01.02.2015 Views

Hkkjrh; fpfdRlk i)fr ,oe gksE;ksiSFkh foHkkx

Hkkjrh; fpfdRlk i)fr ,oe gksE;ksiSFkh foHkkx

Hkkjrh; fpfdRlk i)fr ,oe gksE;ksiSFkh foHkkx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 Analyst Office<br />

4.77mx3.95m<br />

7. Adm. Office 6.0x3.5m<br />

8. Chowkidar Room 2.40mx2.70m<br />

Toilet<br />

1mx1.68m<br />

Kitchen<br />

1.28mx1.68m<br />

9. Toilets: Gents<br />

1.50x3.62m<br />

Ladies<br />

1.50mx2.75m<br />

10. Varanda: Ground floor 1.55 m<br />

wide<br />

Fist floor<br />

2.45 m wide<br />

Total Area :<br />

2370x2<br />

Sq. Ft. (Double Storey)<br />

Detail of the Equipments purchased <strong>fr</strong>om the central<br />

assistance<br />

Sr.No Name of instrument Qty<br />

Date of receipt<br />

1. Electronic Balance One unit<br />

Received 05<br />

2. Sieve Shaker One<br />

Received 04<br />

3. Re<strong>fr</strong>actometer (digital) One<br />

Received 03<br />

4. Dissolution rate test apparatus One<br />

Received 05<br />

5. Advanced Research Microscope One<br />

Received 03<br />

6. Ultra purification water system One<br />

Received 06<br />

7. Muffle furnace. One<br />

Received 06<br />

8. HPTLC System One unit<br />

Received 06<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!