent to the runn<strong>in</strong>g l<strong>in</strong>es. The<br />

contractor will be responsible for the safety of hired trucks and men etc.<br />

work<strong>in</strong>g at the site. He will also be responsible for any damage caused to the<br />

Railway property, staff and passengers travell<strong>in</strong>g on the l<strong>in</strong>e on account of his<br />

truck/vehicles hav<strong>in</strong>g been allowed to ply on the bank.<br />

The contractor shall take all precautionary measures <strong>in</strong> order to ensure<br />

protection of his own personnel mov<strong>in</strong>g about or work<strong>in</strong>g on the Railway<br />

premises and shall have to conform to the Rules and Regulations of the<br />

Railway. If and when, while the work under the contract is <strong>in</strong> progress, there is<br />

likely to be any danger to the persons employed by the contractor due to runn<strong>in</strong>g<br />

of traffic or while work<strong>in</strong>g on the Railway premises, the contractor shall apply<br />

61


(vi)<br />

(vii)<br />

(viii)<br />

(ix)<br />

<strong>in</strong> writ<strong>in</strong>g to the Railway to provide flagmen or lookout men for protection. The<br />

Railway will, however, decide as to whether it is necessary to post such flagmen<br />

and lookout men for various types of works and also the number of such men<br />

required to protect the contractor's staff work<strong>in</strong>g at site. The flagmen and<br />

lookout men will be Railway Servants and no expenses on this account will be<br />

recovered from the contractor. In spite of these precautions, if any unforeseen<br />

accident or <strong>in</strong>jury happens, the contractor will be solely responsible for the<br />

same.<br />

Suitable ladders for climb<strong>in</strong>g the posts and sl<strong>in</strong>gs for support<strong>in</strong>g men on the post<br />

shall be used. Ropes as required shall be used for erection of the poles. The<br />

size of the rope shall be adequate. The contractor shall take necessary<br />

precautions for work<strong>in</strong>g near the power l<strong>in</strong>es. If at any time the Railway f<strong>in</strong>ds<br />

the safety arrangements are <strong>in</strong>adequate or <strong>in</strong>sufficient, the contractor shall take<br />

immediate corrective action as directed by the Railway's representative at site.<br />

However, it is not obligatory on the part of the Railway to give such directions.<br />

The issue or non-issue of any direction <strong>in</strong> the matter by the Railway shall <strong>in</strong> no<br />

way absolve the contractor of his sole responsibility to adopt safe work<strong>in</strong>g<br />

methods. The stone-breakers, if employed shall be provided with protective<br />

goggles and protective cloth<strong>in</strong>g and seated at sufficiently safe <strong>in</strong>tervals.<br />

Necessary personal safety equipment as considered adequate by the Eng<strong>in</strong>eer<strong>in</strong>-Charge<br />

should be kept available by the contractor for the use of the persons<br />

employed on the site and ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> a condition suitable for immediate use<br />

and the contractor should take adequate steps to ensure proper use of equipment<br />

by these concerned. When not <strong>in</strong> use, electrical apparatus shall be switched off.<br />

No pa<strong>in</strong>t conta<strong>in</strong><strong>in</strong>g lead or lead products shall be used except <strong>in</strong> the form of<br />

paste or ready mixed pa<strong>in</strong>ts. Suitable face masks should be supplied by the<br />

contractor for use by the workers when pa<strong>in</strong>t is applied <strong>in</strong> the form of spray.<br />

With<strong>in</strong> the station premises and specially on passenger platforms, the contractor<br />

shall ensure sufficient free space for movement of passenger traffic. He must<br />

cover and protect the excavations carried out <strong>in</strong> such areas with a view to avoid<br />

any accidents.<br />

In case of an accident of any nature, the contractor will <strong>in</strong>demnify the Railway<br />

for any losses caused by him as a result of the accident.<br />

The contractor will not be entitled to any compensation for any damage or loss<br />

susta<strong>in</strong>ed by him dur<strong>in</strong>g execution of the work, for any idle labour or transport<br />

or any loss or deterioration of the material or tools.<br />

22.3 Supervision & Labour:-<br />

(i)<br />

Dur<strong>in</strong>g the execution of the works the contractor or his representative shall not<br />

leave the site where the works are be<strong>in</strong>g carried out. At the site of work, the<br />

contractor shall always make available one representative who shall be approved<br />

by the Railway Adm<strong>in</strong>istration and who shall be <strong>in</strong>vested with adequate powers<br />

by the Contractor so that orders or <strong>in</strong>structions given to the said representative<br />

by the Railway Adm<strong>in</strong>istration <strong>in</strong> writ<strong>in</strong>g could be considered as duly given or<br />

conveyed to the Contractor himself. Representative of the Railway will check up<br />

the work from time to time. Supervision and Erection of <strong>in</strong>door work will be<br />

done by the contractors with their own labour, till completion and test<strong>in</strong>g of the<br />

62


(ii)<br />

(iii)<br />

work.<br />

The field supervisor shall receive <strong>in</strong>structions, <strong>in</strong> the absence of the contractor<br />

from the Eng<strong>in</strong>eer-<strong>in</strong>-charge of the work or his representative at site and comply<br />

with the <strong>in</strong>structions. The contractor shall be responsible for the compliance of<br />

such <strong>in</strong>structions.<br />

If the supervisor act<strong>in</strong>g on behalf of the contractor disobeys or does not regard<br />

the <strong>in</strong>structions of the Railway's supervisor/representative and does not execute<br />

the work to the satisfaction of this Railway supervisor, it shall be b<strong>in</strong>d<strong>in</strong>g on the<br />

contractor to replace his supervisor.<br />

23. PROGRESS REPORTING:<br />

23.1 The contractor shall submit to Railways at his own cost periodic progress<br />

reports at regular <strong>in</strong>tervals regard<strong>in</strong>g the state and progress of work. The<br />

details and pro-forma of the report will mutually be agreed after award of the<br />

Contract. Such reports shall be for daily man power, equipment and plant<br />

development, weekly work progress and monthly progress review reports. All<br />

actions as directed by Railway pursuant to such reports shall be promptly attended<br />

to by Contractor.<br />

23.2 The purchaser’s eng<strong>in</strong>eer shall also conduct monthly meet<strong>in</strong>gs with the<br />

contractor to assess and review the programme of works. The action proposed to<br />

progress the work as planned, difficulties, assistance required etc. shall be<br />

clearly brought out and remedial action taken. The m<strong>in</strong>utes of these meet<strong>in</strong>gs<br />

shall be jo<strong>in</strong>tly signed by Railways and contractor.<br />

24. MAINTENANCE OF WORKS :<br />

24.1 The contractor shall at all times dur<strong>in</strong>g the progress and cont<strong>in</strong>uance of the works<br />

and also for the period of ma<strong>in</strong>tenance specified <strong>in</strong> the tender form and after the<br />

date of pass<strong>in</strong>g of the certificate of completion by the Railway's representative or<br />

any other earlier date subsequent to the completion of the works that may be<br />

fixed by Railway's representative be responsible for and effectively ma<strong>in</strong>ta<strong>in</strong> and<br />

uphold <strong>in</strong> good, substantial, sound and perfect condition all and every part of the<br />

works and shall make good from time to time and at all times, as often as<br />

the Railway's representative shall require, any damage or defect that may dur<strong>in</strong>g<br />

the above period arise <strong>in</strong> or be discovered or be <strong>in</strong> any way connected with the<br />

works, provided that such damage or defect is not directly caused by errors<br />

<strong>in</strong> the contract documents, act of providence or <strong>in</strong>struction or civil riot, and the<br />

contractor shall be liable for and shall pay and make good to the Railways or<br />

other persons legally entitled thereto whenever required by the Railway's<br />

representative so to do, all losses, damages, costs and expenses they or any of<br />

them may <strong>in</strong>cur or be put or be liable to, by reason or <strong>in</strong> consequence of the<br />

operations of the contractor or his failure <strong>in</strong> any respect.<br />

25 CLEARANCE OF SITE:<br />

63


25.1 Contractor at his own expenses clean the site, set out all works and provide all<br />

necessary labours, pegs, str<strong>in</strong>g, steel to enable the purchaser or any of his<br />

representatives to check all sett<strong>in</strong>g out and the contractor will correct all errors at<br />

his own expenses.<br />

25.2 At the end of the work <strong>in</strong> each section the contractor shall as a part of his<br />

contractual obligation leave the area completely cleared of rubbish and<br />

obstructions of all k<strong>in</strong>ds accord<strong>in</strong>g to the <strong>in</strong>structions of the Railway's<br />

representatives. If with<strong>in</strong> fortnight of completion of the particular item of site<br />

work, the refuge is not cleared, the Railway will arrange to get them removed at<br />

the cost of the Contractor. However, before the Railway actually gets the site<br />

cleared, <strong>in</strong>timation <strong>in</strong> writ<strong>in</strong>g shall be sent to the Contractor.<br />

26. PROVISIONAL ACCEPTANCE:<br />

26.1 Immediately after the completion of the work at each station or after<br />

completion of work <strong>in</strong> a block section here<strong>in</strong> after referred as sub-section, the<br />

contractor shall certify and advise the purchaser <strong>in</strong> writ<strong>in</strong>g that the <strong>in</strong>stallation<br />

is (i) complete, (ii) ready for satisfactory service and (iii) ready to be handed<br />

over. He will also place at the disposal of the purchaser the required staff for<br />

<strong>in</strong>spection, test<strong>in</strong>g and putt<strong>in</strong>g it <strong>in</strong>to operation.<br />

26.2 The test or tests specified <strong>in</strong> Technical specification will be conducted jo<strong>in</strong>tly by<br />

the purchaser and contractor as soon as possible after receipt of advice of<br />

completion of one sub-section by the purchaser from the contractor. The<br />

test schedule shall be furnished by the tenderer which will be modified by<br />

mutual discussion between the contractor and Railway before f<strong>in</strong>alisation.<br />

Any component, modules, sub-assemblies or equipment fail<strong>in</strong>g dur<strong>in</strong>g the<br />

commission<strong>in</strong>g test shall be replaced/repaired free of cost by the tenderer.<br />

26.3 Purchaser's Eng<strong>in</strong>eer shall issue a Provisional Acceptance certificate for<br />

successful commission<strong>in</strong>g of whole system cover<strong>in</strong>g all materials and services<br />

<strong>in</strong>cluded <strong>in</strong> the Schedule of works, after the f<strong>in</strong>al acceptance test as per the<br />

approved test procedure have been completed and the performance has been<br />

found to meet the specifications. Railways decision <strong>in</strong> this respect shall be f<strong>in</strong>al.<br />

The Provisional acceptance certificate shall be signed by both the parties. The<br />

period of ma<strong>in</strong>tenance of works shall commence from the date of such certificate.<br />

26.4 The Purchaser's Eng<strong>in</strong>eer may issue such a certificate with respect to any part of<br />

the works before the completion of the whole of the works or with respect to any<br />

substantial part of the works which has been both completed to the satisfaction<br />

of the Purchaser's Eng<strong>in</strong>eer and occupied or used by the Railway and when any<br />

such certificate is given <strong>in</strong> respect of a part of the works, such part shall be<br />

considered as completed and the period of ma<strong>in</strong>tenance of such part shall<br />

commence from the date of such certificate.<br />

26.5 Should the result/s of <strong>in</strong>spection and test be not satisfactory, an extension of<br />

one month will be granted to the contractor to make good the defects and<br />

64


deficiencies po<strong>in</strong>ted out by the purchaser. Fresh <strong>in</strong>spection and test will then<br />

be carried out after the contractor has attended to the defects and<br />

deficiencies. If these tests are also not satisfactory the purchaser may proceed<br />

at the contractor's expense by all means deemed expedient, to have the<br />

<strong>in</strong>stallation made satisfactory until they comply with the specifications, and<br />

approved draw<strong>in</strong>gs and designs.<br />

26.6 In such a case or <strong>in</strong> the case of delay <strong>in</strong> complet<strong>in</strong>g the work under this contract<br />

with<strong>in</strong> the time limit the purchaser reserves the right, if he deems it possible<br />

to use <strong>in</strong> a reasonable manner any part of the <strong>in</strong>stallation even if some<br />

<strong>in</strong>stallations are not completely erected. The purchaser will give to the contractor<br />

for this purpose 7 days previous notice. The contractor shall then take at his own<br />

expense all necessary steps to complete the work <strong>in</strong> accordance with the<br />

provisions of the contract. In case it becomes impossible to proceed with the<br />

above mentioned tak<strong>in</strong>g over tests or reasons other than for which the contractor<br />

is responsible, the Provisional Acceptance Certificate shall be issued at or with<strong>in</strong><br />

a mutually agreed reasonable period not exceed<strong>in</strong>g six months after completion of<br />

<strong>in</strong>stallation.<br />

26.7 The issue of provisional acceptance will not be withheld for rectification or<br />

m<strong>in</strong>or defects as dist<strong>in</strong>ct from rejected equipment, which may not be<br />

essential for commission<strong>in</strong>g and operation of the <strong>in</strong>stallation. In such cases,<br />

only the value of the materials and cost of the rectification of the m<strong>in</strong>or defects<br />

shall be withheld from the payments on provisional acceptance until rectification<br />

is completed.<br />

27. PLACING IN SERVICE & MAINTENANCE SUPERVISION:<br />

27.1 After the equipment has been commissioned & placed <strong>in</strong> service and<br />

Provisional Acceptance certificate issued by Purchaser's Eng<strong>in</strong>eer, the<br />

contractor shall be responsible for proper ma<strong>in</strong>tenance supervision of the<br />

equipment for a period of 12 months from the date of commission<strong>in</strong>g. For this<br />

purpose he shall prepare a ma<strong>in</strong>tenance plan and make available the services<br />

of qualified ma<strong>in</strong>tenance eng<strong>in</strong>eer stationed at the location approved by<br />

Purchaser's Eng<strong>in</strong>eer who will guide and supervise the work of Railways<br />

ma<strong>in</strong>tenance staff. The ma<strong>in</strong>tenance eng<strong>in</strong>eer of the tenderer will visit each<br />

location at least once <strong>in</strong> a month and attend to any fault on the systems.<br />

27.2 Dur<strong>in</strong>g this period of ma<strong>in</strong>tenance supervision if any lacuna is noticed <strong>in</strong> the<br />

function<strong>in</strong>g as a result of any defect <strong>in</strong> design or manufacture, the same will be<br />

rectified by the contractor free of cost. Dur<strong>in</strong>g such rectification if any faulty<br />

equipment/modules need replacement or repair, they shall be provided by the<br />

contractor from the set of equipment or modules that the contractor should br<strong>in</strong>g<br />

to the site of <strong>in</strong>stallation <strong>in</strong> addition to all the materials to be supplied aga<strong>in</strong>st<br />

this contract. Use of spare modules covered under the Schedule of material of<br />

this tender shall not be permitted to be used dur<strong>in</strong>g <strong>in</strong>stallation, commission<strong>in</strong>g<br />

and ma<strong>in</strong>tenance supervision period without personal approval of Chief<br />

65


Adm<strong>in</strong>istrative Office /IRPMU Spares, so issued under unusual circumstances,<br />

should be replaced by the firm with<strong>in</strong> seven days of the issue of spares.<br />

28. FINAL ACCEPTANCE:<br />

28.1 The f<strong>in</strong>al acceptance of the entire equipment <strong>in</strong>stalled <strong>in</strong> the section shall take<br />

effect from the date of expiry of the period of ma<strong>in</strong>tenance supervision as def<strong>in</strong>ed<br />

<strong>in</strong> para- 27 or the expiry of the last of the respective period of Ma<strong>in</strong>tenance<br />

Supervision of various sections for which Provisional Acceptance Certificates<br />

are issued or brought <strong>in</strong>to full fledged operation, provided that the contractor<br />

has complied fully with his obligations under clause 27 <strong>in</strong> respect of each<br />

section under the contract.<br />

28.2 If on the other hand the contractor has not so complied with his obligation under<br />

para 27 <strong>in</strong> respect of any site the purchaser may either extend the period of<br />

ma<strong>in</strong>tenance supervision <strong>in</strong> respect of that section until the necessary works are<br />

carried out by the contractor or carry out those works suo moto on behalf of the<br />

contractor at the contractor's expenses. After expiry of the period of<br />

ma<strong>in</strong>tenance supervision for each section, a certificate of F<strong>in</strong>al Acceptance for<br />

the section shall be issued by the purchaser and the last of such certificate will be<br />

called the Last and F<strong>in</strong>al Acceptance Certificate. The contract shall not be<br />

considered as completed until the issue of F<strong>in</strong>al Acceptance Certificate by<br />

the purchaser.<br />

28.3 The purchaser shall not be liable to the contractor for any dispute aris<strong>in</strong>g out of<br />

or <strong>in</strong> connection with the contract or execution of the work unless the contractor<br />

have made a claim <strong>in</strong> writ<strong>in</strong>g <strong>in</strong> respect thereof before the issue of F<strong>in</strong>al<br />

Acceptance Certificate under this clause. The contractor shall be debarred from<br />

disput<strong>in</strong>g the correctness of the items caused by the no claim certificate or<br />

demand<strong>in</strong>g a reference to Arbitration <strong>in</strong> respect thereof.<br />

28.4 Notwithstand<strong>in</strong>g the issue of F<strong>in</strong>al Acceptance Certificate, the contractor and the<br />

purchaser (subject to Sub Clause as above) shall rema<strong>in</strong> liable for fulfilment of<br />

any obligation <strong>in</strong>curred under the provision of the contract prior to the issue of<br />

F<strong>in</strong>al Acceptance Certificate which rema<strong>in</strong>s unperformed at the time such<br />

certificate is issued and for determ<strong>in</strong><strong>in</strong>g the nature and extent of such<br />

obligation, the contract shall be deemed to rema<strong>in</strong> <strong>in</strong> force between the parties<br />

hereto.<br />

29. WARRANTY:<br />

29.1 All equipment and system supplied by the Contractor shall be guaranteed aga<strong>in</strong>st<br />

the defects for a period of 12 (twelve) months from the date of commission<strong>in</strong>g of<br />

work and plac<strong>in</strong>g <strong>in</strong> service. The date of the commission<strong>in</strong>g of the work will be<br />

after the sign<strong>in</strong>g of the provisional acceptance certificate by both the parties as per<br />

details at clause 26(26.3) above.<br />

66


29.2 Dur<strong>in</strong>g the period of warranty, the contractor shall rema<strong>in</strong> responsible to arrange<br />

replacement and for sett<strong>in</strong>g right at his own cost any equipment <strong>in</strong>stalled by him<br />

which is of defective manufacture or design or becomes unworkable due to any<br />

cause whatsoever. The decision of the Railway's representative <strong>in</strong> this regard to<br />

direct the contractor to attend to any damage or defect <strong>in</strong> work shall be f<strong>in</strong>al and<br />

b<strong>in</strong>d<strong>in</strong>g on the Contractor.<br />

29.3 Dur<strong>in</strong>g the period of warranty, the contractor shall be responsible to the extent<br />

expressed <strong>in</strong> this clause for any defects that may develop under the conditions<br />

provided for by the contract and under proper use, aris<strong>in</strong>g from faulty materials,<br />

design of workmanship <strong>in</strong> the plant, or from faulty execution of the plant by the<br />

contractor but not otherwise and shall remedy such defects at his own cost<br />

when called upon to do so by the Purchaser who shall state <strong>in</strong> writ<strong>in</strong>g <strong>in</strong> what<br />

respect the portion is faulty.<br />

29.4 If it becomes necessary for the contractor to replace or renew any defective<br />

portions of the system under this clause the provisions of this clause shall apply<br />

to the portions of the plant to be replaced or renewed until the expiration of<br />

six months from the date of such replacement or renewal or until the end of the<br />

warranty period whichever may be later. If any defect is not remedied with<strong>in</strong><br />

reasonable time, the purchaser may proceed to do the work at contractor's risk<br />

and expense, but without prejudice to any other rights which the purchaser<br />

may have aga<strong>in</strong>st the contractor <strong>in</strong> respect of such defects.<br />

29.5 If the replacement or renewal are of such a character as may affect the efficiency<br />

of the system the purchaser shall have the right to give to the contractor with<strong>in</strong><br />

one month from such replacement or renewal notice <strong>in</strong> writ<strong>in</strong>g for the tests to<br />

be carried out. The cost of all such tests shall be borne by the contractor.<br />

29.6 All <strong>in</strong>spections, adjustments, replacements or renewals carried out by the<br />

contractor dur<strong>in</strong>g the supervised ma<strong>in</strong>tenance period shall be <strong>gov</strong>erned by the<br />

special conditions of this contract.<br />

29.7 Until the f<strong>in</strong>al certificate shall have been issued, the contractor shall have the right<br />

of entry, at his own risk and expense, by himself or his duly authorised<br />

representatives, whose names shall have previously been communicated <strong>in</strong><br />

writ<strong>in</strong>g to the purchaser at all reasonable work<strong>in</strong>g hours upon all necessary<br />

parts of the works for the purpose of <strong>in</strong>spect<strong>in</strong>g the work<strong>in</strong>g and the records of<br />

the system and tak<strong>in</strong>g notes there from and, if he desires at his own risk and<br />

expense, mak<strong>in</strong>g any tests subject to the approval of the purchaser which shall<br />

not be unreasonably withheld.<br />

30. TRAINING:<br />

30.1 The tenderer shall undertake to tra<strong>in</strong> Railway eng<strong>in</strong>eers and other staff<br />

nom<strong>in</strong>ated by the Railways <strong>in</strong> different aspects of equipments function<strong>in</strong>g, field<br />

<strong>in</strong>stallation, test<strong>in</strong>g, commission<strong>in</strong>g, operation, ma<strong>in</strong>tenance and repair,<br />

cover<strong>in</strong>g both hardware and software. The tra<strong>in</strong><strong>in</strong>g should be comprehensive for<br />

67


transfer of complete know-how so as to impart full knowledge and competent to<br />

<strong>in</strong>dependently and successfully execute the <strong>in</strong>stallation, operation, ma<strong>in</strong>tenance<br />

and repair of all equipment. The tra<strong>in</strong><strong>in</strong>g courses should, apart from formal<br />

class room tra<strong>in</strong><strong>in</strong>g, <strong>in</strong>clude hand on practical experience and visits to work<strong>in</strong>g<br />

<strong>in</strong>stallation.<br />

30.2 The contractor shall at every stage of <strong>in</strong>stallation; test<strong>in</strong>g and commission<strong>in</strong>g shall<br />

provide all facilities for adequate tra<strong>in</strong><strong>in</strong>g of Railway personnel who may be<br />

deputed to work on the project.<br />

30.3 The requirement of tra<strong>in</strong><strong>in</strong>g <strong>in</strong> man-weeks has been <strong>in</strong>dicated <strong>in</strong> the schedule of<br />

requirements. The tenderer shall quote for the man week rates and Railways<br />

shall have the right to vary the tra<strong>in</strong><strong>in</strong>g period <strong>in</strong>dicated <strong>in</strong> the schedule.<br />

30.4 In the event of any equipment/sub-system be<strong>in</strong>g manufactured/assembled <strong>in</strong> India<br />

<strong>in</strong> technical collaboration with foreign firm by the tenderer or any of its subcontractor,<br />

approximately half of the tra<strong>in</strong><strong>in</strong>g provided <strong>in</strong> the schedule shall be<br />

arranged at the collaborator's premises/tra<strong>in</strong><strong>in</strong>g centre and the rema<strong>in</strong><strong>in</strong>g portion<br />

at the work<strong>in</strong>g <strong>in</strong>stallations. Details of tra<strong>in</strong><strong>in</strong>g proposal shall be submitted by<br />

the tenderer.<br />

30.5 Set of documents related to tra<strong>in</strong><strong>in</strong>g <strong>in</strong> adequate quantity shall be provided.<br />

30.6 All expenses for travel to and from the place of tra<strong>in</strong><strong>in</strong>g, board<strong>in</strong>g and lodg<strong>in</strong>g of<br />

the tra<strong>in</strong>ees shall be borne by the Railways.<br />

31. INFRINGEMENT OF PATENTS:<br />

(a)<br />

(b)<br />

The Contractor is forbidden to use any patents or registered draw<strong>in</strong>gs, processes<br />

or patterns <strong>in</strong> fulfill<strong>in</strong>g his contract without the previous consent <strong>in</strong> writ<strong>in</strong>g of the<br />

owner of such patents, draw<strong>in</strong>gs, patterns or trade marks, except where these<br />

are specified by the purchaser himself. Royalties where payable for the use of<br />

such patented processes, registered draw<strong>in</strong>gs or patterns shall be borne<br />

exclusively by the Contractor. The Contractor shall advise the purchaser of any<br />

proprietary rights that may exist on such processes, draw<strong>in</strong>gs or patterns which<br />

he may use of his own accord.<br />

In the case of patents taken out by the Contractor of the draw<strong>in</strong>gs or patterns<br />

registered by him, or of those patents, draw<strong>in</strong>gs or patterns for which he holds<br />

a license, the sign<strong>in</strong>g of the contract automatically gives the Purchaser the<br />

right to repair by himself the purchased articles covered by the patent or by<br />

any person or body chosen by him and to obta<strong>in</strong> from any sources he desires the<br />

component parts required by him for carry<strong>in</strong>g out the repair work. In the<br />

event of <strong>in</strong>fr<strong>in</strong>gement of any patent rights due to above action of the purchaser,<br />

he shall be entitled to claim damages from the contractor on the grounds of any<br />

loss of any nature which he may suffer.<br />

32. LICENSE AS PER GOVT. OF INDIA CONTRACT LABOUR ACT:<br />

68


32.1 The contractors are required to produce license as enjo<strong>in</strong>ed <strong>in</strong> the Government of<br />

India Contract Labour (Regulation and Abolition) Act (1978). They shall not be<br />

allowed to undertake or execute any work through contract labour except under<br />

and <strong>in</strong> accordance with a license issued under the said Act <strong>in</strong> that behalf by<br />

the authorised licens<strong>in</strong>g Officer.<br />

33. DEFAULT & DELAYS:<br />

The Contractor shall execute the work with due diligence and expedition, keep<strong>in</strong>g<br />

to the approved Time schedule. Should he refuse or neglect to comply with any<br />

reasonable orders given to him <strong>in</strong> writ<strong>in</strong>g by the Purchaser's Eng<strong>in</strong>eers <strong>in</strong><br />

connection with the work or contravene the provision of the contract or the<br />

progress of work lags persistently beh<strong>in</strong>d the time schedule due to his neglect,<br />

the Purchaser shall be at liberty to give seven days notice <strong>in</strong> writ<strong>in</strong>g to the<br />

Contractor requir<strong>in</strong>g him to make good the neglect or contravention compla<strong>in</strong>ed<br />

of and should the contractor fail to comply with the requisitions made <strong>in</strong> the<br />

notice with<strong>in</strong> seven days from the receipt thereof, it shall be lawful for the<br />

purchaser to take the work wholly or <strong>in</strong> part out of the Contractor's hands<br />

without any further reference and get the work or any part thereof, as the case<br />

may be, completed by other agencies at the expense of the contractor without<br />

prejudice to any other right or remedy of the Purchaser.<br />

34. LOSS SUSTAINED DUE TO DEFAULT AND DELAY:<br />

In the event of any loss to the purchaser on account of execution and/or<br />

completion of the work or any part thereof by agencies other than the<br />

contractor, the contractor shall be liable to reimburse the loss to purchaser<br />

without prejudice to the other rights and remedies of the purchaser, and<br />

the reimbursement <strong>in</strong> full or <strong>in</strong> part as the case may be, shall be met, at the<br />

option of the purchaser from out of all or any of the follow<strong>in</strong>g sources viz :<br />

i) Any amount due and payable to the contractor by the purchaser on any<br />

account whatsoever;<br />

ii) The Contractor's security deposit <strong>in</strong> hands of the purchaser as far as available,<br />

and any other assets whatsoever of the contractor;<br />

In the event of re-imbursement from out of sources (i) and/or (ii) above<br />

mentioned, the purchaser shall have the right of appropriation sue motto.<br />

35. PENALTY FOR DELAY IN COMPLETION:<br />

a) If the contractor fails to execute and complete the work with<strong>in</strong> the time<br />

specified <strong>in</strong> the Agreement or with<strong>in</strong> the period of extension granted under para<br />

36 except <strong>in</strong> so far as the delay is on the purchaser's account, the contractor shall<br />

be levied Liquidated Damages @ 1/2% per week or part thereof of the entire<br />

contract value of the work awarded to the contractor for delays <strong>in</strong><br />

supply/execution of the work as per General Condition of contract.<br />

69


) For the purpose of this clause, the contract value of the works shall be taken as<br />

value of work as per contract agreement <strong>in</strong>clud<strong>in</strong>g any supplementary work<br />

order/contract agreement issued Provided also, that the total amount of liquidated<br />

damages under this condition shall not exceed the under noted percentage value<br />

or of the total value of the item or groups of items of work for which a separate<br />

dist<strong>in</strong>ct completion period is specified <strong>in</strong> the contract.<br />

(i) For contract value up to Rs. 2 Lakhs -- 10% of the total value of the<br />

contract.<br />

(ii) For contracts valued above Rs. 2 Lakhs -- 10% for the first Rs.2 Lakhs and<br />

the 5% of the balance.<br />

Provided further, that if the Railway is not satisfied that the works can be<br />

completed by the Contractor and <strong>in</strong> the event of failure on the part of the<br />

contractor to complete the work with<strong>in</strong> further extension of time allowed as<br />

aforesaid, the Railway shall be entitled, without prejudice to any other right or<br />

remedy available <strong>in</strong> that behalf, to appropriate the contractor’s security deposit<br />

and resc<strong>in</strong>d the contract under clause 62 of these conditions, whether or not actual<br />

damage is caused by such default.<br />

36. EXTENSION OF TIME:<br />

If such a failure as aforesaid shall have arisen from any cause which the<br />

Purchaser may agree as be<strong>in</strong>g a reasonable ground for extension of time, the<br />

Chief Adm<strong>in</strong>istrative Officer / IRPMU or his successor(s) may allow such<br />

additional time as he may <strong>in</strong> his absolute discretion consider to be reasonably<br />

justified by the circumstances of the case, such extensions shall be granted with<br />

liquidated damages <strong>in</strong> the Form No.11. The Contractor will apply for extension<br />

at least two months before the expiry of the period of completion. Form No.12<br />

will be applicable <strong>in</strong> case extension is on purchaser’s account and also <strong>in</strong> case<br />

extension is on contractor's account but the purchaser is reasonably satisfied that<br />

contractor cannot be penalised for such delay. The terms and conditions of the<br />

orig<strong>in</strong>al contract will rema<strong>in</strong> operative dur<strong>in</strong>g the extended period and noth<strong>in</strong>g<br />

will be allowed on this account.<br />

37. CONTRATOR'S LIABILITIES FOR COSTS AND DAMAGES:<br />

37.1 WITHHOLDING AND LIEN IN RESPECT OF SUMS CLAIMED:<br />

a) Whenever any claim or claims for payment of a sum of money arises out of<br />

under the contract aga<strong>in</strong>st the contractor, the Purchaser shall be entitled to<br />

withhold and also have lien to reta<strong>in</strong> such sum or sums <strong>in</strong> whole or <strong>in</strong> part from<br />

the security, if any, deposited by the contractor and for the purpose aforesaid the<br />

purchaser shall be entitled to withhold the said cash security deposit or the<br />

security, if any, furnished as the case may be and also have lien over the sum<br />

pend<strong>in</strong>g f<strong>in</strong>alisation or adjudication of any such claim.<br />

70


) In the event of the security be<strong>in</strong>g <strong>in</strong>sufficient to cover the claimed amount or<br />

amounts or if no security has been taken from the Contractor, the purchaser shall<br />

be entitled to withhold and have lien to reta<strong>in</strong> to the extent of such claim amount<br />

or amounts referred to spura, from any sum or sums found payable or which at<br />

any time thereafter may become payable to the Contractor under the same<br />

contract or any other department of the Central Government pend<strong>in</strong>g<br />

f<strong>in</strong>alisation or adjudication of any such claims.<br />

c) It is an agreed term of the contract that the sum of money or moneys so withheld<br />

or reta<strong>in</strong>ed under the lien referred to by the purchaser till the claim aris<strong>in</strong>g out of<br />

or under the contract is determ<strong>in</strong>ed by the Arbitrator. (If the contract is <strong>gov</strong>erned<br />

by the Arbitration clause) or by the competent court as the case may be and that<br />

the contractor will have no claim for <strong>in</strong>terest of damages whatsoever on any<br />

account <strong>in</strong> respect of such withhold<strong>in</strong>g or retention under the lien referred to<br />

spura and duly notified as such to the Contractor.<br />

d) For the purpose of this clause, where contractor is a partnership firm or a<br />

limited company, the purchaser shall be entitled to withhold and also have a lien<br />

to reta<strong>in</strong> towards such claimed amount or amounts <strong>in</strong> whole or <strong>in</strong> part from any<br />

sum found payable to any partner/limited company, as the case may be,<br />

whether <strong>in</strong> his <strong>in</strong>dividual company or otherwise.<br />

37.2 LIEN IN RESPECT OF OTHER CONTRACTS:<br />

a) Any sum or sums of money due and payable to the Contractor (<strong>in</strong>clud<strong>in</strong>g the<br />

security deposit returnable to him under the contract) may be withheld or<br />

reta<strong>in</strong>ed by way of lien by the Purchaser aga<strong>in</strong>st any claim of this Railway or<br />

any other Railways or any other Departments of the Central Government <strong>in</strong><br />

respect of payment of a sum of money aris<strong>in</strong>g out of or under any other<br />

contract made by the Contractor with this or any other Railway or any other<br />

department of the Central Government.<br />

b) It is an agreed term of the contract that the sum of money so withheld or reta<strong>in</strong>ed<br />

under this clause by the purchaser will be kept withheld or reta<strong>in</strong>ed as such by<br />

the purchaser till the claim aris<strong>in</strong>g out of or under any other contract is<br />

either mutually settled or determ<strong>in</strong>ed by the Arbitrator if the other contract is<br />

<strong>gov</strong>erned by the Arbitration clause or by the competent court as the case may<br />

be, and that the contractor shall have no claim for <strong>in</strong>terest or damages <strong>in</strong> respect<br />

of any sum of money withheld or reta<strong>in</strong>ed under this clause and duly notified to<br />

the contractor.<br />

38. UNIT PRICES:<br />

38.1 The prices quoted by the Tenderer shall <strong>in</strong>clude the prices of materials <strong>in</strong>clud<strong>in</strong>g<br />

all <strong>in</strong>cidental charges for transport, load<strong>in</strong>g/unload<strong>in</strong>g and handl<strong>in</strong>g of<br />

materials, commission for arrang<strong>in</strong>g despatch by rail / road direct from<br />

manufacturer's factory and complet<strong>in</strong>g all necessary formalities <strong>in</strong> this respect,<br />

such as submission of forward<strong>in</strong>g notes, arrang<strong>in</strong>g placement of Wagon,<br />

71


collection of banker's charges for Bank guarantee, Indemnity Bonds, <strong>in</strong>clusive<br />

of cost of Stamp etc. as also sid<strong>in</strong>g or shunt<strong>in</strong>g charges, if any, levied by the<br />

Railway. The break up of the basic cost and other taxes and duties shall be<br />

positively submitted.<br />

38.2 The prices shall <strong>in</strong>clude all taxes, duties, Royalty and levies (<strong>in</strong>clud<strong>in</strong>g Octroi<br />

etc.) applicable on this Works Contract. Therefore, they should quote their prices<br />

tak<strong>in</strong>g <strong>in</strong>to account the rate of sales tax as leviable <strong>in</strong> the event of sale to the<br />

Central Government Organisation etc. It is clarified that required form applicable<br />

for this purpose will be supplied to the contractor, as applicable <strong>in</strong> the state where<br />

the contract is be<strong>in</strong>g executed. The prices shall also <strong>in</strong>clude provision for losses<br />

and wastage <strong>in</strong> transit and <strong>in</strong>stallation and commission<strong>in</strong>g.<br />

38.3 The prices quoted by the tenderer shall <strong>in</strong>clude cost of commission<strong>in</strong>g and<br />

test<strong>in</strong>g and all costs of Adm<strong>in</strong>istration of Contract, Insurance Premium,<br />

Banker's charges for guarantees, cost of storage, load<strong>in</strong>g-unload<strong>in</strong>g and handl<strong>in</strong>g<br />

of materials and for any road transport which the contractor may use for carriage<br />

of materials to his depot and the site of work. The prices shall <strong>in</strong>clude the cost of<br />

works and adjustments necessary to be done by the contractor dur<strong>in</strong>g or after tests<br />

carried out by the purchaser.<br />

38.4 The price to be quoted by the tenderer's should take <strong>in</strong>to account the credit availed<br />

on <strong>in</strong>puts under the MODVAT scheme <strong>in</strong>troduced w.e.f. 1st March 1986. The<br />

tenderers should give a declaration that any let offs <strong>in</strong> respect of duties on <strong>in</strong>puts<br />

as admissible under law is be<strong>in</strong>g totally and unconditionally passed on to the<br />

purchaser <strong>in</strong> the price quoted by him (see para 43).<br />

38.5 While the price quoted <strong>in</strong> the contract are <strong>in</strong>clusive of all taxes i.e. custom duty,<br />

excise duty, octroi, local levies, Sales tax levied by any statutory authority, the<br />

purchaser shall make any deduction toward sales tax on works contract if<br />

statutorily required to do so. The deducted sales tax on works contract shall be<br />

remitted to the concerned sales tax authority and the purchaser shall <strong>in</strong> no way be<br />

responsible for any disputes between the sales tax authorities and the contractor <strong>in</strong><br />

this regard.<br />

38.6 All taxes, duties and levies (Includ<strong>in</strong>g octroi etc.) aris<strong>in</strong>g out of the transaction<br />

between the contractor and his sub contractor/supplier for this work will be<br />

<strong>in</strong>cluded <strong>in</strong> the rates quoted by the contractor <strong>in</strong> the relevant schedule.<br />

38.7 Arrangement of permits/license for materials will not be made by the Railway<br />

or any assistance given. The Contractor will have to make his own<br />

arrangement. Also no import license shall be arranged by the Railway for this<br />

work.<br />

38.8 The Unit prices offered aga<strong>in</strong>st the various items <strong>in</strong> schedules will <strong>in</strong>clude beside<br />

labour the follow<strong>in</strong>g elements of cost :-<br />

72


(i) Cost of all materials required for prepar<strong>in</strong>g the cable routes, lay<strong>in</strong>g the cables and<br />

all other <strong>in</strong>cidentals connected therewith exclud<strong>in</strong>g the materials supplied by the<br />

Railways.<br />

(ii) Special tools & <strong>in</strong>stallation materials for IPDSLAM, racks, wir<strong>in</strong>g etc. (see para<br />

10).<br />

(iii) Cost of transportation of material, supplied by the Railway from place of<br />

delivery to the site of work.<br />

(iv) Return of released materials, left over cables and other materials from the site of<br />

work and hand<strong>in</strong>g over to the Eng<strong>in</strong>eer at specified locations or stores depot.<br />

(v) Cost of preparation of detailed documentation completion plans/draw<strong>in</strong>gs (see<br />

para 12).<br />

(vi) All other miscellaneous expenses necessary for the execution of the work and<br />

fulfilment of contractual obligation.<br />

39. MEASUREMENT OF WORKS:<br />

39.1 Payments for the works shall be made <strong>in</strong> accordance with approved designs &<br />

draw<strong>in</strong>gs and measured <strong>in</strong> relevant units except where provided or otherwise.<br />

The measurements will be made generally <strong>in</strong> accordance with standard<br />

eng<strong>in</strong>eer<strong>in</strong>g practice & <strong>in</strong> conformity with the General conditions of Contract.<br />

39.2 Figures, Dimensions and Draw<strong>in</strong>gs shall supersede measurement by scale and<br />

draw<strong>in</strong>gs to a larger scale shall take precedence over those to a smaller scale.<br />

Special dimensions or directions <strong>in</strong> the specification shall supersede all else.<br />

39.3 MEANING AND INTERPRETATION BY RAILWAY TO BE FINAL :<br />

All measurement, method of measurement, mean<strong>in</strong>g and <strong>in</strong>tent of specifications<br />

and <strong>in</strong>terpretation of Special Conditions of Contract, given and made by the<br />

Purchaser or by the Purchaser’s Eng<strong>in</strong>eer shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g and shall<br />

be considered "excepted matters" <strong>in</strong> terms of conditions laid down <strong>in</strong> the<br />

General Conditions of Contract.<br />

40. TERMS OF PAYMENT:<br />

40.1 Payment to contractor will be made through EFT/ECS. All bills shall be submitted to<br />

the authority mentioned <strong>in</strong> Preamble or as nom<strong>in</strong>ated by CAO/IRPMU from time<br />

to time.<br />

40.2 Subject to any deductions or recovery which the Railway may be entitled to<br />

make under contract, the Contractor will be entitled to be paid from time to<br />

73


time by way of `on account payment' for supply of goods and `progress<br />

payment' for works as <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer he has executed <strong>in</strong> terms<br />

of Contract.<br />

40.3 ON ACCOUNT PAYMENT:<br />

"On Account Payment" will be made for supply of equipment, materials <strong>in</strong>dicated<br />

<strong>in</strong> the supply schedule on receipt of materials <strong>in</strong> good condition at the<br />

site as certified by Eng<strong>in</strong>eers representative. On Account payments made will<br />

subsequently be adjusted aga<strong>in</strong>st payments due on Provisional Acceptance or<br />

F<strong>in</strong>al Acceptance. 75% (Seventy five percent) of the value of each consignment<br />

shall be paid on production of the follow<strong>in</strong>g documents :<br />

a) Store receipt certificate issued by Railway official/Representative as per<br />

Form-14.<br />

b) Orig<strong>in</strong>al Inspection certificate issued by Inspect<strong>in</strong>g Officer viz.<br />

RDSO/RITES/Railway Representative or Inspection Waiver Certificate issued by<br />

competent authority..<br />

c) Manufacturer's certificate for IP DSLAM equipments and associated equipment<br />

that the materials are <strong>in</strong> accordance with the specifications of the contract.<br />

d) Challan / Invoice <strong>in</strong> duplicate. No 3 rd party <strong>in</strong>voice generated <strong>in</strong> the name of<br />

Railway shall be accepted.<br />

e) A certificate that the materials supplied are as per the contract and the amount<br />

claimed <strong>in</strong> the <strong>in</strong>voice is correct as per terms of the contract.<br />

(i) Current Income Tax Clearance Certificate.<br />

(ii)<br />

Current Sale Tax Clearance Certificate. (Form No.58)<br />

40.4 All on account payments shall be covered by a stand<strong>in</strong>g <strong>in</strong>demnity bond <strong>in</strong> the<br />

approved form (see form No.6).<br />

40.5 15% (Fifteen percent) value of the goods supplied shall be paid after the<br />

successful completion of <strong>in</strong>stallation & commission<strong>in</strong>g of a location.<br />

40.6 15% payment aga<strong>in</strong>st supply of spares ( Para 13 of SCC) and of goods supplied<br />

but not <strong>in</strong>stalled / not required to be <strong>in</strong>stalled, shall be paid after issue of<br />

provisional acceptance certificate.<br />

40.7 90% (N<strong>in</strong>ety percent) of the <strong>in</strong>stallation rate quoted <strong>in</strong> rate schedule shall be paid<br />

to the contractor as on account bills only on production of certificate by the site<br />

eng<strong>in</strong>eer that relevant portion of <strong>in</strong>stallation has been completed.<br />

41. FINAL PAYMENT:<br />

74


F<strong>in</strong>al payment of 10% (Ten percent) of contract value shall be made after<br />

satisfactory operation and ma<strong>in</strong>tenance of the equipment under the supervision of<br />

the contractor for a period of one year after commission<strong>in</strong>g and issue of F<strong>in</strong>al<br />

Acceptance Certificate. On the basis of F<strong>in</strong>al Acceptance Certificate from the<br />

Purchaser's Eng<strong>in</strong>eer for all the works <strong>in</strong> all the sections covered <strong>in</strong> this<br />

contract, and reconciliation of materials issued, the f<strong>in</strong>al bill for the balance<br />

payment for each item of work shall be submitted by the Contractor along with<br />

a clear `No Claim Certificate'. The F<strong>in</strong>al Acceptance Certificate shall be issued by<br />

the Purchaser's Eng<strong>in</strong>eer only when he has accepted the work wholly after<br />

conduct<strong>in</strong>g the acceptance tests as per the details given <strong>in</strong> the technical<br />

specification and supplement.<br />

42. FINAL SETTLEMENT:<br />

On expiry of the warranty period and issue of the certificate of f<strong>in</strong>al<br />

acceptance of the entire <strong>in</strong>stallations the security deposit will be refunded or<br />

Bank Guarantee released to the Contractor after adjustment of any dues<br />

payable by the contractor.<br />

Railways shall release performance guarantee after satisfactory completion of<br />

warranty period, issue of certificate of proper function<strong>in</strong>g and ma<strong>in</strong>tenance of<br />

system by Eng<strong>in</strong>eer <strong>in</strong> charge of work, on sign<strong>in</strong>g of AMC Contract with Railway<br />

if so decided by Railway, submission of any security or bank guarantee required<br />

for AMC, compliance of any other relevant applicable clause and after recover<strong>in</strong>g<br />

any dues payable by contractor.<br />

43. CERTIFICATE FOR MODVAT BENEFITS ON BILLS:<br />

a) The Contractor should submit the follow<strong>in</strong>g certificate along with the bills :-<br />

"We certify that no additional duty set off on the Goods supplied by us have<br />

accrued under the MODVAT Scheme <strong>in</strong> force on the date of supply after we<br />

submitted our quotations and submitted the present bill."<br />

b) In the event of MODVAT credit be<strong>in</strong>g extended by the Government of India<br />

to more items than that already covered, the firm should advise the purchaser<br />

about the additional benefits accrued through a letter conta<strong>in</strong><strong>in</strong>g the follow<strong>in</strong>g<br />

certificate or any variation thereof as may be considered necessary by<br />

<strong>in</strong>dividual Railway adm<strong>in</strong>istration :-<br />

“We hereby declare that we can avail additional duty set off as per latest<br />

MODVAT scheme <strong>in</strong> force now and we hereby give a reduction of<br />

(___________) per unit and agree to revise the prices <strong>in</strong>dicated <strong>in</strong> the order. The<br />

current E.D. of (_________) is payable on this reduced price. Therefore, we<br />

request you to amend the order accord<strong>in</strong>gly."<br />

44. DEDUCTION FROM ON ACCOUNT PAYMENT BILLS:<br />

75


(i) All costs, damages or expenses, which Railways may have paid or <strong>in</strong>curred,<br />

which under the provisions of contract are Contractor's obligations will be<br />

deducted by Railways from progress payment Bills/Invoice of contractor, as<br />

and when it is understood that such an expenses has been <strong>in</strong>curred or paid for.<br />

(ii)<br />

All such claims of Railways shall, however, be duly supported by appropriate and<br />

certified vouchers, receipts or explanations as are available to enable the<br />

contractor to identify such claims.<br />

45. TAXES:<br />

45.1 The Contractor and all personnel employed by him shall pay such taxes like<br />

Income Tax as are payable under statutory laws of India and the Purchaser<br />

WILL NOT ACCEPT any liability for the same.<br />

45.2 Deduction of Income Tax at source as per provisions of F<strong>in</strong>ance Act and<br />

Income Tax Act <strong>in</strong> force shall be made from the Contractor/Sub-Contractor and<br />

the amount so deducted may be credited to the Central Government.<br />

45.3 Wherever the law makes it statutory for the Purchaser to deduct any amount<br />

towards Sales Tax on Works Contract, the same will be deducted and remitted to<br />

the concerned authority.<br />

46. MOBILIZATION ADVANCE (Not applicable <strong>in</strong> Present tender)<br />

(a)<br />

If required by the Contractor, mobilisation advance limited to 10% of contract<br />

value shall be payable on submission of irrevocable Bank Guarantee from a<br />

Nationalised Bank <strong>in</strong> India or the State Bank of India <strong>in</strong> a form acceptable to the<br />

Railway (Form No.8). This advance shall be payable <strong>in</strong> two stages as under :-<br />

Stage : 1.<br />

5% of the contract value on sign<strong>in</strong>g the contract.<br />

2. 5% of the contract value on mobilisation of establishment etc., i.e.<br />

sett<strong>in</strong>g up of project office and commencement of telecom. Works.<br />

Interest: - The mobilisation advance shall carry on <strong>in</strong>terest at the rate of<br />

18% per annum and recovery of the mobilisation advance along with its<br />

<strong>in</strong>terest shall be made from `On account and progress bills <strong>in</strong>clud<strong>in</strong>g design<br />

payment and advance payments for the work on pro-rata basis. The <strong>in</strong>terest<br />

will be charged on balance outstand<strong>in</strong>g on the first day of each month.<br />

The recovery of the advance shall be commenc<strong>in</strong>g when the work to an extent of<br />

15% of the provisional value of the contract is completed. The recovery of<br />

pr<strong>in</strong>cipal and <strong>in</strong>terest shall be made at the rate of 15% of on account and/or<br />

progress payment such that the entire amount is recovered before total<br />

payment reach 85% of the value of the contract.<br />

76


(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

In case pr<strong>in</strong>cipal and <strong>in</strong>terest could not be deducted progressively from<br />

progress/on account bills dur<strong>in</strong>g the course of the year, the <strong>in</strong>terest <strong>in</strong> mobilisation<br />

advance as accrued <strong>in</strong> the end of an year will be recovered with<strong>in</strong> the first 30<br />

days of the next year from the progress/on account bills or any other bills which<br />

may be made by the Railways to the Contractor. If, for the reason whatever,<br />

progress/on account bill or any other amount is paid to the Contractor, he will<br />

still pay to the Railways the accrued <strong>in</strong>terest <strong>in</strong> full with<strong>in</strong> the said 30 days of<br />

the next year. Otherwise, the unpaid <strong>in</strong>terest will be added on to the Pr<strong>in</strong>cipal<br />

and <strong>in</strong>terest for the next year will be charged on the balance compris<strong>in</strong>g Pr<strong>in</strong>cipal<br />

as well as unpaid <strong>in</strong>terest.<br />

In case of extension of the date of completion due to any reason whatsoever the<br />

<strong>in</strong>terest on the mobilisation advance outstand<strong>in</strong>g would cont<strong>in</strong>ue to accrue as<br />

specified earlier and the contractor/firm would make the payment aga<strong>in</strong>st the<br />

advance <strong>in</strong> the same manner as specified <strong>in</strong> Para (b) above.<br />

No advance/extra payment other than stated above shall be payable aga<strong>in</strong>st the<br />

works.<br />

The Tenderers shall specifically <strong>in</strong>dicate <strong>in</strong> their offer whether mobilisation<br />

advance is required by them. In case no specific demand has been made <strong>in</strong> the<br />

offer, grant of mobilisation advance will not be considered subsequently.<br />

No mobilisation advance would be considered for Contract with a value less<br />

than Rs.1 (one) crore.<br />

47. INSURANCE:<br />

47.1 The Contractor shall take out and keep <strong>in</strong> force a policy or policies of <strong>in</strong>surance<br />

aga<strong>in</strong>st all liabilities of the Contractor or the Purchaser at common law or under<br />

any statute <strong>in</strong> respect of accidents to persons who shall be employed by the<br />

contractor <strong>in</strong> or about the site for the purpose of carry<strong>in</strong>g out the works on the<br />

site. The Contractor shall also take out and keep <strong>in</strong> force a policy or policies of<br />

Insurance aga<strong>in</strong>st all recognised risks to their offices and depots. Such <strong>in</strong>surance<br />

shall <strong>in</strong> all respects be to the approval of the Purchaser and if he so requires <strong>in</strong><br />

his name.<br />

47.2 INSURANCE OF MATERIALS & INSTALLATIONS:<br />

The Contractor shall take out and keep <strong>in</strong> force a policy or policies of Insurance<br />

for all materials <strong>in</strong>clud<strong>in</strong>g Railway supply materials equipment irrespective of<br />

whether used up <strong>in</strong> the portion of work already done or kept for the use <strong>in</strong> the<br />

balance portion of the work until such works are provisionally handed over to<br />

the Railways. For this purpose the works are deemed to have been provisionally<br />

handed over when Provisional acceptance certificate is issued for the Subsection<br />

as per para 26 of SCC.<br />

77


47.3 The Contractor shall not be liable for losses/damages to the materials either used<br />

up <strong>in</strong> the portion of work done or his material kept for use at site, <strong>in</strong><br />

consequence of mut<strong>in</strong>y, or other similar causes over which the Contractor has no<br />

control and which cannot be <strong>in</strong>sured. Such losses or damages shall be the liability<br />

of the Purchaser and if required by the Purchaser, be made good by the<br />

contractor, at the cost of the Purchaser.<br />

47.4 The Contractor should, however, <strong>in</strong>sure the stores brought to site, aga<strong>in</strong>st risks<br />

<strong>in</strong> consequence of war and <strong>in</strong>vasion, as required under the Emergency Risk<br />

(Goods) Insurance Act <strong>in</strong> force from time to time.<br />

47.5 It may be noted that the beneficiary of the <strong>in</strong>surance policy should be Railways<br />

or the policies should be pledged <strong>in</strong> favour of Railway. The contractor shall keep<br />

the policy/policies current till the <strong>in</strong>stallations are provisionally handed over to<br />

the Purchaser. It may also be noted that <strong>in</strong> the event of contractor's failure<br />

to keep the policy current and alive, renewal of the policy will be done by the<br />

purchaser for which the cost of the premium plus 20% of premium shall be<br />

recovered from the contractor.<br />

47.6 For purpose of enabl<strong>in</strong>g the contractor to take the <strong>in</strong>surance cover <strong>in</strong><br />

connection with this contract, the purchaser's eng<strong>in</strong>eer will advise the<br />

approximate price of all the Railway supply materials to the contractor.<br />

47.7 The Contractor shall take out all Insurance covers <strong>in</strong> connection with this<br />

contract with General Insurance Corporation of India only.<br />

48. FORCE MAJEURE CLAUSE :<br />

If at any time, dur<strong>in</strong>g the cont<strong>in</strong>uance of this contract, the performance, <strong>in</strong> whole<br />

or part, by either party, of any obligation under this contract shall be prevented or<br />

delayed by reason of any war, hostility, act of the public enemy, Civil<br />

Commotion, Sabotage, Fires, Floods, Earth quakes, explosions, strikes,<br />

epidemics, quarant<strong>in</strong>e, restrictions lockouts, any statute, statutory rules,<br />

regulations, order of requisitions issued by any Government Department or<br />

Competent Authority or acts of God (here-<strong>in</strong> after referred to as event) then<br />

provided notice of the happen<strong>in</strong>g of any such, event is given by either party to<br />

the other with<strong>in</strong> twenty one days from the date of occurrence thereof neither<br />

party shall by reason of such event be entitled to term<strong>in</strong>ate this Contract nor<br />

shall either party have any claim for damage aga<strong>in</strong>st the other <strong>in</strong> respect of such<br />

non-performance or delay <strong>in</strong> performance, and the obligations under the<br />

Contract shall be resumed as soon as practicable after such event has come to an<br />

end or ceased to exist, provided further that if the performance <strong>in</strong> whole or<br />

part of any obligation under this contract is prevented or delayed by reason of<br />

any such event beyond a period as mutually agreed to by the Railways and the<br />

Contractor after any event or 60 days <strong>in</strong> the absence of such an agreement<br />

whichever is more, either party may at its option term<strong>in</strong>ate the Contract<br />

provided also that if the contract is so term<strong>in</strong>ated under this clause the Railways<br />

78


may at the time of such term<strong>in</strong>ation take over from the Contractor at prices as<br />

provided for <strong>in</strong> the contract, all works executed or works under execution.<br />

49. SETTLEMENT OF DISPUTE AND ARBITRATION:<br />

49.1 MATTERS FINALLY DETERMINED BY THE RAILWAY:<br />

All disputes or differences of any k<strong>in</strong>d whatsoever aris<strong>in</strong>g out of or <strong>in</strong> connection<br />

with the contract, whether dur<strong>in</strong>g the progress of the work or after its completion<br />

and whether before or after the determ<strong>in</strong>ation of the contract shall be referred<br />

by the contractor to the Railway and the Railway shall with<strong>in</strong> 120 days after<br />

receipt of the contractor's representation make and notify decisions on all matters<br />

referred to by the contractor <strong>in</strong> writ<strong>in</strong>g provided that matters for which<br />

provision has been made <strong>in</strong> clauses 8(a), 18, 22(5), 39, 43(2), 45(a) 55, 55-<br />

A(5), 57, 57A, 61(1), 61(2) and 62(i)(b) of General Conditions of Contract or <strong>in</strong><br />

any clause of the Special Conditions of the Contract shall be deemed as<br />

'excepted matters' and decision of the Railway authority, thereon shall be<br />

f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor provided further that 'excepted matters' shall<br />

stand specifically excluded from the purview of the arbitration clause and not<br />

be referred to arbitration.<br />

50. DEMAND FOR ARBITRATION:<br />

50.1 (i) In the event of any dispute or difference between the parties hereto as<br />

to the construction or operation of this contract, or the respective rights and<br />

liabilities of the parties on any matter <strong>in</strong> question, dispute or difference on any<br />

account or as to the withhold<strong>in</strong>g by the Railway of any certificate to which the<br />

contractor may claim to be entitled to, or if the Railway fails to make a decision<br />

with<strong>in</strong> 120 days, then and <strong>in</strong> any such case, but except <strong>in</strong> any of the 'excepted<br />

matters' referred to <strong>in</strong> clause 49.1 of these conditions, the contractor, after 120<br />

days but with<strong>in</strong> 180 days of his present<strong>in</strong>g his f<strong>in</strong>al claim on disputed matters<br />

shall demand <strong>in</strong> writ<strong>in</strong>g that the dispute or difference be referred to Arbitration.<br />

(ii)<br />

(a)<br />

(b)<br />

The demand for arbitration shall specify the matters which are <strong>in</strong> question or<br />

subject of the dispute or difference as also the amounts of claim item-wise.<br />

Only such dispute(s) or difference(s) <strong>in</strong> respect of which the demand has<br />

been made, together with counter claims or set off shall be referred to<br />

arbitration and other matters shall not be <strong>in</strong>cluded <strong>in</strong> the reference.<br />

The Arbitration preceed<strong>in</strong>gs shall be assumed to have commenced from the<br />

day, a written and valid demand for arbitration is received by the Railway.<br />

The claimant shall submit his claim stat<strong>in</strong>g the facts support<strong>in</strong>g the claims along<br />

with all relevant documents and the relief or remedy sought aga<strong>in</strong>st each claim<br />

with<strong>in</strong> a period of 30 days from the date of appo<strong>in</strong>tment of the Arbitral Tribunal.<br />

79


(c)<br />

(iii)<br />

The Railway shall submit its defence statement and counter claims, if any<br />

with<strong>in</strong> a period of 60 days of receipt of copy of claims from Tribunal thereafter,<br />

unless otherwise extension has been granted by Tribunal.<br />

No new claim shall be added dur<strong>in</strong>g proceed<strong>in</strong>gs by either party. However<br />

party may amend or supplement the orig<strong>in</strong>al claim or defence thereof dur<strong>in</strong>g<br />

the course of arbitration proceed<strong>in</strong>gs subject to acceptance by Tribunal hav<strong>in</strong>g<br />

due regard to the delay <strong>in</strong> mak<strong>in</strong>g it.<br />

(iv)<br />

If the contractor(s) does/do not prefer his/their specific and f<strong>in</strong>al claims <strong>in</strong><br />

writ<strong>in</strong>g, with<strong>in</strong> a period of 90 days of receiv<strong>in</strong>g the <strong>in</strong>timation from the<br />

Railways that the f<strong>in</strong>al bill is ready for payment, he/they will be deemed to<br />

have waived his/their claim(s) and the Railway shall be discharged and<br />

released of all liabilities under the contract <strong>in</strong> respect of these claims.<br />

50.2 OBLIGATIONS DURING PENDENCY OF ARBITRATION:<br />

Work under the contract shall, unless otherwise directed by the Eng<strong>in</strong>eer,<br />

cont<strong>in</strong>ue dur<strong>in</strong>g the arbitration proceed<strong>in</strong>gs, and no payment due or payable by<br />

the Railway shall be withheld on account of such proceed<strong>in</strong>gs, provided,<br />

however, it shall be open for Arbitral Tribunal to consider and decide whether<br />

or not such work should cont<strong>in</strong>ue dur<strong>in</strong>g arbitration proceed<strong>in</strong>gs.<br />

50.3 (a)<br />

(i) In cases where the total value of all claims <strong>in</strong> question added together does<br />

not exceed Rs.10,00,000/- (Rupees Ten Lakhs only), the Arbitral Tribunal<br />

consist of a sole arbitrator who shall be either the General Manager or a<br />

gazetted officer of Rail not below the grade of JA Grade nom<strong>in</strong>ated by the<br />

General Manager <strong>in</strong> that behalf. The sole arbitrator shall be appo<strong>in</strong>ted with<strong>in</strong><br />

60 days from the day when a written and valid demand for arbitration is received<br />

by Railway.<br />

(ii) In cases not covered by clause 50.3(a)(i), the Arbitral Tribunal shall<br />

consist of a panel of three Gazetted Railway Officers not below JA Grade, as<br />

the arbitrators. For this purpose, the Railway will send a panel of more than 3<br />

names of Gazetted Railway Officers of one or more departments, of the<br />

Railway to the contractor who will be asked to suggest to General Manager upto<br />

2 names out of the panel for appo<strong>in</strong>tments as contractor's nom<strong>in</strong>ee. The<br />

General Manager shall appo<strong>in</strong>t at least one out of them as the contractor's<br />

nom<strong>in</strong>ee and will, also simultaneously appo<strong>in</strong>t the balance number of<br />

arbitrators either from the panel or from outside the panel, duly <strong>in</strong>dicat<strong>in</strong>g the<br />

'Presid<strong>in</strong>g arbitrator from amongst the 3 arbitrators so appo<strong>in</strong>ted. While<br />

nom<strong>in</strong>at<strong>in</strong>g the arbitrators it will be necessary to ensure that one of them is from<br />

the Accounts department. An officer of Selection Grade of the Accounts<br />

department shall be considered of equal status to the officers <strong>in</strong> SA grade of<br />

other departments of the Railways for the purpose of appo<strong>in</strong>tment of arbitrators.<br />

80


iii) If one or more of the arbitrators appo<strong>in</strong>ted as above refuses to act as<br />

arbitrator, withdraws from his office as arbitrator, or vacates his/their<br />

office/offices or is/are unable or unwill<strong>in</strong>g to perform his functions as<br />

arbitrator for any reason whatsoever or dies or <strong>in</strong> the op<strong>in</strong>ion of the General<br />

Manager fails to act without undue delay, General Manager shall appo<strong>in</strong>t new<br />

arbitrator/arbitrators to act <strong>in</strong> his/their place <strong>in</strong> the same manner <strong>in</strong> which the<br />

earlier arbitrator/arbitrators had been appo<strong>in</strong>ted. Such re-constituted Tribunal<br />

may at its discretion, proceed with the reference from the stage at which it was<br />

left by the previous arbitrator(s).<br />

iv) The arbitral Tribunal shall have power to call for such evidence by way of<br />

affidavits or otherwise as the arbitral Tribunal shall th<strong>in</strong>k proper, and it shall be<br />

the duty of the parties hereto to do or cause to be done all such th<strong>in</strong>gs as may<br />

be necessary to enable the Arbitral Tribunal to make the award without any<br />

delay.<br />

v) While appo<strong>in</strong>t<strong>in</strong>g arbitrator(s) under Sub-clause (i), (ii) and (iii) above, due<br />

care shall be taken that he/they is/are not the one/those who had an opportunity<br />

to deal with the matters to which the contract relates or who <strong>in</strong> the course of<br />

his/their duties as Railway servant(s) expressed views on all or any of the matters<br />

under dispute or differences. The proceed<strong>in</strong>gs of the Arbitral Tribunal or the<br />

award made by such Tribunal will, however, not be <strong>in</strong>valid merely for the reason<br />

that one or more arbitrator had, <strong>in</strong> the course of his service, opportunity to deal<br />

with the matters to which the contract relates or who <strong>in</strong> the course of his/their<br />

duties expressed views on all or any of the matters under dispute.<br />

(b)<br />

(i) The arbitral award shall state <strong>in</strong> item-wise, the sum and reasons upon which it<br />

is based.<br />

(ii) A party may apply for corrections of any computational errors, any<br />

typographical or clerical errors or any other error of similar nature occur<strong>in</strong>g <strong>in</strong><br />

the award and <strong>in</strong>terpretation of a specific po<strong>in</strong>t of award to tribunal with<strong>in</strong> 30<br />

days of receipt of the award.<br />

(iii) A party may apply to tribunal with<strong>in</strong> 30 days of receipt of award to<br />

make on additional award as to claims presented <strong>in</strong> the arbitral proceed<strong>in</strong>gs<br />

but omitted from the arbitral award.<br />

50.4 In case of the Tribunal, compris<strong>in</strong>g of three Members, any rul<strong>in</strong>g or award shall<br />

be made by a majority of Members of Tribunal. In the absence of such a<br />

majority the views of the Presid<strong>in</strong>g Arbitrator shall prevail.<br />

50.5 Where the arbitral award is for the payment of money, no <strong>in</strong>terest shall be payable<br />

on whole or any part of the money for any period till the date on which the award<br />

<strong>in</strong> made.<br />

81


50.6 The cost of arbitration shall be Borne by the respective parties. The cost<br />

shall <strong>in</strong>ter-alia <strong>in</strong>clude fees of the arbitrator(s) as per the rates fixed by the<br />

Railway Adm<strong>in</strong>istration from time to time.<br />

50.7 Subject to the provisions of the aforesaid Arbitration and conciliation Act 1996<br />

and the rules there under and any statutory modification thereof shall apply to<br />

the arbitration proceed<strong>in</strong>gs under this clause.<br />

*****<br />

82


Section – II<br />

Chapter – 3<br />

Forms of Tenders etc.<br />

83


SECTION - II<br />

CHAPTER - 3<br />

FORMS OF TENDERS ETC.<br />

FORM NO. 1 : Offer letter.<br />

FORM NO. 2 : Not Applicable.<br />

FORM NO. 3 : Agreement.<br />

FORM NO. 4 : Guarantee Bond for Security Deposit.<br />

FORM NO. 5 : Statement of Deviations.<br />

FORM NO. 6 : Stand<strong>in</strong>g Indemnity Bond for on account<br />

Payments and Stores supplied by Rly.<br />

FORM NO. 7 : System Performance Guarantee.<br />

FORM NO. 8 : Bank Guarantee for Mobilisation Advance.<br />

FORM NO. 9 : Not Applicable<br />

FORM NO. 10 : Acknowledgement for receiv<strong>in</strong>g<br />

materials and Cable from Railways.<br />

FORM NO. 11 : Extension of period of completion on<br />

account of contractor.<br />

FORM NO. 12 : Extension of period of completion of<br />

work.<br />

FORM NO. 13 : Qualification Experience.<br />

FORM NO. 14 : Store Receipt Certificate.<br />

84


FORM-I<br />

Para-6.8 Chapter-I<br />

OFFER LETTER<br />

To<br />

The President of India,<br />

Act<strong>in</strong>g through Chief Adm<strong>in</strong>istrative Officer/IRPMU<br />

(or his successor),N C Railway,<br />

Shivaji Bridge(IRCOT Complex), New Delhi<br />

I/We ........................................................................ have read the various<br />

conditions to tender attached here to and hereby agree to abide by the said conditions.<br />

I/We also agree to keep this tender open for acceptance for a period of 180 days from the<br />

date fixed for open<strong>in</strong>g the same and <strong>in</strong> default thereof, I/We will be liable for forfeiture of<br />

my/our Earnest Money. I/We offer to do the work of Design, Supply, Installation and<br />

commission<strong>in</strong>g of IP DSLAM at various locations over Northern & North Central<br />

Railways and Central Organization of Railway Electrification at the rates quoted by<br />

me/us <strong>in</strong> the attached schedules and hereby b<strong>in</strong>d myself/ourselves to complete the work<br />

with<strong>in</strong> (-------- -------) months from the date `of issue of Letter of Acceptance of the<br />

tender. I/We also hereby agree to abide by the General and Special conditions of Contract<br />

and to carry out the work accord<strong>in</strong>g to the Specifications for materials and works laid<br />

down by the Railways for the present contract.<br />

A sum of Rs.________ herewith forwarded as “Earnest Money”. The full<br />

value of Earnest Money shall stand forfeited without prejudice to any other rights or<br />

remedies if,<br />

(a) I/We do not execute the contract documents with<strong>in</strong> 30 days after receipt of notice<br />

issued by the Railway that such documents are ready or,<br />

(b) I/We do not commence the work with<strong>in</strong> 10 days after receipt or orders to that<br />

effect.<br />

3. Until a formal agreement is prepared and executed the acceptance of this tender<br />

shall constitute a b<strong>in</strong>d<strong>in</strong>g contract between us subject to modifications, as may be<br />

mutually agreed to between us and <strong>in</strong>dicated <strong>in</strong> the “Letter of Acceptance” of my/our<br />

offer for this work.<br />

SIGNATURE OF CONTRACTOR(S)<br />

DATE :<br />

SIGNATURE OF WITNESS : CONTRACTOR(S) ADDRESS :<br />

1.............................................. .......................................................<br />

2.............................................. .......................................................<br />

85


FORM - 3<br />

Para-2/ Chapter-II<br />

AGREEMENT<br />

AN AGREEMENT made this ........................................................... day of<br />

....................................... Two Thousand .......................... between the President of India,<br />

act<strong>in</strong>g <strong>in</strong> the premises through the Chief Project Manager/IRPMU, North Central Railway<br />

or his successor ......................................... of the M<strong>in</strong>istry of Railways, Railway Board<br />

(here<strong>in</strong> after referred to as “the Railway”) of one part and Messers<br />

.................................................. (here<strong>in</strong> after referred to as “Contractor”) of the other part,<br />

a .......................... Firm (Status of the firm) be<strong>in</strong>g represented by .....................................<br />

(Name & Designation of the proprietor <strong>in</strong> case of sole proprietorship bus<strong>in</strong>ess or all the<br />

names and particulars <strong>in</strong> case of partnership firm etc.)<br />

Whereas <strong>in</strong> response to a call for Design, Supply, Installation and commission<strong>in</strong>g of<br />

IP DSLAM at various locations over Northern & North Central Railways and Central<br />

Organization of Railway Electrification as per tender papers at Annexure-A hereto the<br />

Contractor has submitted a tender as per Annexure-B hereto and whereas the said Tender<br />

of the Contractor has been accepted for .................. as per copy of Letter of Acceptance<br />

of Tender No..................................... dated ................... complete with enclosures at the<br />

accepted rates and agreed deviations from Tender Papers<br />

..................................................... as per Annexure-C hereto and at an estimated contract<br />

value of Rs...................... (Rupees ............................................................ only).<br />

Now this agreement witnesses that <strong>in</strong> consideration of the premises and the<br />

payment to be made by the purchaser to the contractor provided for here<strong>in</strong> below the<br />

Contractor shall supply all equipment and materials and execute and perform all works<br />

for which the said Tender of the Contractor has been accepted strictly accord<strong>in</strong>g to the<br />

various provisions <strong>in</strong> Annexure-B and C hereto and upon such supply, execute and<br />

perform to the satisfaction of the purchaser and the purchaser shall pay to the Contractor<br />

at the rates accepted as per the said Annexure-C and <strong>in</strong> terms of provisions there<strong>in</strong>. In<br />

case if the Contractor is not a company <strong>in</strong>corporated under the Companies Act, 1956, the<br />

expression “Contractor” shall unless otherwise excluded by or repugnant to the subject or<br />

context mean and <strong>in</strong>clude each of the successors- <strong>in</strong>- <strong>in</strong>terest, agents, nom<strong>in</strong>ees, servants,<br />

beneficiaries etc. If it is a Sole Proprietorship bus<strong>in</strong>ess, <strong>in</strong> addition to this, such<br />

expression Contractor will also <strong>in</strong>clude, each of his heirs, executors, and legal<br />

representatives.<br />

In the witness where of the parties have hereunto set and subscribed their<br />

respective hands and/or seals day and year respectively mentioned aga<strong>in</strong>st their<br />

respective signature.<br />

Signed and delivered at .................................................................... by Shri<br />

..................................................... for and on behalf of Messers<br />

....................................................................... the Contractor with<strong>in</strong> named <strong>in</strong> the presence<br />

of :-<br />

1. Signature :<br />

86


Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address :<br />

2. Signature :<br />

Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address :<br />

Signed and delivered at ............................................... for and on behalf of the<br />

President of India by Shri .......................................................... (General Manager or his<br />

successor) .............................................. Railway .................................. M<strong>in</strong>istry of<br />

Railways (Railway Board) <strong>in</strong> the presence of :-<br />

1. Signature :<br />

Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address :<br />

2. Signature :<br />

Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address :<br />

Annexure -A<br />

Annexure -B<br />

Annexure -C<br />

: Tender Paper No.<br />

: Firm’s Tender No.<br />

: Letter of Acceptance of Tender<br />

Complete with enclosures.<br />

_________________________<br />

(Signature)<br />

Dated:<br />

87


GUARANTEE BOND FOR SECURITY DEPOSIT<br />

(On Stamp Paper of Appropriate value)<br />

(To be used by approved Scheduled Banks)<br />

FORM-4<br />

Para-1/Chapter-II<br />

In consideration of the President of India (here<strong>in</strong>after called “the Government”) hav<strong>in</strong>g<br />

agreed to exempt .................................................... (here<strong>in</strong>after called “The said<br />

contractor(s)”) from the demand, under the terms and conditions of an agreement<br />

No........................................... dated .................... made between .............................. and<br />

.................... for ............................................................. (here<strong>in</strong> after called “the said<br />

agreement”) of Security Deposit for the due fulfillment by the said contractor(s) of the<br />

terms and conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement, or production of a Bank Guarantee<br />

for Rs............. (Rupees ....................................... only), we<br />

...............................................................<br />

(<strong>in</strong>dicate the name of Bank) (here<strong>in</strong>after referred to as<br />

‘the Bank”) at the request of ................................. Contractor(s) do hereby undertake to<br />

pay to the Government an amount not exceed<strong>in</strong>g Rs............................ aga<strong>in</strong>st any loss or<br />

damage caused to or suffered or would be caused to or suffered by the Government by<br />

reason of any breach by the said Contractor(s) of any of the terms or conditions conta<strong>in</strong>ed<br />

<strong>in</strong> the said Agreement.<br />

2. We ...................................................................... Bank do hereby undertake to pay<br />

the amounts due and payable under this Guarantee without any demur, merely on demand<br />

from the Government stat<strong>in</strong>g the amount is claimed is due by way of loss or damage<br />

caused to or would be caused to or suffered by the Government by reason of breach by<br />

the said Contractor(s) of any of terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement or<br />

by reason of the Contractor(s) failure to perform the said Agreement. Any such demand<br />

made on the Bank shall be conclusive as regards the amount due and payable by the Bank<br />

under this guarantee. However, our liability under this guarantee shall be restricted to an<br />

amount not exceed<strong>in</strong>g Rs...............................<br />

3. We .................................................................... bank undertake to pay to the<br />

Government any money so demanded notwithstand<strong>in</strong>g any dispute or disputes raised by<br />

the Contractor(s)/Supplier(s) <strong>in</strong> any suit or proceed<strong>in</strong>gs pend<strong>in</strong>g before any court or<br />

Tribunal relat<strong>in</strong>g thereto our liability under this present be<strong>in</strong>g absolute and unequivocal.<br />

The payment so made by us under this Bond shall be a valid discharge of our<br />

liability for payment there under and the Contractor(s)/ Supplier(s) shall have no claim<br />

aga<strong>in</strong>st us for mak<strong>in</strong>g such payment.<br />

4. We ........................................................... Bank further agree that the Guarantee<br />

here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong> full force and effect dur<strong>in</strong>g the period that would<br />

be taken for the performance of the said Agreement and that it shall cont<strong>in</strong>ue to be<br />

enforceable till all the dues of the Government under or by virtue of the said<br />

88


agreement have been fully paid and its claims satisfied or discharged or till<br />

.................... office/ department) M<strong>in</strong>istry of<br />

........................... certifies that the terms and conditions of the said agreement have<br />

been fully and properly carried out by the said contractor(s) and accord<strong>in</strong>gly<br />

discharges this Guarantee. Unless a demand or claim under the Guarantee is made<br />

on us <strong>in</strong> writ<strong>in</strong>g on or before the ................................. we shall be discharged from<br />

all liability under this Guarantee thereafter.<br />

5. We ................................................................................ further agree with<br />

(Indicate the name of bank)<br />

the Government that the Government shall have the fullest liberty without affect<strong>in</strong>g <strong>in</strong><br />

any manner our obligations hereunder to vary any of the terms and conditions of the<br />

Agreement or to extend time of performance by the said Contractor(s) from time to time<br />

or to postpone for any time or from time to time any of the powers exercisable by the<br />

Government aga<strong>in</strong>st the said Contractor(s) and to forebear or enforce any other terms and<br />

conditions relat<strong>in</strong>g to the said Agreement and we shall not be relieved from our liability<br />

by reason of any such variation, or extension to the said Contractor(s) or for any<br />

forbearance, act or omission on the part of Government or any <strong>in</strong>dulgence by the<br />

Government to the said Contractor(s) or by any such matter or th<strong>in</strong>g whatsoever which<br />

under the law relat<strong>in</strong>g to sureties would but for this provision, have no effect of so<br />

reliev<strong>in</strong>g us. We, further agree to acknowledge Governments right to extend time of<br />

performance of the Contractor from time to time and <strong>in</strong> case the guarantee extends<br />

beyond the period as <strong>in</strong>dicated here<strong>in</strong>, the Government shall have the right to a fresh<br />

guarantee bond for the extended period.<br />

6. This Guarantee will not be discharged due to the change <strong>in</strong> the Constitution of the<br />

Bank or the Contractor(s)/Supplier(s).<br />

7. We ...................................................... lastly undertake not to revoke this<br />

(Indicate the name of bank)<br />

Guarantee dur<strong>in</strong>g its currency except with the previous consent of the Government <strong>in</strong><br />

writ<strong>in</strong>g.<br />

Dated the .......................... day of ..................200 for<br />

......................................................................................<br />

(Indicate the name of the bank)<br />

89


FORM-5<br />

Para-6.8/Chapter-I<br />

STATEMENT OF DEVIATIONS<br />

PROFORMA FOR STATEMENT OF DEVIATIONS<br />

1. The follow<strong>in</strong>g are the particulars of deviations from requirement of the<br />

<strong>in</strong>structions to Tenderers, General Conditions of contract.<br />

1.1 Instructions to Tenderers & Condition of Tender<strong>in</strong>g<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

1.2 General Conditions of Contract<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

1.3 Special Conditions of Contract<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

2. The follow<strong>in</strong>g are the particulars of deviations from requirement of the technical<br />

specifications :<br />

( Separate Statement for each specification)<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

Note : Where there is no deviation, the statement should be returned duly<br />

signed with an endorsement <strong>in</strong>dicat<strong>in</strong>g no deviations.<br />

90


FORM-6<br />

Para-8.2/Chapter-II<br />

STANDING INDEMNITY BOND<br />

(FOR ON ACCOUNT PAYMENTS & STORES SUPPLIED BY<br />

RLYS.)<br />

(On Stamp paper of Requisite Value)<br />

We, M/s............................................................. hereby undertake that we hold at<br />

our stores Depot/s at ................................................ for and on behalf of the President of<br />

India <strong>in</strong> the premises through the General Manager or his successor, North Central<br />

Railway (here<strong>in</strong> after referred to as “the Purchaser”) all materials for which “On<br />

Account” payments have been made to us aga<strong>in</strong>st the contract for Design, Supply,<br />

Installation and commission<strong>in</strong>g of IP DSLAM at various locations over Northern & North Central<br />

Railways and Central Organization of Railway Electrification vide letter of Acceptance of<br />

Tender No....................................... dated ................ and the materials handed over to us<br />

by the purchaser for the purpose of execution of the said Contract, until such time the<br />

materials are duly erected or otherwise handed over to him.<br />

We shall be entirely responsible for the site custody and protection of the said<br />

materials aga<strong>in</strong>st all risk till they are duly delivered as erected equipment to the purchaser<br />

or as he may direct otherwise and shall <strong>in</strong>demnify the Purchaser aga<strong>in</strong>st any loss, damage<br />

or deterioration what so ever <strong>in</strong> respect of the said materials while <strong>in</strong> our possession and<br />

aga<strong>in</strong>st disposal of surplus materials. The said materials shall at all times be open to<br />

<strong>in</strong>spection by any Officer authorized by the Chief Adm<strong>in</strong>istrative Officer/IRPMU, N C<br />

Railway, Shivaji Bridge, NewDelhi.<br />

Should any loss, damage or deterioration of materials occur or surplus materials<br />

disposed off and refund becomes due, the purchaser shall be entitled to recover from us<br />

the full cost as per prices <strong>in</strong>cluded <strong>in</strong> the Contract (as applicable) and also<br />

compensation for such loss or damage if any along with<br />

the amount to be refunded without prejudice to any other remedies available to him by<br />

deduction from any sum due or any sum which at any time hereafter becomes due to us<br />

under the said or any other Contract.<br />

Dated this ...................... day of ........................, 200<br />

Signature of Witness :<br />

Name of Witness <strong>in</strong> block letters :<br />

Address :<br />

for and on behalf of<br />

Messers ........................................ (Contractor)<br />

91


FORM-7<br />

Para-22.2/Chapter-I<br />

SYSTEM PERFORMANCE GUARANTEE<br />

PROFORMA FOR THE SYSTEM PERFORMANCE GUARANTEE<br />

To<br />

The President of India,<br />

I/We........................................................................................ hereby<br />

guarantee that the design on the basis of which we have submitted our<br />

Tender No................................................. has been carefully made to<br />

conform to the end objectives <strong>in</strong> the tender documents and to technical<br />

specification there<strong>in</strong>. We further guarantee that <strong>in</strong> the event of the<br />

performance of the system, when <strong>in</strong>stalled, not comply<strong>in</strong>g with the end<br />

objectives or with the specifications conta<strong>in</strong>ed <strong>in</strong> the tender documents, we<br />

shall provide further <strong>in</strong>puts to enable the Railways to realise the end<br />

objectives conta<strong>in</strong>ed <strong>in</strong> these documents without any additional payment for<br />

any additional equipment which may be required <strong>in</strong> this regard. We further<br />

guarantee that all the expenses <strong>in</strong>clud<strong>in</strong>g the expenses <strong>in</strong>curred <strong>in</strong> India for<br />

provid<strong>in</strong>g the additional <strong>in</strong>puts under the System guarantee will be borne by<br />

us. We further guarantee that these additional <strong>in</strong>puts will be provided by us<br />

to make the system workable with<strong>in</strong> 8 months from the date on which this<br />

guarantee is <strong>in</strong>voked by the Purchaser.<br />

Seal :<br />

( Signature of firm’s authorised Officer)<br />

Signature of Witness :<br />

1..................................................<br />

2.................................................<br />

92


FORM-8<br />

Para-46/Chapter-II<br />

PROFORMA OF BANK GUARANTEE FOR MOBILISATION<br />

ADVANCE<br />

(On Stamp Paper of requisite value)<br />

(To be used by approved Scheduled Banks)<br />

1. In consideration of the President of India (here<strong>in</strong>after called “the Government”)<br />

hav<strong>in</strong>g agreed to exempt ...................................................... {here<strong>in</strong>after called “the said<br />

Contractor(s)”} from the demand, under the terms and conditions of an Agreement<br />

No.......................................... dated ............... made between ........................................<br />

and ......................................... for ......................................................... (here<strong>in</strong>after called<br />

“the said Agreement”) of Mobilisation advance payment for the due fulfillment by the<br />

said Contractor(s) of the terms and conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement, or<br />

production of a Bank Guarantee for Rs..................... (Rupees............................. only).<br />

We, ...................................................................................... here<strong>in</strong>after<br />

(<strong>in</strong>dicate the name of the Bank)<br />

referred to as “the Bank”) at the request of ........................................ Contractor(s) do<br />

hereby undertake to pay Rs................................. aga<strong>in</strong>st any loss or damage caused to or<br />

suffered or would be caused to or suffered by the Government by reason of any breach by<br />

the said Contractor(s) of any of the terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement.<br />

2. We, ...................................................................... Bank do hereby undertake to pay<br />

the amounts due and payable under this Guarantee without any demur, merely on demand<br />

from the Government stat<strong>in</strong>g that the amount is claimed is due by way of loss or damage<br />

caused to or would be caused to or suffered by the Government by reason of breach by<br />

the said Contractor(s) of any of terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement or<br />

by reason of the Contractor(s) failure to perform the said Agreement. Any such demand<br />

made on the Bank shall be conclusive as regards the amount due and payable by the Bank<br />

shall be conclusive as regards the amount due and payable by the Bank under this<br />

guarantee. However, our liability under this guarantee shall be restricted to an amount<br />

not exceed<strong>in</strong>g Rs...................................<br />

3. We, .......................................................... bank undertake to pay to the<br />

Government any money so demanded not withstand<strong>in</strong>g any dispute or disputes raised by<br />

the Contractor(s)/Supplier(s) <strong>in</strong> any suit or proceed<strong>in</strong>gs pend<strong>in</strong>g before any Court or<br />

Tribunal relat<strong>in</strong>g thereto our liability under this present be<strong>in</strong>g, absolute and unequivocal.<br />

The payment so made by us under this Bond shall be a valid discharge of our liability for<br />

payment there under and the Contractor(s)/Supplier(s) shall have no claim aga<strong>in</strong>st us for<br />

mak<strong>in</strong>g such payment.<br />

93


4. We, ............................................................. Bank further agree that the Guarantee<br />

here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong> full force and effect dur<strong>in</strong>g the period that would<br />

be taken for the performance of the said Agreement and that it shall cont<strong>in</strong>ue to be<br />

enforceable till all the dues of the Government under or by virtue of the said<br />

Agreement have been fully paid and its claims satisfied or discharged or till<br />

....................... office/Department) M<strong>in</strong>istry of ......................... certifies that the<br />

terms and conditions of the said Agreement have been fully and properly carried<br />

out by the said Contractor(s) and accord<strong>in</strong>gly discharges this Guarantee. Unless a<br />

demand or claim under the Guarantee is made on us <strong>in</strong> writ<strong>in</strong>g on or before the<br />

.............. (1) ................................. we shall be discharged from all liability under<br />

this Guarantee thereafter.<br />

5. We, ............................................................................ further agree with<br />

(<strong>in</strong>dicate the name of Bank)<br />

the Government that the Government shall have the fullest liberty without our consent<br />

and without affect<strong>in</strong>g <strong>in</strong> any manner our obligations hereunder to vary any of the terms<br />

and conditions of the Agreement or to extend time of performance by the said<br />

Contractor(s) from time to time or to postpone for any time or from time to time any of<br />

the powers exercisable by the Government aga<strong>in</strong>st the said Contractor(s) and to forbear<br />

or enforce any of the terms and conditions relat<strong>in</strong>g to the said Agreement and we shall<br />

not be relieved from our liability by reason of any such variation, or extension to the said<br />

Contractor(s) or for any forbearance, act or omission on the part of Government or any<br />

<strong>in</strong>dulgence by the Government to the said Contractor(s) or by any such matter or th<strong>in</strong>g<br />

whatsoever which under the law relat<strong>in</strong>g to sureties would, but for this provision, have<br />

affect of so reliev<strong>in</strong>g us.<br />

6. This Guarantee will not be discharged due to the change <strong>in</strong> the Constitution of the<br />

Bank or the Contractor(s)/Supplier(s).<br />

7. We, .......................................................... lastly undertake not to revoke<br />

(<strong>in</strong>dicate the name of Bank)<br />

this Guarantee dur<strong>in</strong>g its currency except with the previous consent of the Government <strong>in</strong><br />

writ<strong>in</strong>g.<br />

Dated the ......................... day of .................. 200<br />

for ..................................................................<br />

(<strong>in</strong>dicate the name of the Bank)<br />

Witness<br />

1 Signature ...........................................<br />

Name ...........................................<br />

2 Signature ...........................................<br />

Name ...........................................<br />

NOTE : (1) The guarantee shall be valid for a period of two months after<br />

the expiry of the currency of the contract.<br />

94


FORM-10<br />

Para-8.3/Chapter-II<br />

ACKNOWLEDGEMENT<br />

FOR RECEIVING MATERIALS FROM RAILWAY<br />

STATION :<br />

DATE :<br />

Sub: - Receipt of Materials from Railway.<br />

It is hereby acknowledged that the follow<strong>in</strong>g material as detailed have<br />

been received <strong>in</strong> full and good condition by me on .............<br />

........................... at ........................ for the work com<strong>in</strong>g under the<br />

Agreement No.............................. dated ................<br />

----------------------------------------------------------------------------------------<br />

Sl.No. Description of Material Quantity Remarks<br />

if any<br />

----------------------------------------------------------------------------------------<br />

----------------------------------------------------------------------------------------<br />

Witnessed by: -<br />

-------------------------------- ------------------------------------<br />

(Signature of Purchaser’s<br />

(Signature of Contractor or<br />

Representative with<br />

Contractor’s Representative)<br />

Designation )<br />

95


EXTENSION OF PERIOD OF COMPLETION OF WORK<br />

ON CONTRACTOR’S ACCOUNT<br />

FORM-11<br />

Para-35/Chapter-II<br />

No. Date :<br />

(Regd. With A/D)<br />

To<br />

.............................................<br />

.............................................<br />

Sub : (i) ................................................. (Name of Work)<br />

(ii)Acceptance Letter No. ....................................................<br />

(iii) Undertak<strong>in</strong>g /Agreement No. .......................................<br />

Ref : ......................... (Quote specific application of the Contractor for extension to<br />

date, if received).<br />

Dear Sir,<br />

The stipulated date for completion of the work mentioned above is/was ............... .<br />

However, the work is/was not completed on this date.<br />

Expect<strong>in</strong>g that you may be able to complete the work if some time is given and <strong>in</strong><br />

consideration of your Letter No.............................., the General Manager (or his successor) on<br />

behalf of the president of India, although not bound to do so, hereby extends the time for<br />

completion from ............. to ..............<br />

Please note that liquidated damages @1/2% per week or part thereof of the entire contract<br />

value will be recovered for delay <strong>in</strong> the completion of the work after the expiry of (1)<br />

....................... from you as mentioned <strong>in</strong> para 35 of the Special Conditions of Contract for the<br />

extended period.<br />

The above extension of the completion date will also be subject to the further condition<br />

that no <strong>in</strong>crease <strong>in</strong> rates on any account will be payable to you.<br />

Please note that <strong>in</strong> the event of decl<strong>in</strong><strong>in</strong>g to accept the extension on the above said<br />

conditions or <strong>in</strong> the event of your failure after accept<strong>in</strong>g or act<strong>in</strong>g up to this extension to complete<br />

the work by (2)....................... (here mention the extended date), further action will be taken <strong>in</strong><br />

terms of relevant para of Conditions of Contract.<br />

Your’s faithfully,<br />

for & on behalf of President of India.<br />

Note :-<br />

1. Give here the stipulated date for completion without any penalty fixed earlier.<br />

2. Here mention the extended date.<br />

96


EXTENSION OF PERIOD OF COMPLETION OF WORK<br />

No. Date :<br />

To<br />

..................................<br />

..................................<br />

..................................<br />

Dear Sirs,<br />

Sub : (i) ............................................ (Name of work)<br />

(ii) Acceptance Letter No.........................................<br />

(iii) Undertak<strong>in</strong>g/Agreement No...............................<br />

Ref : .......................... (quote specific application of the<br />

Contractor for extension to the date, if received) .<br />

FORM-12<br />

Para-36/Chapter-II<br />

The stipulated date for completion of subject work under the above contract was<br />

............................ In consideration of the Contractor’s Letter No..............................., The<br />

General Manager (or his successor) behalf of the President of India, is pleased to grant<br />

extension of the time for completion of works without liquidated damages under para 36<br />

of Chapter II , Section II of the contract as mentioned below :<br />

“...................................................................................”<br />

It may be noted that unless repugnant to the context, all the terms and<br />

conditions of the Contract will rema<strong>in</strong> unaltered dur<strong>in</strong>g the extended period from<br />

...................... to ...................... also, and further no <strong>in</strong>creased additional rates and claims<br />

of recoveries which have not been already envisaged <strong>in</strong> terms of the conditions of the<br />

Contract will be leviable either by you or by the purchaser <strong>in</strong> respect of this extended<br />

period.<br />

Your’s faithfully,<br />

( )<br />

for and on behalf of President of India<br />

97


FORM-13<br />

QUALIFICATION EXPERIENCE<br />

List of Works completed<br />

Description<br />

of Work<br />

Organisation<br />

for whom<br />

executed<br />

Approx.<br />

value of<br />

contract<br />

at the<br />

time of<br />

award<br />

Date<br />

of<br />

award<br />

Date of<br />

scheduled<br />

completion<br />

of work<br />

Date of actual<br />

Start<br />

Completion<br />

F<strong>in</strong>al<br />

value of<br />

contract<br />

List of Works <strong>in</strong> Hand<br />

Description<br />

of work<br />

Contract<br />

Value<br />

Approx. value of balance<br />

work yet to be done<br />

Date of award<br />

98


FORM-14<br />

RECEIPT CERTIFICATE (FOR SUPPLY ONLY)<br />

From: Sr.Section Eng<strong>in</strong>eer/Section Eng<strong>in</strong>eer(Signal/Telecom)/<br />

North Central Railway,<br />

No. Date :<br />

1 Contract No<br />

2 Name of Work<br />

3 Item No. As <strong>in</strong> Rate Schedule<br />

4 Description of Item.<br />

5 Material <strong>in</strong>spected by :<br />

6 Despatch particular & date<br />

7 Qty as per despatch particular<br />

8 Qty received<br />

9 Qty short received<br />

10 Condition of Stores Received<br />

11 Name of Firm & Address<br />

12 Place of receipt<br />

13 Date of receipt<br />

14 Ledger No.<br />

15 Name & designation of Stores<br />

In-charge<br />

--------------------------------------<br />

Signature of Stores-<strong>in</strong>-Charge<br />

99


Section – III<br />

Technical Specification<br />

100


Section – III<br />

TECHNICAL SPECIFICATION<br />

INDEX<br />

Chapter – 1<br />

Chapter – 2<br />

Chapter – 3<br />

Chapter – 4<br />

Chapter – 5<br />

Chapter – 6<br />

Chapter – 7<br />

Chapter – 8<br />

Chapter – 9<br />

Technical Overview<br />

Equipment Requirement & Configuration<br />

Technical Specifications of IP DSLAM<br />

Technical Specifications of NMS / EMS<br />

IP DSLAM Equipment Characteristics<br />

Technical Specifications of ADSL Modem<br />

Technical Specifications of Router<br />

Technical Specifications of Layer – 3 Switch<br />

Technical Specifications of ADSL L<strong>in</strong>e Tester<br />

101


Section – III<br />

Chapter – 1<br />

Technical Overview<br />

102


IP-Based Digital Subscriber L<strong>in</strong>e Access Multiplexer (IP-DSLAM)<br />

1. Introduction<br />

This specification covers the requirements of IP-DSLAM Equipment to be<br />

supplied to Railways for provid<strong>in</strong>g data and voice services to their employees<br />

across Country.<br />

The IP Digital Subscriber L<strong>in</strong>e Access Multiplexer Equipment here<strong>in</strong> after<br />

referred to as “IP-DSLAM” shall comply with the technical specification set forth<br />

here<strong>in</strong> and shall comply with the latest relevant ITU-T and other recognized<br />

standards.<br />

The equipment shall be of modern design, proven capability, high-demonstrated<br />

reliability and low power consumption. All the equipment offered shall be those<br />

which adopt the latest and highest grade technique and be stable <strong>in</strong> operation for a<br />

long cont<strong>in</strong>uous period of time.<br />

The detailed <strong>in</strong>formation of the requirement is provided <strong>in</strong> this technical<br />

Requirement document.<br />

103


Section – III<br />

Chapter – 2<br />

Equipment Requirement &<br />

Configuration<br />

104


Equipment Requirement and Configuration<br />

2. Equipment Requirement and Configuration<br />

A Typical environment of the network is depicted below keep<strong>in</strong>g today’s and<br />

future growth <strong>in</strong> m<strong>in</strong>d.<br />

Proposed equipments (IP DSLAM) must support real time application like video services, video<br />

on demand, video conferenc<strong>in</strong>g, VoIP etc through guaranteed end to end QoS.<br />

2.1 Configuration of IP-DSLAM<br />

2.1.1 Type 1 Configuration: 528 ports of ADSL 2+<br />

The equipment proposed has to have m<strong>in</strong>imum 528 ports of ADSL 2+ expandable<br />

upto 640 ports, currently equipped with 528 ports <strong>in</strong> a s<strong>in</strong>gle chassis<br />

configuration. The equipment must comply to the specifications detailed <strong>in</strong> the<br />

specifications chapter.<br />

2.1.2 Type 2 Configuration: 192 ports of ADSL 2+<br />

The equipment proposed has to have m<strong>in</strong>imum 192 ports of ADSL2+ <strong>in</strong> a s<strong>in</strong>gle<br />

chassis expandable upto 256 ports <strong>in</strong> a s<strong>in</strong>gle system configuration, currently<br />

equipped with 192 ports. The equipment must comply to the specifications<br />

detailed <strong>in</strong> the specifications chapter.<br />

105


Section – III<br />

Chapter – 3<br />

Technical Specifications of<br />

IP DSLAM<br />

106


Technical Specification of IP-DSLAM<br />

3.1 DSLAM Specification<br />

IP-DSLAM with m<strong>in</strong>imum 2 slots for management and switch cards, One Alarm Panel,<br />

Two slots for DC power <strong>in</strong>put and filter (Hot-swappable), or distributed power supply,<br />

One slot for fan and dust filter module, sensors for voltage, temperature and FAN speed,<br />

thermal cutoff protection mechanism (If temperature is over the threshold), MSC with<br />

redundancy feature (failover switch time less than 1 second). Proposed IP DSLAM must<br />

have m<strong>in</strong>imum 10G backplane capacity. The DSLAM should have multiservice access<br />

capability so that any future services can be planned by Railways from time to time,<br />

without chang<strong>in</strong>g the equipment configuration. The services can be of Voice, Video or<br />

data like VoIP, IP-TV etc. The equipment proposed should be of Indoor and outdoor type<br />

as well. The equipment with smaller footpr<strong>in</strong>t and compact <strong>in</strong> size will be preferred.<br />

3.1.1 The proposed IP-DSLAM shall have the capability to provide, at least, the<br />

follow<strong>in</strong>g Subscriber <strong>in</strong>terfaces for;<br />

3.1.1.1 Pla<strong>in</strong> Old Telephone Services (POTS)<br />

3.1.1.2 ISDN BRI, ISDNoIP<br />

3.1.1.3 ADSL/ADSL2/ADSL2+: G.992.1 Annex A, G.992.3 Annex A, G.992.5<br />

Annex A<br />

3.1.1.4 SHDSL (2 wire/4 wire): G.991.2, G.991.2.bis<br />

3.1.1.5 Fast Ethernet Ports<br />

3.1.1.6 Gigabit Upl<strong>in</strong>k Ports (Optical 10Km. / Electrical)<br />

This is keep<strong>in</strong>g <strong>in</strong> m<strong>in</strong>d future technology up-gradation requirement, if required <strong>in</strong> the IP<br />

DSLAM without any additional hardware cost other then module.<br />

107


3.1.2 The proposed IP-DSLAM shall be able to adapt to the chang<strong>in</strong>g requirements of<br />

an <strong>in</strong>dividual user <strong>in</strong> term of capacity, flexibility, and types of service offered<br />

without any additional requirements or equipment.<br />

3.1.3 The proposed IP DSLAM provided with Equipment protection and<br />

redundancy feature<br />

3.1.3.1 Common control unit (Redundant 1+1)<br />

3.1.3.2 Network <strong>in</strong>terface unit (HOT Swappable)<br />

3.1.3.3 VoIP Protocol Process Unit (Redundant 1+1)<br />

3.1.3.4 Power supply unit (Redundant 1+1 or Distributed power supply)<br />

3.1.3.5 The protection cards for the above units shall be hot swappable.<br />

3.1.3.6 In case where ventilat<strong>in</strong>g system of heat of the proposed equipment is fan<br />

type, the equipment shall support redundancy system, pluggable for<br />

ma<strong>in</strong>tenance and repair with temperature control and alarm functions.<br />

3.1.4 The proposed IP-DSLAM shall support at least po<strong>in</strong>t to po<strong>in</strong>t, cha<strong>in</strong>, r<strong>in</strong>g<br />

topologies and mixed topology. In case where r<strong>in</strong>g topology is used, IP-<br />

DSLAM must have r<strong>in</strong>g protection mechanisms that can switchover. The<br />

R<strong>in</strong>g topology is used to guarantee the network be<strong>in</strong>g normal even if one<br />

l<strong>in</strong>k between two devices is broken. So, <strong>in</strong> the r<strong>in</strong>g topology, the network<br />

will work well if one l<strong>in</strong>k is broken. In the R<strong>in</strong>g Topology, DSLAM<br />

should support RSTP.<br />

3.1.5 ISDN Interface- Basic rate and Primary rate ISDN shall comply with<br />

relevant ITU-T Standard.<br />

3.1.6 The IP-DSLAM shall support at least the follow<strong>in</strong>g VoIP features:<br />

3.1.6.1 Voice Activity Detection<br />

3.1.6.2 Comfort Noise Generation<br />

3.1.6.3 Call Progress Tone Generation<br />

3.1.6.4 V.21 Fax Tone Detection<br />

3.1.6.5 V.23 FSK Caller ID Generation3.1.6.6 Bellcore FSK Caller ID<br />

3.1.6.7 DTMF Detection and Relay<br />

3.1.6.8 T.38 Fax Relay<br />

3.1.6.9 Jitter Elim<strong>in</strong>ation<br />

3.1.6.10 RTP Encapsulation<br />

3.1.6.11 Voice Codec – G.711U, G.711A, G.723, G.729<br />

3.1.6.12 H.248 and MGCP protocol<br />

3.1.6.13 ISDN over IP protocol accord<strong>in</strong>g to IUA protocol stack<br />

108


3.1.7 The proposed IP-DSLAM shall be capable of demonstrate of<br />

follow<strong>in</strong>g L2 (Bridg<strong>in</strong>g) Functionalities. It shall support follow<strong>in</strong>g<br />

protocols.<br />

3.1.7.1 LLC & VC MUX bridg<strong>in</strong>g (RFC2684) support<strong>in</strong>g bridg<strong>in</strong>g and rout<strong>in</strong>g<br />

mode (Static IP & DHCP)<br />

3.1.7.2 Max. MAC address per system: 8 K (NT’s MAC address table)<br />

3.1.7.3. Max. 128 MAC address per port support (LT bridge port limitation)<br />

3.1.7.4 802.1D transparent bridg<strong>in</strong>g<br />

3.1.7.5 802.1Q tag based VLAN<br />

3.1.7.6 802.1w rapid spann<strong>in</strong>g tree protocol for network <strong>in</strong>terface ports<br />

3.1.7.7 Auto MAC address learn<strong>in</strong>g<br />

3.1.7.8 MAC ag<strong>in</strong>g-out time<br />

3.1.7.9 SVL-like bridg<strong>in</strong>g<br />

3.1.7.10 Limit<strong>in</strong>g number of MAC per port (MAC count filter)<br />

3.1.7.11 Static MAC address filter<strong>in</strong>g (MAC address filter, both deny and accept)<br />

3.1.7.12 Static MAC-OUI filter<strong>in</strong>g (MAC OUI filter, both deny and accept)<br />

3.1.7.13 Port Isolation<br />

3.1.7.14 Port-based VLAN tagg<strong>in</strong>g on subtend<strong>in</strong>g network <strong>in</strong>terface port<br />

3.1.7.15 Broadcast storm control<br />

3.1.7.16 Protocol-based VLAN<br />

3.1.7.17 LACP<br />

3.1.8 ATM QoS allows regulat<strong>in</strong>g the average rate and fluctuations of data<br />

transmission. This helps to elim<strong>in</strong>ate congestion <strong>in</strong> order to allow<br />

transmission of real time data (such as audio and video). The proposed IP-<br />

DSLAM to be provided with QoS/ ATM Traffic Management<br />

functionalities. However these features related to ATM are desirable.<br />

3.1.8.1 4-level 802.1p priority queue to guarantee the m<strong>in</strong>imum bandwidth for<br />

each queue<br />

3.1.8.2 8 PVC per DSL port<br />

3.1.8.3 TM 4.0 peak cell rate traffic parameter<br />

3.1.8.4 Downstream traffic shap<strong>in</strong>g function per ATM PVC<br />

3.1.8.5 Support ATM F5 OAM cells for End-to-End Loop back test (ITU-T Rec.<br />

I.610)<br />

3.1.9 VLAN allows a physical network to be partitioned <strong>in</strong>to multiple logical<br />

networks. Stations on a logical network belong to one group called VLAN<br />

group. A station can belong to more than one group. The stations on the<br />

same VLAN group can communicate with each other. With VLAN, a<br />

station cannot directly talk to or hear from stations that are not <strong>in</strong> the same<br />

VLAN groups. The proposed IP-DSLAM shall support at least follow<strong>in</strong>g<br />

VLAN features.<br />

3.1.9.1 4094 IEEE 802.1Q compliant VLAN tagg<strong>in</strong>g<br />

3.1.9.2 VLAN stack<strong>in</strong>g (Q-<strong>in</strong>-Q)<br />

3.1.9.3 VLAN Bridge Function (multiple PVCs to one VLAN)(N:1)<br />

3.1.9.4 PVC and VLAN one to one mapp<strong>in</strong>g (1:1)<br />

109


3.1.9.5 VLAN Trunk<strong>in</strong>g (S<strong>in</strong>gle PVC jo<strong>in</strong> Multiple VLAN) (1: N)<br />

3.1.10 The proposed IP-DSLAM shall support at least follow<strong>in</strong>g Security<br />

3.1.10.1 Per Port (MAC address based security level to deny/ access to the Internet)<br />

and Per VLAN isolation.<br />

3.1.10.2 IEEE 802.1x port-based authentication is desired to prevent the<br />

unauthorized ports (clients) from ga<strong>in</strong><strong>in</strong>g access to the network.<br />

3.1.10.3 Rule-based packet filter<strong>in</strong>g (L2 ~ L4 ACL)<br />

3.1.10.4 DSLAM should have MAC count limit<strong>in</strong>g feature for the number of<br />

dynamic learned MAC addresses <strong>in</strong> the MAC table per port.<br />

3.1.10.5 DHCP broadcast filter<strong>in</strong>g<br />

3.1.10.6 VLAN aware DHCP snoop<strong>in</strong>g features required to adds VLAN<br />

<strong>in</strong>formation <strong>in</strong>to DHCP snoop<strong>in</strong>g table.<br />

3.1.10.7 ACL filter<strong>in</strong>g feature—Net BiOS should be supported by the DSLAM.<br />

3.1.10.8 IGMP filter<strong>in</strong>g<br />

3.1.10.9 Anti IP/MAC address spoof<strong>in</strong>g<br />

3.1.11 Follow<strong>in</strong>g Network Management method/ features should be<br />

supported by the IPDSLAM for end to end management.<br />

3.1.11.1 Local management through a craft term<strong>in</strong>al<br />

3.1.11.2 Web-based /GUI based Management Interface<br />

3.1.11.3 Cluster Management (Up to 8 cluster members) required for manag<strong>in</strong>g<br />

multiple DSLAM adm<strong>in</strong>istration with s<strong>in</strong>gle/master IP address.<br />

3.1.11.4 View-based Network Management<br />

3.1.11.5 In-band and out-of-band IP <strong>in</strong>terface for management<br />

3.1.11.6 SNMPv1/v2c agent/traps<br />

3.1.11.7 Standard MIBs report should be view for different l<strong>in</strong>e card<br />

3.1.11.7.1 2RFC 1213 MIB II<br />

3.1.11.7.2 ADSL L<strong>in</strong>e MIB (RFC2662)/Extension L<strong>in</strong>e MIB (RFC 3440)<br />

3.1.11.7.3 SHDSL L<strong>in</strong>e MIB (RFC 3276)<br />

3.1.11.7.4 VDSL l<strong>in</strong>e MIB (RF3728)<br />

3.1.11.7.5 Bridge MIB/Extension MIB<br />

3.1.11.7.6 RMON MIB (RFC 1757)<br />

3.1.11.7.7 Vendor specific MIBs, e.g.,Chassis Management MIB (Fan Speed,<br />

Voltage, Temperature) or its management through EMS<br />

3.1.12 The proposed IP-DSLAM shall have built-<strong>in</strong> Remote Subscriber L<strong>in</strong>e<br />

Test<strong>in</strong>g Function which is used to test subscriber l<strong>in</strong>es. This function shall<br />

be performed by the Network Management System/ EMS.<br />

At least the follow<strong>in</strong>g parameters for ADSL2+:<br />

3.1.12.1 Max Down speed<br />

3.1.12.2 Upstream possible on each DSL standard<br />

3.1.12.3 Copper Loop length (m)<br />

3.1.12.4 Loop Attenuation (dB)<br />

3.1.12.5 Mean noise level (dBm/Hz)<br />

110


3.1.13 Various methods/ options required <strong>in</strong> the proposed IP DSLAM for<br />

Management purpose<br />

3.1.13.1 Local console port<br />

3.1.13.2 Web-based/ GUI based configuration<br />

3.1.13.3 Telnet (share 4 Session)<br />

3.1.13.4 SNMP v1/v2 based EMS<br />

3.1.13.5 Should allow multiple adm<strong>in</strong>istrative accounts and 3 levels of access<br />

privileges (Low: read only/ Middle: read / write/ High: read / write / user<br />

management)<br />

3.1.14 The proposed IP DSLAM should have follow<strong>in</strong>g Management<br />

Function<br />

3.1.14.1 Alarm and Status Surveillance<br />

3.1.14.2 Fault management<br />

3.1.14.3 Configuration management<br />

3.1.14.4 Performance management<br />

3.1.15 Management Switch<strong>in</strong>g Card shall support the follow<strong>in</strong>g local<br />

management features<br />

3.1.15.1 General management function<br />

3.1.15.1.1 Handle def<strong>in</strong>ed alarm <strong>in</strong>put/output<br />

3.1.15.1.2 FAN module speed detection and alarm issue if necessary<br />

3.1.15.1.3 DC power <strong>in</strong>put A, B status detection and alarm issue if necessary<br />

subscriber l<strong>in</strong>e card plugg<strong>in</strong>g events detection<br />

3.1.15.1.4 Chassis type & ID detection<br />

3.1.15.2 FW features supported by the MSC <strong>in</strong> the proposed IP DSLAM<br />

3.1.15.2.1 MAC address mgmt<br />

3.1.15.2.2 CoS for backplane <strong>in</strong>terfaces and upl<strong>in</strong>k as well as subtend<strong>in</strong>g ports (SPQ<br />

& WRR support)<br />

3.1.15.2.3 IEEE 802.3x flow control<br />

3.1.15.2.4 Storm Control<br />

3.1.15.2.5 IEEEE 802.1s, IEEE 802.1d, IEEE 802.1w<br />

3.1.15.2.6 Support IEEE 802.1Q/1P<br />

3.1.15.2.7 Support untag and tag frames<br />

3.1.15.2.8 VLAN GVRP support<br />

3.1.15.2.9 IP multicast<strong>in</strong>g<br />

3.1.15.2.10 Port Trunk<strong>in</strong>g<br />

3.1.15.2.11 Port Security<br />

3.1.15.2.12 Packet Filter<strong>in</strong>g<br />

3.1.15.2.13 Traffic shap<strong>in</strong>g on subscriber port<br />

3.1.15.2.14 Redundant MSC mechanism<br />

3.1.15.2.15 LACP<br />

3.1.15.2.16 DiffServ Code Po<strong>in</strong>t (DSCP) to 802.1p priority mapp<strong>in</strong>g<br />

3.1.16 OAM&P features <strong>in</strong> the proposed IP DSLAM<br />

111


3.1.16.1 Firmware upgrade through FTP and serial console port should be<br />

supported <strong>in</strong> the IPDSLAM<br />

3.1.16.2 MAC entry displayed with VLAN ID <strong>in</strong>formation should be viewed<br />

3.1.16.3 CPU utilization status and alarm report for report generation<br />

3.1.16.4 Per-VLAN primary and secondary DHCP server sett<strong>in</strong>g<br />

3.1.16.5 Profile server<br />

3.1.16.6 Alarm severity assignment table should be viewed<br />

3.1.16.7 M<strong>in</strong>imum Profile Management required<br />

3.1.16.7.1 ADSL profile management<br />

3.1.16.7.2 ATM traffic profile management<br />

3.1.16.7.3I GMP filter<strong>in</strong>g profile management<br />

3.1.16.7.4 Alarm profile management with Threshold Cross<strong>in</strong>g Alarm management<br />

and alarm severity assignment and sett<strong>in</strong>g<br />

3.1.17 ALC/Filter<strong>in</strong>g features <strong>in</strong> the proposed IP DSLAM<br />

3.1.17.1 Frame filter<strong>in</strong>g, such as based on source MAC address, port etc.<br />

3.1.17.2 PPPoE filter<strong>in</strong>g<br />

3.1.17.3 Layer 3 filter<strong>in</strong>g based on IP header: source addresses, dest<strong>in</strong>ation<br />

addresses<br />

3.1.17.4 ARP broadcast filter<strong>in</strong>g<br />

3.1.17.5 ACL filter<strong>in</strong>g feature--NetBiOS should be supported by the DSLAM.<br />

3.1.17.6 DHCP broadcast filter<strong>in</strong>g<br />

3.1.17.7 IGMP filter<strong>in</strong>g<br />

3.1.17.8 MAC OUI Filter<strong>in</strong>g<br />

3.1.17.9 Advanced upstream ACL<br />

3.1.17.10 Rate limit<strong>in</strong>g features<br />

3.1.17.10.1 Rate limit<strong>in</strong>g per XDSL port<br />

3.1.17.10.2 Rate limit<strong>in</strong>g per XDSL VCRate limit<strong>in</strong>g per Ethernet port (MSC<br />

subtend<strong>in</strong>g port.<br />

3.1.17.10.3 Per-PVC upstream rate limit<strong>in</strong>g<br />

3.1.17.10.4 Block user’s multicast packets from subscribed user ports<br />

3.1.18 Multicast<strong>in</strong>g features <strong>in</strong> the proposed IP DSLAM<br />

3.1.18.1 IP multicast forward<strong>in</strong>g<br />

3.1.18.2 IGMPv1/v2 Proxy/snoop<strong>in</strong>g<br />

3.1.18.3 IGMP filter<strong>in</strong>g profile<br />

3.1.18.4 IGMP multicast channel limit<strong>in</strong>g (by count and bandwidth usage)<br />

3.1.18.5 Static multicast forward<strong>in</strong>g, All video group address are configured <strong>in</strong> the<br />

box.<br />

3.1.18.6 Number of zap / second per system > 30 zaps/s<br />

3.1.18.7 Expedite Leave (channel zapp<strong>in</strong>g time less than 250ms-target)<br />

3.1.18.8 At least 256 multicast group<br />

3.1.18.9 Multicast membership reports<br />

3.1.18.10 Discard unknown multicast traffic<br />

3.1.18.11 Track<strong>in</strong>g MAC address with IGMP<br />

3.1.18.12 Multicast VLAN (16 VLANs)<br />

3.1.18.13 Static Multicast Bandwidth Control<br />

112


3.1.18.14 Multicast VLAN<br />

3.1.19 Environmental Specifications<br />

3.1.19.1 Operat<strong>in</strong>g Temp 0 deg C to 50 deg C<br />

3.1.19.2 Storage Temp -40 deg C to 70 deg C<br />

3.1.19.3 Operat<strong>in</strong>g Humility 10 ~ 90% (non-condens<strong>in</strong>g)<br />

3.1.19.4 Storage Humility 10 ~ 95% (non-condens<strong>in</strong>g)<br />

3.1.19.5 Power Supply: -48V DC<br />

3.1.20 Certification<br />

3.1.20.1 K.20<br />

3.1.20.2 Safety Certificate<br />

3.1.20.2.1 EN60950-1<br />

3.1.20.2.2 CSA60950-1<br />

3.1.20.2.3 UL60950-1<br />

3.1.20.2.4 IEC60950-1<br />

3.1.20.3 EMC<br />

3.1.20.3.1 FCC Part 15 Class A<br />

3.1.20.3.2 EN55022 Class A<br />

3.1.20.3.3 EN55024 Class A<br />

3.1.20.3.4 ETSI 300 386<br />

3.2 Management / LINE CARD SPECIFICATIONS<br />

The proposed IP DSLAM should support different l<strong>in</strong>e card (ADSL2+,<br />

G.SHDSL, G.SHDSL.bis. VDSL, VOIP). Current requirement is for<br />

ADSL 2+ l<strong>in</strong>e card. Below are the specifications that the proposed IP<br />

DSLAM should support<br />

3.2.1 Hot swappable Management Switch Cards (MSC)/Failover-enabled<br />

Network Term<strong>in</strong>ation Card..<br />

DESCRIPTION:<br />

Fully Gigabit non-block<strong>in</strong>g backplane design for each slot, at least one<br />

Gigabit to each traffic slot. to solve traffic congestion problem, Supported<br />

by total four gigabit upl<strong>in</strong>k and subtend<strong>in</strong>g with port trunk<strong>in</strong>g features for<br />

friendly deployment <strong>in</strong> r<strong>in</strong>g or tree topology and Fully VLAN functions to<br />

segment the class of service, easy to manage with web, CLI, SNMP, and<br />

EMS, Hot swappable fan module with filter, two power modules for<br />

redundancy,<br />

3.2.2 Standard compliant<br />

3.2.2.1 IEEE 802.1p, 802.1Q<br />

3.2.2.2 IEEE 802.3u/3z/3x/3ab<br />

3.2.2.3 SFF committee INF-8074i Specification<br />

3.2.2.4 SFP (Small Form factor Pluggable) transceiver rev.1.0<br />

3.2.3 Switch Fabric<br />

3.2.3.1 Switch<strong>in</strong>g fabric capability: 20Gbps, non-block<strong>in</strong>g full duplex<br />

3.2.3.2 Support 8K MAC entries<br />

3.2.3.3 Support 4K VLAN entries<br />

113


3.2.3.4 Forward<strong>in</strong>g frame: 802.3, 802.1Q, Ethernet II frames<br />

3.2.3.5 PreveMSC forward<strong>in</strong>g of corrupted packet<br />

3.2.3.6 Perate at L2 switch mode<br />

3.2.4 Network Management<br />

3.2.4.1 One RS-232 (DB-9 type) for serial console<br />

3.2.4.2 One 100Mbps Fast Ethernet for out-band management<br />

3.2.4.3 In-band management<br />

3.2.4.4 EMS support<strong>in</strong>g<br />

3.2.5. Features Specification<br />

3.2.5.1 MAC Address Management<br />

3.2.5.2 Class of Service (CoS)<br />

3.2.5.3 802.3x flow control<br />

3.2.5.4 Packet Rate (Storm) Control<br />

3.2.5.5 IEEE802.1D - Spann<strong>in</strong>g Tree Protocol Support<br />

3.2.5.6 IEEE802.1Q Support<br />

3.2.5.7 IP Multicast<strong>in</strong>g<br />

3.2.5.8 Supported by Port Trunk<strong>in</strong>g<br />

3.2.5.9 Packet Filter<strong>in</strong>g<br />

3.2.5.10 Redundancy protection mechanism<br />

3.2.5.11 Configurable upl<strong>in</strong>k and subtend<strong>in</strong>g modes<br />

3.2.6 Hot swappable ADSL2/ ADSL2+ l<strong>in</strong>e card feature<br />

3.2.6.1 Maximum transmission rate up to 25 Mbps/ 1.2 Mbps for ADSL2+ for<br />

Video, Data, and Voice triple-play applications<br />

3.2.6.2 One gigabit backplane<br />

3.2.6.3 Support G.992.3 and G.992.5 Spectral Mask<br />

3.2.6.4 Support EOC and Overhead Channel Access def<strong>in</strong>ed <strong>in</strong> G.992.3 and<br />

Rec.G.997.1<br />

3.2.6.5 Support the latency path function specified <strong>in</strong> G.992.3 and G.992.5<br />

3.2.6.6 Support Annex L and Annex M specified <strong>in</strong> G.992.3 and G.992.5<br />

3.2.6.7 Support loop diagnostic function specified <strong>in</strong> G.992.3 and G.992.5<br />

3.2.6.8 Support the power management capability specified <strong>in</strong> G.992.3 and<br />

G.992.5<br />

3.2.6.9 Support the capability of the Seamless Rate Adaptation (SRA) on-l<strong>in</strong>e<br />

configuration specified <strong>in</strong> G.992.3 and G.992.5<br />

3.2.6.10 Support ATM Qos (UBR/VBR/CBR) is desirable.<br />

3.2.6.11 Manage with web, CLI, SNMP, and EMS<br />

3.2.6.12 Follow<strong>in</strong>g Network Management features required<br />

3.2.6.12.1 Alarm/Status Surveillance<br />

3.2.6.12.2. Automatic alarm and status report<br />

3.2.6.12.3 LED <strong>in</strong>dication for alarm and system status<br />

3.2.6.12.4 Performance monitor<strong>in</strong>g<br />

3.2.6.12.5 Periodical DSL performance counter update<br />

114


3.2.6.12.6 PVC-to-VLAN mapp<strong>in</strong>g<br />

3.2.6.12.7 ADSL l<strong>in</strong>e rate sett<strong>in</strong>g<br />

3.2.6.12.8 Per-channel QoS<br />

3.2.6.12.9 Security and Memory Backup<br />

3.2.6.12.10 Port isolation(port security)<br />

3.2.6.12.11 Provides non-volatile memory to back-up system database<br />

3.2.6.12.12 Keep previous system parameters dur<strong>in</strong>g re-boot<strong>in</strong>g Self diagnostics.<br />

3.2.6.13 Features Specification<br />

3.2.6.13.1 DELT (dual ended loop test) functionality accord<strong>in</strong>g to ITU-T ADSL2+<br />

3.2.6.13.2 Fast Start up<br />

3.2.6.13.3 Power enhancement<br />

3.2.6.13.4 Rate adaptation<br />

3.2.6.13.5 MAC and packet filter<strong>in</strong>g<br />

3.2.6.13.6 DSLAM should support MAC count limit<strong>in</strong>g features. It helps the limit<br />

the number of dynamic learned MAC addresses <strong>in</strong> the MAC table per port<br />

3.2.6.13.7 Broadcast storm filter<strong>in</strong>g<br />

3.2.6.13.8 Hardware-based mutli-cast<strong>in</strong>g<br />

3.2.6.13.9 IGMP snoop<strong>in</strong>g features (With IGMP snoop<strong>in</strong>g, multicast traffic of a<br />

group is only forwarded to the ports that are members of that group)<br />

3.2.6.13.10 DHCP relay option82 required to limit the number of IP addresses or<br />

deliver some specific IP addresses accord<strong>in</strong>g to certa<strong>in</strong> DSL port, VLAN<br />

ID and option 82 str<strong>in</strong>gs.<br />

3.2.6.13.11 IEEE 802.1x port-based authentication is desired to prevent the<br />

unauthorized ports (clients) from ga<strong>in</strong><strong>in</strong>g access to the network.<br />

3.2.7 Hot swappable SHDSL/SHDSL.bis l<strong>in</strong>e card<br />

3.2.7.1 Symmetric transmission rate of 2.048 Mbps (2-wire), and 4.096 Mbps (4-<br />

wire)<br />

3.2.7.2 Support ETSI TS 101 524 V 1.2.1, ITU-T G.991.2, ITU-T G.991.2.bis<br />

3.2.7.3 One gigabit backplane<br />

3.2.8 Hot swappable 24-port VDSL2 DMT-based l<strong>in</strong>e card<br />

3.2.8.1 Support G.993.2, G.994.1, G.997.1<br />

3.2.8.2 Maximum transmission rate up to 100 Mbps/ 45 Mbps, and average 40/40<br />

Mbps<br />

3.2.8.3 One gigabit backplane<br />

3.2.8.4 Support VDSL2 profiles 8a, 8b, 8c, 8d, 12a<br />

3.2.8.5 Support frequency allocation band plan Annex A, Annex B 998.A, 998.B,<br />

998.M<br />

3.2.8.6 Support U0 band, customer PSD, RFI notch, s<strong>in</strong>gle latency <strong>in</strong> PTM mode<br />

(64/65 encapsulation) and INP<br />

3.2.8.7 Support UPBO, Reed Solomon and Trellis cod<strong>in</strong>g<br />

115


116


Section – III<br />

Chapter – 4<br />

Technical Specifications of<br />

NMS / EMS<br />

117


Specifications for Network / Element Management System<br />

A fully functional NMS/EMS along with all necessary hardware and software and<br />

complete FCAPS (Fault, configuration, account<strong>in</strong>g, performance and security)<br />

functionality should be provided to manage various components of the network - Viz IP<br />

DSLAM etc.<br />

The NMS/EMS should be capable of provid<strong>in</strong>g Fault management, Alarm<br />

management, Configuration Management, performance management and Security<br />

Management of all devices <strong>in</strong> the network. GUI based Configuration, Monitor<strong>in</strong>g and<br />

management should be facilitated by the NMS/EMS.<br />

4.1 Fault Management<br />

This will broadly cover Alarms, Fault localization, Diagnostics and test<strong>in</strong>g and<br />

trouble ticket adm<strong>in</strong>istration.<br />

4.1.1 It should be able to def<strong>in</strong>e whether an alarm is of critical, urgent, non-urgent<br />

nature, and setup a fully fledged Alarm Policy.<br />

4.1.2 A summary of all alarms should be presented <strong>in</strong> real time and on demand or to the<br />

user or to a remote NMS/EMS monitor<strong>in</strong>g po<strong>in</strong>t.<br />

4.1.3 It should give a visual as well as audible <strong>in</strong>dication of an alarm depend<strong>in</strong>g on its<br />

severity level.<br />

4.1.4 All the Alarm related <strong>in</strong>formation, such as start of alarm, end of alarm,<br />

acknowledge time should be able to be logged to a write protected file.<br />

4.1.5 Alarm escalation procedures should be possible to be def<strong>in</strong>ed, depend<strong>in</strong>g on<br />

severity, time elapsed, location, service affected, vendor, customer and<br />

technology. It should have a capability to escalate the alarms to higher authorities<br />

via SMS, emails etc if required <strong>in</strong> future.<br />

4.1.6 It should be able to run diagnostic rout<strong>in</strong>es and to locate the fault up-to a part of<br />

the network. It should have capabilities to identify faults up-to the module / port<br />

level.<br />

4.1.7 It should be possible to run automatic or manual tests based on certa<strong>in</strong> policies<br />

and authorizations. When a test is be<strong>in</strong>g run, the network component should be<br />

locked for any operation from the local craft term<strong>in</strong>al. However it should be<br />

possible to configure whether or not a local craft term<strong>in</strong>al can get precedence over<br />

the NMS/EMS.<br />

118


4.1.8 Alarm monitor<strong>in</strong>g can be customized and saved for future usage.<br />

4.1.9 Alarm localizer should be supplied so that a xxx hav<strong>in</strong>g fault can be localized<br />

easily from a list of current alarms.<br />

4.2.0 Alarm security can be def<strong>in</strong>ed by users / Adm<strong>in</strong>istrator.<br />

4.2.1 System should allow user to build up there knowlage base for alarm trouble<br />

shoot<strong>in</strong>g shar<strong>in</strong>g.<br />

4.2 Configuration Management:<br />

This function broadly covers Provision<strong>in</strong>g, Control, Network Database<br />

preparation and ma<strong>in</strong>tenance.<br />

4.2.1 It should be capable of provision<strong>in</strong>g and management of the VoIP<br />

4.2.2 It should be possible to activate, change or de-activate services or features upon<br />

request from user.<br />

4.2.3 It should be able to configure a new network element hardware, and software with<br />

correspond<strong>in</strong>g database entries.<br />

4.2.4 It should be able to add, modify or delete the network elements, such as entities<br />

like l<strong>in</strong>ks, routes, rates, trunk groups, codec and analysis.<br />

4.2.5 Provision<strong>in</strong>g of SS7 l<strong>in</strong>ks, PRI l<strong>in</strong>ks etc should be possible locally as well as<br />

Premotely. Similarly configur<strong>in</strong>g OPC (orig<strong>in</strong>ation Po<strong>in</strong>t Code), DPC (dest<strong>in</strong>ation<br />

Po<strong>in</strong>t Code), Protocols should be possible.<br />

4.2.6 It should be possible to access the status of a NE (Network Element), receive and<br />

process requests for chang<strong>in</strong>g the status of the network and its components.<br />

4.2.7 It should be able for the NE to <strong>in</strong>itiate automatic notification of change of state<br />

such as change from ‘enable’ to ‘disable’ <strong>in</strong> case of failure.<br />

4.2.8 It should be able to download software and patches to the NE, test the workability<br />

and revert to orig<strong>in</strong>al configuration <strong>in</strong> case of problems.<br />

4.2.9 A s<strong>in</strong>gle GUI should be available for configuration management across all the<br />

devices <strong>in</strong> the network<br />

4.2.10 A database of records of modifications carried out <strong>in</strong> the network should be<br />

ma<strong>in</strong>ta<strong>in</strong>ed, and the size of this database should be configurable.<br />

4.2.11 The NMS/EMS should have the ability to auto-discover the network elements and<br />

the l<strong>in</strong>ks to <strong>in</strong>clude them <strong>in</strong> the visual / graphical map on the GUI.<br />

119


4.2.12 The NMS/EMS shall be able to generate reports based on changes made <strong>in</strong> the<br />

network <strong>in</strong>ventory.<br />

4.2.13 It can be grouped together <strong>in</strong> any N- tier based network doma<strong>in</strong>, geographic<br />

location etc.<br />

4.3 Account<strong>in</strong>g Management:<br />

This function broadly covers measurement of usage of network resources and<br />

computation of costs for the same. It also helps determ<strong>in</strong><strong>in</strong>g uptimes, down-times<br />

and SLA service credits etc.<br />

4.4 Performance Management:<br />

This module gives the ability to detect and correct very low rate or <strong>in</strong>termittent<br />

error conditions, which cannot be detected by the Alarm management module.<br />

4.4.1 Under this module it should be able to set values and thresholds above or below<br />

which certa<strong>in</strong> measurements on a long term basis are to be carried out.<br />

4.4.2 The NMS/EMS should provide history based traffic forecast<strong>in</strong>g.<br />

4.4.3 It should be possible to capture <strong>in</strong>formation such as latency, packet loss, jitter,<br />

l<strong>in</strong>k utilization etc. Based on these SLA reports, Service reports and service<br />

quality reports can be generated.<br />

4.4.4 It should be possible to monitor traffic on real time basis.<br />

4.4.5 The system should support automatic PM query on predef<strong>in</strong>ed time <strong>in</strong>tervals.<br />

4.4.6 The system should support both textual & graphical view of PM results.<br />

4.4.7 The system should support manual on demand PM survey and an immediate of<br />

PM results.<br />

4.5 Security Management:<br />

This broadly covers aspects related to <strong>in</strong>trusion detection, conta<strong>in</strong>ment, and<br />

recovery and security adm<strong>in</strong>istration.<br />

4.5.1 It should be able to detect any <strong>in</strong>cidents of security violations, such as alarms for<br />

door open<strong>in</strong>g unauthorized access <strong>in</strong>to network, physical tamper<strong>in</strong>g of equipment<br />

etc.<br />

4.5.2 It should detect significant shift <strong>in</strong> revenue <strong>in</strong>dicat<strong>in</strong>g frauds or thefts.<br />

4.5.3 It should support actions to limit the damage caused by the security <strong>in</strong>trusion,<br />

such as isolation of equipment, removal of user access permissions etc.<br />

120


4.5.4 Solution should provide Encryption (TLS or IP Sec for Signall<strong>in</strong>g and<br />

IPSec/SRTP for media)<br />

4.5.5 The system should provide user functional access control.<br />

4.5.6 The system can control a user’s session time out; control a user’s passwords valid<br />

Period, control no odd session that the user is allowed to have.<br />

4.6 The Network Management System should be capable of manag<strong>in</strong>g all network<br />

elements<br />

4.7 All <strong>in</strong>formation from each Network element should be presented to the user for<br />

tak<strong>in</strong>g appropriate actions to assess overall network performance.<br />

4.8 Expansions and re-configuration of all network elements should be possible from<br />

the NMS/EMS.<br />

4.9 System shall be capable of captur<strong>in</strong>g the <strong>in</strong>formation like Latency, packet loss,<br />

jitter, l<strong>in</strong>k utilization, etc. us<strong>in</strong>g SNMP protocol. Based on these parameters<br />

NMS/EMS system should able to generate customized reports for each customers<br />

and network elements.<br />

4.10 NMS/EMS shall be able to provide SLA report, service report, and carrier wise<br />

service quality report. System should support SNMP for collect<strong>in</strong>g the element<br />

parameters. System should be hav<strong>in</strong>g <strong>in</strong>tegration capability with third party NMS<br />

system.<br />

4.11 Remote real time monitor<strong>in</strong>g capabilities: System should able to generate the real<br />

time monitor<strong>in</strong>g events and alarms. All events should be displayed on s<strong>in</strong>gle<br />

w<strong>in</strong>dow. Details reports should be stored <strong>in</strong> system for troubleshoot<strong>in</strong>g and<br />

analysis.<br />

4.12 The NMS/EMS shall have XML North Bound Interfaces to get <strong>in</strong>tegrated with the<br />

exist<strong>in</strong>g or proposed CNMS system of Railtel.<br />

4.13 All MIBs should be provided for <strong>in</strong>tegration with third party NMS system.<br />

4.14 NMS/EMS system should have 99.999% uptime.<br />

4.15 Solution should provide Integrated Management (Provision<strong>in</strong>g Alarms)<br />

4.16 Solution should provide Integrated debugg<strong>in</strong>g (Call Trace and Tools)<br />

4.17 Solution should provide Integrated Configuration of Policies (Rout<strong>in</strong>g, QoS, SLA<br />

etc)<br />

121


4.18 Solution should provide a s<strong>in</strong>gle end to end Call Detail Record.<br />

4.19 Solution should provide Topology hid<strong>in</strong>g<br />

4.20 Solution should provide DoS Protection<br />

4.21 Solution should provide Bandwidth theft protection<br />

4.22 Solution should provide Reports, Statistics and alarms for IP <strong>in</strong>terfaces and IP<br />

remote po<strong>in</strong>ts.<br />

4.23 System Management:<br />

4.23.1 Solution should provide <strong>in</strong>tegrated test capability that can do related data and<br />

voice test.<br />

4.23.2 The EMS / NMS system should have capability to support several non- current<br />

EMS / NMS users.<br />

4.23.3 The EMS / NMS system should have the capability to support different broadband<br />

technology products like DSLAM, PON etc.<br />

4.23.4 The solution should support its own system monitor<strong>in</strong>g capability.<br />

122


Section – III<br />

Chapter – 5<br />

IP DSLAM Equipment<br />

Characteristics<br />

123


Equipment Characteristics<br />

5.1 EQUIPMENT INTERFACE AND PROTECTION<br />

5.1.1 The proposed IP-DSLAM shall be a self-conta<strong>in</strong>ed unit, with suitable enclosure<br />

for Subscriber premises equipments.<br />

5.1.2 The system shall be flexible to provide any type of services required by<br />

subscribers. The System shall also be able to adapt to the chang<strong>in</strong>g needs of a<br />

subscriber, without affect<strong>in</strong>g other subscribers.<br />

5.1.3 Customers locations might be <strong>in</strong>stalled at variable distances, the Bidder shall,<br />

therefore, determ<strong>in</strong>e the distances supported by the different product types<br />

proposed by the Bidder.<br />

5.1.4 The equipment shall be <strong>in</strong>stalled <strong>in</strong> Outdoor Cab<strong>in</strong>et (Rack) and/or Indoor<br />

Cab<strong>in</strong>et (Rack) without air conditioner. Batteries, rectifier, r<strong>in</strong>ger generator,<br />

arrestor (for outdoor type) and all required ancillaries shall be conta<strong>in</strong>ed <strong>in</strong> the<br />

cab<strong>in</strong>et (rack).<br />

5.1.5 The proposed DSLAM to be used <strong>in</strong> the outdoor cab<strong>in</strong>et as a term<strong>in</strong>al for copper<br />

cable connected to service the customer shall be complied with Railway’s<br />

specification. The number of DSLAM requirement is specified <strong>in</strong> Technical<br />

Requirement.<br />

5.1.6 In case where the electrical power is cut off caus<strong>in</strong>g the IP-DSLAM to shut down,<br />

the IP-DSLAM must have the capability to automatically cont<strong>in</strong>ue function<strong>in</strong>g<br />

without additional set up or reconfiguration.<br />

5.2. EQUIPMENT CHARATERISTICS<br />

5.2.1 Environmental Specifications<br />

5.2.1.1 For Type A IP DSLAM<br />

Operat<strong>in</strong>g Temp 0 deg C to 50 deg C<br />

Storage Temp -40 deg C to 70 deg C<br />

Operat<strong>in</strong>g Humility 10 ~ 90% (non-condens<strong>in</strong>g)<br />

Storage Humility 10 ~ 95% (non-condens<strong>in</strong>g)<br />

Power Supply: -48V DC<br />

5.2.1.2 For Type B IP DSLAM<br />

Operat<strong>in</strong>g temperature: 0°C ~ 50°C<br />

Storage temperature: -40°C ~ 85°C<br />

Humidity: 5 ~ 95% (non-condens<strong>in</strong>g)<br />

Power Supply: -48V DC<br />

5.2.1.3 ADSL <strong>in</strong>terface shall conform to ITU-T standard.<br />

124


5.2.1.4 The IP-DSLAM must have <strong>in</strong>ternal oscillator or free runn<strong>in</strong>g for synchronization<br />

purpose.<br />

5.2.1.5 The proposed IP-DSLAM shall support alarm <strong>in</strong>dicators. Diagnostics function<br />

with the capability to identify failure shall also be supported.<br />

5.2.2 MECHANICAL REQUIREMENT<br />

Indoor type<br />

All equipment units shall be “plug-<strong>in</strong>” types and capable of be<strong>in</strong>g secured <strong>in</strong> order<br />

to prevent accidental removal. No de-solder<strong>in</strong>g is required for removal of a<br />

module or unit.<br />

a) The equipment shall be configured as 19” or ETSI standard rack type with small<br />

compact footpr<strong>in</strong>t.<br />

b) Where a rack, sub-rack, or assembly is only partially equipped, the unequipped<br />

portions shall be fitted with dust covers or dummy panels to present a pleas<strong>in</strong>g<br />

appearance.<br />

c) The Cab<strong>in</strong>et has to be Custom Design to provide Hous<strong>in</strong>g Solution for IP<br />

DSLAM Systems.<br />

d) The Cab<strong>in</strong>et should feature Enhanced cool<strong>in</strong>g system & Superior heat dissipation<br />

so as to accommodate higher l<strong>in</strong>e density & traffic rate application & also to<br />

improve the battery life.<br />

e) The cab<strong>in</strong>et should have rugged construction, Side Splic<strong>in</strong>g.<br />

f) The racks should have sealed Design & to have a life Span of M<strong>in</strong>imum 15<br />

Years.<br />

5.3 OVERVOLTAGE PROTECTION<br />

Over voltage Protection shall comply with Railway’s specification. It shall cover<br />

all protections for damages which may be occurred <strong>in</strong> l<strong>in</strong>e <strong>in</strong>terface circuit and<br />

other equipment due to over voltage and over current which may be caused by<br />

direct lightn<strong>in</strong>g strikes, <strong>in</strong>duction from currents <strong>in</strong> power l<strong>in</strong>es <strong>in</strong>clud<strong>in</strong>g electric<br />

traction systems, contacts with power l<strong>in</strong>es and rise of earth potential.<br />

5.3.1 Protection devices shall be provided for all term<strong>in</strong>als connected to all outside<br />

plant cables <strong>in</strong>clud<strong>in</strong>g subscriber l<strong>in</strong>es <strong>in</strong> order to enable the equipment to<br />

withstand such conditions, without damage or excessive protector ma<strong>in</strong>tenance.<br />

5.3.2 Detailed characteristics and descriptions of all the proposed protection devices<br />

shall be <strong>in</strong>cluded <strong>in</strong> the proposal.<br />

5.4. POWER SUPPLY<br />

The power supply shall be either –48 Volts DC +20% to -10% or 220 ±10% Volts<br />

AC, 50 ± 10% Hz. without voltage adapter.<br />

125


Section – III<br />

Chapter – 6<br />

Technical Specifications of<br />

ADSL Modem<br />

126


Technical Specifications of ADSL Modem<br />

6.1 ADSL Modem should be a 4-Port Ethernet ADSL2/2+ and WiFi Router which<br />

comb<strong>in</strong>es an “Always-On ”high speed Asymmetric Digital Subscriber L<strong>in</strong>e<br />

(ADSL) connection to the Telephone L<strong>in</strong>e, and one 10/100BASE-T Ethernet port<br />

connection to a host PC or other Ethernet device to enable the widest array of host<br />

connectivity.<br />

6.2 It should be fully compliant with ADSL, ADSL2, ADSL 2+ and RE-DSL2<br />

specifications. It should support ADSL downstream and upstream data rates up to<br />

24 Mbps and 1 Mbps.<br />

6.3 It should be Compliant to ANSI T1.413 i2, G.992.1, G.992.2, G.992.3, G.992.5<br />

and READSL2 ADSL standards. It should also comply with follow<strong>in</strong>g<br />

20 Mbps 1 Km<br />

10 Mbps 2 Km<br />

2 Mbps 4 Km<br />

1 Mbps 5 Km<br />

6.4 It should have built-<strong>in</strong> Quick set up wizard.<br />

6.5 It should be fully compliant with Annex A/B/B(U-R2) ADSL2/2+ specifications.<br />

6.6 It should support all digital loop ADSL.<br />

6.7 It should support IP / Bridge Filter<strong>in</strong>g functionality.<br />

6.8 It should support IP QoS features.<br />

6.9 It should support RFC 1483 Bridge / Rout<strong>in</strong>g over ATM over ADSL.<br />

6.10 It should support PPPoE and PPPoA Rout<strong>in</strong>g ATM over ADSL.<br />

6.11 It should support ATM Layer with Traffic Shap<strong>in</strong>g QoS.<br />

6.12 It should support up to 8PVCs.<br />

6.13 It should have Hardware Reset button for fast default sett<strong>in</strong>g recovery.<br />

6.14 It should have HTTP Web-based Management/Configuration.<br />

6.15 It should have LED <strong>in</strong>dicator <strong>in</strong>dicat<strong>in</strong>g connection status..<br />

127


6.16 It should support follow<strong>in</strong>g ADSL features<br />

6.17.1 Hardware ATM AAL0, AAL5 and OAM.<br />

6.17.2 Software ATM AAL1 and AAL3/4..<br />

6.17.3 ATM UBR, CBR, VBR-rt and VBR-nt Traffic Shap<strong>in</strong>g QoS.<br />

6.18 It should support follow<strong>in</strong>g Bridg<strong>in</strong>g / Rout<strong>in</strong>g features<br />

6.18.1 RFC 2684/1483 Routed/Bridged.<br />

6.18.2 RFC 2364 PPPoA.<br />

6.18.3 RFC 2516 PPPoE.<br />

6.18.4 Transparent Bridg<strong>in</strong>g ( IEEE 802.1D ).<br />

6.18.5 Dynamic and Static Rout<strong>in</strong>g.<br />

6.18.6 DHCP Server, Relay and Client.<br />

6.18.7 NAT with extensive ALG support.<br />

6.18.8 DNS Proxy.<br />

6.18.9 DDNS feature.<br />

6.18.10 IGMP Proxy.<br />

6.18.11 RIP v1 & v2.<br />

6.18.12 Port Mapp<strong>in</strong>g and Port Forward<strong>in</strong>g features.<br />

6.18.13 DMZ functionality.<br />

6.18.14 VPN Pass-Through.<br />

6.18.15 PAP and CHAP PPP Authentication<br />

6.19 It should support follow<strong>in</strong>g Security features:-<br />

6.19.1 Embedded Firewall feature.<br />

6.19.2 IP Filter<strong>in</strong>g features.<br />

6.19.3 Bridge/MAC Filter<strong>in</strong>g.<br />

6.20 It should support follow<strong>in</strong>g Management features:-<br />

6.20.1 Web-based Configuration/Management.<br />

128


6.20.2 AutoPVC.<br />

6.20.3 Firmware upgrade via HTTP/TFTP/FTP.<br />

6.20.4 Built-<strong>in</strong> diagnostic function.<br />

6.20.5 System Log.<br />

6.20.6 SNMP Management.<br />

6.20.7 TR-064 feature<br />

6.20.8 TR-069 feature<br />

6.21 Hardware Interfaces<br />

6.21.1 One RJ-11 ADSL connector.<br />

6.21.2 One RJ-45 LAN Connector.<br />

6.21.3 One Reset Button for factory default sett<strong>in</strong>g recovery.<br />

6.21.4 One Power adaptor connector<br />

6.21.5 LED Indicators <strong>in</strong>dicates connection status<br />

6.21.6 UPnP IGD 1.0 support<br />

6.21.7 Software upgradable IPV 6 enable / disable through GUI<br />

6.21.8 Local automotive GUI activation<br />

6.21.9 QOS features<br />

IEEE 802.1 P Bit mark<strong>in</strong>g based upon services<br />

6.21.10 WiFi Specifications<br />

6.21.10.1 64 / 128 bit Wired Equivalent Privacy ( WEP)<br />

6.21.10.2 WiFi Protected Access (WPA) system<br />

6.21.10.3 Wireless standards and features 802.11 b / g<br />

6.21.10.4 MPC association control<br />

6.22.10.5 Additional Security Features<br />

1. POD Parental Control<br />

2. Fillter<strong>in</strong>g on application basis ( easy MSN messenger / Yahoo etc)<br />

129


3. Stateful Packet Inspection<br />

4. DOS Denial of Services<br />

130


Section – III<br />

Chapter – 7<br />

Technical Specifications of<br />

Router<br />

131


Technical Specification of Router<br />

7.1 SPECIFICATION<br />

The router should have 512 k Boot ROM, 8 MB Flash memory and 64 M of<br />

SDRAM or required memory to support follow<strong>in</strong>g features<br />

7.1.1 The router should have 60 Kbps Forward<strong>in</strong>g Rate.<br />

7.1.2 The router should have at least two 10/100 M Ethernet and two channelised E1<br />

ports.<br />

7.1.3 The router should have Maximum Power consumption 50 W.<br />

7.1.4 Should work on either 230 V AC or -48 V DC Power Supply<br />

7.2 PROTOCOLS<br />

The router should support the follow<strong>in</strong>g Protocols: -<br />

7.2.1 Data L<strong>in</strong>k Layer: -<br />

The router should support 802.1Q, FR, LAPB, PPP, Multil<strong>in</strong>k PPP, PPP, HDLC,<br />

, VLAN Data L<strong>in</strong>k Layer protocols.<br />

7.2.2 Network Layer: -<br />

The router should support ARP/Proxy ARP, DNS/DNS Proxy, NAT, ICMP,<br />

IGMP, DHCP, Server/Client/Relay), IP Multicast & PIM-DM/SM Network Layer<br />

protocols.<br />

7.2.3 Rout<strong>in</strong>g: -<br />

The router should provide Static, RIP, OSPF, , BGP-4, rout<strong>in</strong>gs protocols.<br />

7.2.4 Reliability: -<br />

The router should support Port Backup, HSRP, VRRP reliability protocols.<br />

7.3 SECURITY<br />

The router should provide TACACS+/ Radius, AAA, , Firewall, L2TP, PPTP,<br />

GRE, IPSec, IKE and 500 VPN Tunnel security features.<br />

7.4 QoS<br />

The router should support FIFO, PQ, CQ, CBWFQ, WFQ, RED, WRED, DSCP,<br />

IP Precedence, RTS, RSVP & CAR QoS features.<br />

7.5 MANAGEMENT<br />

The router should be managed through Console, AUX, Web, Telnet, TFTP,<br />

SNMP V1/2/3, MIB, NTP, RMON 1.2.3.9<br />

7.6 INTERFACE<br />

132


The router should have at least two 10/100 M Ethernet and two channelised E 1<br />

ports.<br />

7.7 POWER SUPPLY<br />

The router should work on either 230 V AC or -48 V DC power supply.<br />

133


Section – III<br />

Chapter – 8<br />

Technical Specifications of<br />

Layer – 3 Switch<br />

134


Technical Specification of Layer-3 Switch<br />

8.1 General Specification: -<br />

8.1.1 The L3 switch should support 12.8 Gbps switch<strong>in</strong>g fabric.<br />

8.1.2 The L3 switch should have at least 8 MB Flash memory and 64 M of SDRAM.<br />

8.1.3 The L3 switch should have m<strong>in</strong>imum 24 100Base-TX and two 1000Base-TX/FX<br />

ports.<br />

8.1.4 The L3 switch should support 8 K MAC address.<br />

8.1.5 The L3 switch should have Maximum Power consumption 40 W.<br />

8.1.6 The L3 switch work on either 230 V AC or -48 V DC Power Supply.<br />

8.1.7 The L3 switch should have power redundancy.<br />

a. The L3 switch should have stackable.<br />

8.2 Rout<strong>in</strong>g Protocol: -<br />

The L3 switch should support RIP-I & II, OSPF, BGP, IGMP Snoop<strong>in</strong>g, IGMP<br />

v1/v2/v3, PIM-DM/PIM-SM, GMRP, DVMRP, rout<strong>in</strong>gs protocols.<br />

8.3 Availability: -<br />

The L3 switch should support 802.1D STP, 802.1w RSTP, 802.1s MSTP, VRRP,<br />

802.3ad L<strong>in</strong>k (LACP), Aggregation, Load balance, ARP Proxy availability<br />

features.<br />

8.4 VLAN: -<br />

The L3 switch should support Port-based VLAN, 802.1Q VLAN, GVRP, and 8k<br />

No. of VLAN.<br />

8.5 Security: -<br />

The L3 switch should support 802.1x, Web authentication, Syslog, Port Security,<br />

SSH v1/v2, TACACS+ and Radius security features.<br />

8.6 QoS: -<br />

The L3 switch should support 802.1p, Broadcast storm control, Multicast Storm<br />

control, ToS, COS and DiffServ (DSCP) QoS features.<br />

8.7 Management: -<br />

135


The L3 switch should be managed through Console, Web, Telnet CLI, DHCP<br />

Server, DHCP Relay, DHCP Client, TFTP, SNMP, MIB, NTP, RMON 1.2.3.9,<br />

and Port Mirror<strong>in</strong>g.<br />

8.8 Access Control List: -<br />

The L3 switch should have Access Control List based on <strong>in</strong>gress, egress, MAC<br />

address, VLAN, IP address, protocol type, TCP/UDP port, Time and DSCP.<br />

8.9 Interfaces: -<br />

The L3 switch should have m<strong>in</strong>imum 24 100Base-TX and two 1000Base-TX/FX<br />

ports<br />

8.10 Power Supply: -<br />

The L3 Switch should work on either 230 V AC or -48 V DC power supply.<br />

136


Section – III<br />

Chapter – 9<br />

Technical Specifications of<br />

ADSL L<strong>in</strong>e Tester<br />

137


Specifications of ADSL L<strong>in</strong>e Tester<br />

9.1 ADSL l<strong>in</strong>e tester should support the latest ADSL2+, ADSL2 and RE-ADSL<br />

standards, and should be used to support the older ADSL deployments.<br />

9.2 The Tester with ADSL2+ module should give all the <strong>in</strong>formation about the<br />

connection, right on screen and allow<strong>in</strong>g users to store results as a permanent<br />

record of the <strong>in</strong>stallation.<br />

9.3 It should support follow<strong>in</strong>g connectors<br />

9.3.1 RJ-45 for connection to an ADSL2+ l<strong>in</strong>e<br />

9.3.2 RS232C (V.24) DB-9 for upgrad<strong>in</strong>g software and download<strong>in</strong>g results to a PC.<br />

9.3.3 RJ-45 10BaseT Ethernet connection<br />

9.4 It should have at least 100 result storage.<br />

9.5 It should comply with follow<strong>in</strong>g standards:-<br />

9.5.1 ITU-T G.992.5 (ADSL2+)<br />

9.5.2 ITU-T G.992.3 (ADSL2) <strong>in</strong>clud<strong>in</strong>g RE-ADSL (Annex L)<br />

9.5.3 ITU-T G.992.1 (G.DMT)<br />

9.5.4 ANSI T1.413 Issue 2, and<br />

9.5.5 ITU-T G.994.1 (G.hs)<br />

9.6 Modes of Operation should be ATU-R.<br />

9.7 Chipset used should be Conexant.<br />

9.8 It should support follow<strong>in</strong>g general features:-<br />

9.8.1 Battery Module should be Rechargeable and Battery Usage should be more than 5<br />

hours<br />

9.8.2 AC Power (Ma<strong>in</strong>s) Adaptor should have Input 100-240 VAC, 50-60 Hz.<br />

9.8.3 It should have Display of at least 128 x 128 pixel backlit monochromatic LCD<br />

9.8.4 AC Power (Ma<strong>in</strong>s) Adaptor should have Input 100-240 VAC, 50-60 Hz & Output<br />

15 VDC, 2.7 A<br />

9.8.5 Operat<strong>in</strong>g Temperature should be 0°C to 50°C (32°F to 120°F)<br />

9.8.6 Storage Temperature should be –20°C to 70°C (–4°F to 158°F)<br />

9.8.7 It should have Display of 128 x 128 pixel backlit monochromatic LCD<br />

9.9 It should Support the follow<strong>in</strong>g optional Test Suites:<br />

9.9.1 Broadband Internet Application Test Suite (BIATS): features P<strong>in</strong>g, traceroute,<br />

Web Speed test<strong>in</strong>g<br />

138


9.9.2 Video over DSL Test Suite (VDTS): Features MPEG support, STB Emulation,<br />

Analysis of DSL,<br />

ATM, and IP layers<br />

9.9.3 Throughmode (TMOD): Features LOS counters, ADSL Frame counters, ATM<br />

Cell counters and<br />

DSL Parameters<br />

9.9.4 Video over IP Test Suite (VOIP): Features SIP & MGCP support, Call Flow<br />

Analysis, Jitter Analysis, and Interpacket Dispersion Analysis<br />

139

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!