IRRIGATION DEPARTMENT<br />
UTTAR PRADESH<br />
PRE-QUALIFICATION DOCUMENT<br />
<strong>NAME</strong> <strong>OF</strong> <strong>WORK</strong>:-Construction of Head cum cross regulator of<br />
Bahjoi branch and head regulator of<br />
Chandousi branch at the tail of Main canal of<br />
Madhya Ganga Canal Stage - II<br />
Tender Notice No. : - 02 / MGCCC / 2009–10<br />
Date of Opening : - 12/08/2009<br />
Name of Contractor<br />
……………………………………………………………………<br />
….………………………………………………………………<br />
……………………………………………………………………<br />
MADHYA GANGA CANAL CONSTRUCTION CIRCLE<br />
BULANDSHAHR
Page – 2<br />
<strong>NAME</strong> <strong>OF</strong> <strong>WORK</strong>:-Construction of Head cum cross regulator of<br />
Bahjoi branch and head regulator of Chandousi branch at the tail of Main canal of<br />
Madhya Ganga Canal Stage - II<br />
PRE - QUALIFICATION DOCUMENT<br />
CONTENTS<br />
PAGE NO.<br />
SECTION<br />
TITLE<br />
FROM TO<br />
I Brief particulars of the work 3 3<br />
II Information & instructions for applicants 4 8<br />
III<br />
Pre-qualification information & letter of transmittal 9 9<br />
IDT-1 10 11<br />
IDT-2 12 13<br />
IDT-3 14 15<br />
Form ‘A’ - Financial Information 16 16<br />
Form ‘B’ - Details of all works of similar nature completed<br />
during the last five years ending last day of month April 2009<br />
17 17<br />
Form ‘C’ - Projects under execution or awarded 18 18<br />
Form ‘D’ - Performance report of works referred to in<br />
Form “B” and form “C”<br />
19 19<br />
Form ‘E’ - Structure & Organization 20 21<br />
Form ‘F’- Details of technical & administrative personnel to be<br />
employed for the work<br />
Form ‘G’- Details of construction plant & equipment likely<br />
to be used in carrying out the work<br />
22 22<br />
23 25<br />
IV Notice Inviting Tender for invitation for prequalification 26 27<br />
V Certificate by the contractor 28 28<br />
ISSUED TO<br />
Mr. / M/s……………………………………………………………………………………………………<br />
Signature of contractor<br />
Superintending Engineer<br />
M.G.C.C. Circle, BulandShahr
Page No.-3<br />
SECTION - I<br />
BRIEF PARTICULARS <strong>OF</strong> THE <strong>WORK</strong><br />
Salient details of the work for which pre-qualification applications are invited are as under:<br />
ITEM<br />
BRIEF PARTICULARS<br />
Name of Work Construction of Head cum cross regulator of<br />
Bahjoi branch and head regulator of Chandousi branch at<br />
the tail of Main canal of Madhya Ganga Canal Project<br />
Stage - II<br />
Approximate cost<br />
Period of completion<br />
Rs.- 590.00 Lac<br />
18 Month<br />
Signature of contractor with seal
Page No.-4<br />
SECTION : II<br />
INFORMATION & INSTRUCTIONS FOR APPLICANTS<br />
1.0 General:<br />
1.1 Letter of transmittal and forms for pre-qualification are given in Section III.<br />
1.2 All information called for in the enclosed forms should be furnished against<br />
the relevant columns in the forms. If for any reason, information is furnished on a separate sheet,<br />
this fact should be mentioned against the relevant column. Even if no information is to be<br />
provided in a column, a "nil" or “no such case" entry should be made in that column. If any<br />
particulars /queries are not applicable in case of the applicant, it should be stated as “not<br />
applicable". The applicants are cautioned that not giving complete information called for in<br />
the application forms or not giving it in clear terms or making any change in the prescribed<br />
forms or deliberately suppressing the information may result in the applicant being<br />
summarily disqualified. Applications received late will not be entertained.<br />
1.3 The applicant should sign each page of the application.<br />
1.4 Overwriting should be avoided. Correction, if any, should be made by neatly<br />
crossing out, initialing, dating and rewriting. Pages of the pre-qualification document<br />
are numbered. Additional sheets, if any added by the contractor, should also be<br />
numbered by him. They should be submitted as a package with signed letter of<br />
transmittal.<br />
1.5 References, information and certificates from the respective clients certifying<br />
suitability, technical know how or capability of the applicant should be signed by an officer<br />
not below the rank of Executive Engineer or equivalent.<br />
1.6 The applicant may furnish any additional information, which he thinks is<br />
necessary to establish his capabilities to successfully complete the envisaged work. He is,<br />
however, advised not to furnish superfluous information. No information shall be<br />
entertained after submission of pre-qualification document unless the Employer calls it<br />
for.<br />
1.7 Any information furnished by the applicant found to be incorrect either<br />
immediately or at a later date, would render him liable to be debarred from<br />
tendering / taking up of work in I.D, U.P .<br />
1.8 The pre-qualification document in prescribed form duly completed and signed should<br />
be submitted in a sealed cover. The sealed cover superscribed “Construction of Head<br />
cum cross regulator of Bahjoi branch and head regulator of Chandousi branch at the tail<br />
of Main canal of Madhya Ganga Canal Project Stage - II.” shall be received by the S.E,<br />
M.G.C.C.C. or his authorised representative upto 3.00 PM on 01/07/2009.<br />
Documents submitted in connection with pre-qualification will be treated confidential and<br />
will not be returned.<br />
Signature of contractor with seal
Page No.-5<br />
1.9 Prospective applicants may request clarification of the project requirements and<br />
pre-qualification document. Any clarification given by the Employer will be forwarded to<br />
all those who have purchased the pre-qualification document.<br />
No request for clarification will be considered after 1.00 PM on 01/07/2009.<br />
2.0 Definitions :<br />
2.1 In this document the following words and expressions have the meaning hereby<br />
assigned to them.<br />
2.2 Employer: Means the Governor of U.P, acting through the Superintending Engineer,<br />
Madhya Ganga Canal Construction Circle BulandShahr.<br />
2.3 Applicant: Means the individual, proprietary firm, firm in partnership, limited<br />
company private or public or corporation.<br />
2.4 "Year” means “Financial Year" unless stated otherwise.<br />
3.0 Method of Application:<br />
3.1 If the applicant is an individual, the application shall be signed by him above<br />
his full typewritten name and current address.<br />
3.2 If the applicant is a proprietary firm, the application shall be signed by the<br />
proprietor above his full typewritten name and the full name of his firm with its<br />
current address.<br />
3.3 If the applicant is a firm in partnership, the application shall be signed by all the<br />
partners of the firm above their full typewritten names and current addresses or<br />
alternatively by a partner holding power of attorney for the firm. In the latter case a<br />
certified copy of the power of attorney should accompany the application. In both<br />
cases a certified copy of the partnership deed and current address of all the<br />
partners of the firm should accompany the application.<br />
3.4 If the applicant is a limited company or corporation, the application shall be<br />
signed by a duly authorised person holding power of attorney for signing the<br />
application accompanied by a copy of the power of attorney. The applicant should also<br />
furnish a copy of the Memorandum of Articles of Association duly attested by a Public<br />
Notary.<br />
4.0 Final Decision Making Authority.<br />
The employer reserves the right to accept or reject any application and to annul the prequalification<br />
process and reject all applications at any time, without assigning any<br />
reason or incurring any liability to the applicants.<br />
Signature of contractor with seal
Page No.-6<br />
5.0 Site Visit<br />
The applicant is advised to visit the site of work, at his own cost, and examine it and its<br />
surroundings by himself, collect all information that he considers necessary for proper<br />
assessment of the prospective assignment.<br />
7.0 INITIAL CRITERIA FOR ELIGIBILITY FOR PRE-QUALIFICATION:<br />
7.1 The applicant should have satisfactorily completed following similar works<br />
(i) One single work costing not less than Rs. 500 Lac of the following nature during the last<br />
two years ending last day of the month 31/3/2009. For this purpose, 'cost of work' shall mean<br />
gross value of the completed work including the cost of materials supplied by the<br />
Govt./Client, but excluding those supplied free of cost. This should be certified by an<br />
officer not below the rank of Executive Engineer/Project Manager or equivalent.<br />
Similar work shall mean Construction of AQUEDUCT / REGULATOR/HYDROLIC<br />
STRUCTURE <strong>OF</strong> SAME NATURE with R.C.C.<br />
7.2 The applicant should have had annual financial turn over (gross) of Rs.600<br />
Lac on Civil construction works during one year of the immediate last two consecutive<br />
financial years. This should be duly audited by a Chartered Accountant.<br />
7.3 The applicant should not have incurred any loss in last two consecutive financial<br />
years duly certified by the Chartered Accountant.<br />
7.4 The applicant should own construction equipment as per list required for the proper<br />
and timely execution of the work. Else, he should certify that he would be able to manage<br />
the equipment by hiring etc. and submit the latter of firms from whom he proposes to hire<br />
the same<br />
7.5 The applicant should have sufficient number of Technical and Administrative<br />
employees for the proper execution of the contract work. The applicant should<br />
submit a list of name of these employees .<br />
7.6 The applicant's performance for each work completed in the last two years and in hand<br />
should be certified by an officer not below the rank of Executive Engineer or equivalent .<br />
Signature of contractor with seal
Page No.-7<br />
8.0 EVALUATION CRITERIA FOR PRE-QUALIFICATION<br />
8.1 For the purpose of pre-qualification, applicants will be evaluated in the following<br />
manner:<br />
8.1.1 The initial criteria prescribed in above in respect of experience of similar class of<br />
works completed, bidding capacity and financial turn over etc. will first be<br />
scrutinized and the applicant’s eligibility for pre-qualification for the work be<br />
determined<br />
8.1.2 The applicants qualifying the initial criteria as set out in Para 7.1 to 7.5 above will be<br />
evaluated for following criteria by scoring method on the basis of details furnished<br />
by them.<br />
Sl. no Particulars Maximum marks<br />
1 Financial strength (Form 'A') 20 Marks<br />
2 Experience in similar nature of Work during Last two years<br />
(Form 'B')<br />
20 Marks<br />
3 Performance on works (Form 'D') 20 Marks<br />
4 Personnel and Establishment (Forms 'E' & "F") 10 Marks<br />
5 Plant & Equipment (Form 'G') 10 Marks<br />
6 Additional information provided by the contractor which 20 Marks<br />
shows his ability to complete the work<br />
TOTAL 100 Marks<br />
To become eligible for short listing the applicant must secure at least fifty percent<br />
marks in each and sixty percent marks in aggregate.<br />
The <strong>Department</strong>, however, reserves the right to restrict the list of such pre-qualified<br />
contractors to any number deemed suitable by it.<br />
8.2 Even though any applicant may satisfy the above requirements, he would be<br />
liable to disqualification if he has:<br />
(a) Made misleading or false representation or deliberately suppressed the information<br />
in the forms, statements and enclosures required in the pre- qualification<br />
document.<br />
(b) Record of poor performance such as abandoning work, not properly completing the<br />
contract, or financial failures /weaknesses etc.<br />
8.2.1 Short listing of the bidders shall be subject to thorough verification of their<br />
credentials and inspection of similar works carried out/in progress by them, through<br />
a Technical Committee of experts to be constituted by S.E, M.G.C.C.C. or his authorised<br />
representative<br />
9.0 FINANCIAL INFORMATION<br />
Applicant should furnish the following financial information:<br />
Annual financial statement for the last two years (in Form " A").<br />
Signature of contractor with seal
Page No.-8<br />
EXPERIENCE IN <strong>WORK</strong>S HIGHLIGHTING EXPERIENCE IN SIMILAR <strong>WORK</strong>S<br />
10.1 Applicant should furnish the following:<br />
(a) List of all works of similar nature successfully completed during the last two years (in<br />
Form "B")<br />
(b) List of all the projects under execution or awarded (in Form "C").<br />
10.2 Particulars of completed works and performance of the applicant duly<br />
authenticated /certified by an officer not below the rank of Executive engineer or<br />
equivalent should be furnished separately for each work completed or in progress (in<br />
Form" D").<br />
10.3 Information in Form `C’ should be complete and no work should be left out.<br />
11.0 ORGANISATION INFORMATION<br />
Applicant is required to submit in respect of his organisation in Forms "E"& “F".<br />
12.0 CONSTRUCTION PLANT & EQUIPMENT<br />
Applicant should furnish the list of construction plant and equipment including steel<br />
shuttering, centering and scaffolding likely to be used in carrying out the work (in Form<br />
"G").Details of any other plant & equipment required for the work (not included in<br />
Form G and available with the applicant may also be indicated.)<br />
13.0 LETTER <strong>OF</strong> TRANSMITTAL<br />
The applicant should submit the letter of transmittal attached with pre-qualification<br />
document.<br />
14.0 TENDER SUBMISSION<br />
After evaluation of pre-qualification applications, a list of qualified agencies will be<br />
prepared. Short listing of the bidders shall be done after thorough verification of their<br />
credentials and inspection of similar works carried out/in progress by them, through a<br />
Technical Committee of experts to be constituted by S.E, M.G.C.C.C. or his authorised<br />
representative. Thereafter, the agencies who qualified in the pre-qualification bid would<br />
only be invited to submit financial bid for the work.<br />
15.0 AWARD CRITERIA<br />
15.1 The employer reserves the right, without being liable for any damages or obligation or<br />
inform the applicant, to:<br />
(a) Amend the scope and value of contract to the applicant.<br />
(b) Reject any or all of the applications without assigning any reason.<br />
15.2 Any effort on the part of the applicant or his agent to exercise influence or to<br />
pressurise the employer would result in rejection of his application. Canvassing of any<br />
kind is strictly prohibited.<br />
Signature of contractor with seal
Page No.-9<br />
SECTION -III<br />
From : ………………………<br />
To<br />
Superintending Engineer<br />
Madhya Ganga Canal Construction Circle BulandShahr.<br />
Subject: Submission of pre-qualification application for the work of Construction of<br />
Head cum cross regulator of Bahjoi branch and head regulator of Chandousi branch at the<br />
tail of Main canal of Madhya Ganga Canal Project Stage - II<br />
Sir,<br />
Having examined the details given in pre-qualification press Notice and prequalification<br />
document for the above work, I/We hereby submit the pre- qualification<br />
document and other relevant information.<br />
1.I/We hereby certify that all the statements made and information supplied in the enclosed<br />
forms “A” to “F” and accompanying statement are true and correct.<br />
2. I/We have furnished all information and details necessary for pre-qualification and have<br />
no further pertinent information to supply.<br />
3. I/We submit the requisite certified solvency certificate and authorise the S.E,<br />
M.G.C.C.C. or his authorised representative , to approach the Bank issuing the solvency<br />
certificate to confirm the correctness thereof. I/ we also authorise S.E, M.G.C.C.C. or<br />
his authorised representative to approach Individuals, employers, firms and corporation<br />
to verify our competence and general reputation.<br />
4. I/We submit the following certificates in support of our suitability, technical<br />
know how and capability for having successfully completed the following works:<br />
Sl. No. Name of work Certified By/from<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Enclosures<br />
Date<br />
Signature of contractor with seal
Page No.-10<br />
I.D.T-1<br />
dk;kZy; ftyk eftLVªsV -----------------------------------------------------------------<br />
pfj= izek.k&i=<br />
1- vkosnd dk uke Jh@Jhefr -------------------------------------------------------------------------------<br />
-------------------------------------------------------<br />
2- firk@ifr dk uke Jh ---------------------------------------------------------------------------------------<br />
---------------------------------------------------------<br />
3- vk;q -------------------------------------------------------------------------------------------------------------------<br />
------------------------------------------------------------<br />
4- 'ksSf{kd ;ksX;rk<br />
rk--------------------------------------------------------------------------------------------------<br />
------------------------------------------------------------<br />
5- O;olk;------------------------------------------------------------------------------------<br />
---------------------------------------------------------------------------------------------------------------<br />
------------------------------------------------------------<br />
6- irk %&<br />
¼v½ LFkkbZ irk nwjHkk"k lfgr --------------------------------------------------------------------------------------------------------------<br />
----------------------------------------------------------------<br />
¼c½ vLFkkbZ irk nwjHkk"k lfgr -----------------------------------------------------------------------------------------------------------<br />
-----------------------------------------------------------------<br />
7- vkijkf/kd eqdneksa dk fooj.k ------------------------------------------------------------------------------------------------------------<br />
----------------------------------------------------------------<br />
¼O;fDr ds fo:) tuin esa ntZ eqdneksa] vkijkf/kd xfrfof/k;ksa vkSj vlkekftd dk;kZsa dk fooj.k<br />
fn;k tk;sA ;fn fdlh U;k;ky; esa vkijkf/kd eqdnek py jgk gS rks mldk fooj.k Hkh fn;k tk;s<br />
A ;fn flapkbZ foHkkx vFkok jkT; ljdkj ds vU; foHkkxksa Onkjk CySd fyLVSM fd;k x;k gks rks<br />
mldk fooj.k Hkh fn;k tk;s A ekfQ;k@xSaxsLVj xfrfof/k;ksa ,oa laxfBr vijk/kksa esa fyIr O;fDr;ksa<br />
ds ckjs esa fo'ks"k :i ls tkap djus ds ckn gh izek.k&i= fuxZr fd;k tk;s vkSj bldk mYys[k<br />
bl dkye esa vo'; fd;k tk;s A ½<br />
8- lkekU; [;kfr ------------------------------------------------------------------------------------------------------------------------------------<br />
------------------------------------------------------------------<br />
Signature of contractor with seal
9- Page No.-11<br />
izek.k&i= %&<br />
esjs }kjk Jh ------------------------------------------------------------<br />
ds dk;Z vkSj vkpj.k rFkk pfj= ds lEcU/k<br />
esa iwjh rF;kRed tkudkjh dj yh x;h gS A buds fo:) vkijkf/kd eqdneksa dh lwpuk Hkh iqfyl ls<br />
izkIr dh x;h gS A lHkh rF;ksa dh tkudkjh ds i'pkr eSa izekf.kr djrk gwWa fd Jh ------------------------------<br />
--------------- dk dk;Z vkSj vkpj.k rFkk pfj= mRre gS vkSj buds flapkbZ foHkkx esa vFkok jkT; ljdkj<br />
ds fdlh foHkkx esa Bsdsnkj dk dk;Z djus ij lkekU;r% vkifRr izrhr ugha gksrh gS A<br />
fnukad ----------------------------------<br />
-----<br />
gLrk{kj<br />
ftyk eftLVªsV@dysDVj<br />
¼eqgj lfgr½<br />
uksV %&<br />
1- ftyk eftLVªsV@dysDVj }kjk ;g izek.k&i= vius Loa; ds gLrk{kj ls fuxZr fd;k tk;sxk A mlds<br />
LFkku ij fdlh vU; vf/kdkjh }kjk izek.k&i= fuxZr ugha fd;k tk;sxk A<br />
2- izek.k&i= nsus ds iwoZ Z og vko';drkuqlkj ofj"B iqfyl v/kh{kd@iqfyl<br />
v/kh{kd@rglhynkj@,l0Mh0,e0@ vij ftykf/kdkjh vFkok fdlh vU; vf/kdkjh ls tkWap djkdj<br />
fjiksVZ izkIr dj ldrs gSa A<br />
3- lEcfU/kr O;fDr ls Lokks"k.kk 'kiFk&i= Hkh ys ldrs gSa A<br />
4- ;g izek.k&i= lkekU;r% nks o"kZ ds fy;s ekU; gksxk A ;fn blls iwoZ dksbZ vkijkf/kd kVuk gksrh<br />
gS vFkok izkFkhZ ds fo:) dksbZ vkijkf/kd eqdnek vkfn ntZ gksrk gS ;k og fdlh laxfBr vijk/k<br />
esa ;k ekfQ;k xfrfof/k;ksa esa ;k vlkekftd xfrfof/k;ksa esa idM+k tkrk gS rks iqfyl foHkkx dk<br />
;g mRrjnkf;Ro gksxk fd bldh lwpuk og ftyk eftLVªsV@dySDVj rFkk lEcfU/kr foHkkx ds<br />
vf/kdkfj;ksa dks nsxk vkSj izek.k&i= rRdky fujLr fd;k tk;sxk A<br />
5- bu izek.k i=ksa dh izfof"V ftykf/kdkjh dk;kZy; esa rFkk ofj"B iqfyl v/kh{kd@iqfyl v/kh{kd<br />
dk;kZy; esa ,d vyx jftLVj esa fof/kor vafdr dh tk;sxh vkSj fuxZr izek.k&i= dh ,d<br />
izekf.kr QksVksizfr jftLVj esa vo'; j[kh tk;sxh A<br />
6- bl izek.k&i= ds fuxZr djus vFkok fujLr djus ds lEcU/k easa vfUre fu.kZ; lEcfU/kr ftyk<br />
eftLVªsV@dysDVj dk gksxk A<br />
7- fuxZr izek.k&i= dh ,d dk;kZy; ; izfr ¼Office copy½ ofj"B iqfyl v/kh{kd@iqfyl v/kh{kd<br />
dk;kZy; esa vo'; j[kh tk;sxh vkSj ,d vyx jftLVj esa izfof"V vafdr dh tk;sxh ftlls<br />
fjdkMZ jgs A<br />
8- lEcfU/kr O;fDr }kjk ikliksVZ lkbt dk viuk uohure QksVksxzkQ] tks jktif=r vf/kdkjh }kjk<br />
izekf.kr gks] pfj= izek.k i= ds Åij fu/kkZfjr LFkku ij pLik fd;k tk;sxk A<br />
Signature of contractor with seal
Page No.-12<br />
I.D.T-2<br />
dk;kZy; ftyk eftLVªsV -----------------------------------------------------------------<br />
gSfl;r izek.k&i=]<br />
1- izkFkhZ dk uke ¼O;fDr@QeZ@laLFkk dk uke½--------------------------------------------------<br />
----------------------------------<br />
2- firk@ifr dk uke Jh----------------------------------------------------------------------------------<br />
-----------------------------------------<br />
3- fuokl LFkku %&<br />
¼v½ iwjk LFkkbZ irk nwjHkk"k lfgr --------------------------------------------------------------------------------------------------------<br />
---------------------------------<br />
¼c½ vLFkkbZ irk nwjHkk"k lfgr -------------------------------------------------------------------------------------------------------------<br />
--------------------------------<br />
4- O;olk; ---------------------------------------------------------------------------------------------------------------------------------------------------<br />
----------------------------------------<br />
5- lEifRr dk fooj.k %& ftyk eftLVªsV@dysDVj ds }kjk py@vpy lEifRr@gSfl;r ds lEcU/k<br />
esa iwjk fooj.k fuEu izdkj ls fn;k tk;s A<br />
¼A½ vpy lEifRr& tehu@Hkw[k.M@edku@nqdku@O;olkf;d izfr"Bku@m/kksx /kU/ks vkfn dk iwjk<br />
fooj.k A ;g lEifRr Bsdsnkj ds uke gS vFkok fdlh vU; O;fDr ds uke ls gS A bldk<br />
Li"V mYys[k fd;k tk;s A bl lEcU/k esa l{ke vf/kdkjh }kjk fuxZr izek.k&i= layXu<br />
fd;k tk; A lEifRr dk ewY;kadu@cktkj ewY; rFkk lEifRr cSad vFkok fdlh foRrh; f<br />
laLFkk<br />
esa ekxsZt gks rks mldk fooj.k Hkh fn;k tk; A<br />
¼AA½ py lEifRr& eksVj@okgu fuekZ.k dk;ksZa esa iz;qDr e'khuksa rFkk vU; py lEifRr dk iwjk fooj.k<br />
fn;k tk;s ;g lEifRr Bsdsnkj ds uke gS vFkok fdlh vU; O;fDr ds uke ls gS] bldk Li"V<br />
mYys[k fd;k tk; A bl lEcU/k esa l{ke vf/kdkjh }kjk fuxZr izek.k&i= layXu fd;k tk;A<br />
lEifRr dk ewY;kadu@cktkj ewY; fdruk gSA ;g lEifRr cSad vFkok fdlh foRrh; laLFkk esa ekxsZt<br />
gks rks mldk fooj.k Hkh fn;k tk; A<br />
Signature of contractor with seal
Page No.-13<br />
6-<br />
cSad vFkok foRrh; laLFkk esa dksbZ /kujkf'k gks rks blds fy;s cSad dk uke@[kkrk la[;k ,oa mlesa<br />
j[kh /kujkf'k dk fooj.k fn;k tk; A blds fy;s cSad vFkok foRrh; laLFkk Onkjk fuxZr izek.k&i=<br />
layXu fd;k tk; A<br />
7- gSfl;r izek.k&i= ds fy;s gSfl;r ds :i esa ;fn cSad easa tek /kujkf'k n'kkZ;h tkrh gS rks og<br />
/kujkf'k de ls de rhu ekg@igys ls cSad esa tek gksuh pkfg;s vkSj dk;Z iwjk gksus rd cSad esa<br />
vo'; tek jguh pkfg;s A<br />
8- izkFkhZ dk iSu uEcj-------------------------------------------------------------------------<br />
------------------------------------------------------------------------------------------------------------------<br />
gS A<br />
esjs }kjk Jh ¼;gka O;fDr@QeZ@laLFkk vkfn dk uke fy[kk tk;½----------------------------------------------------------<br />
------------ dh py vkSj vpy lEifRr ds ckjs esa rF;ksa dh tkudkjh dj yh x;h gS vkSj mldk k fooj.k<br />
mijksDrkuqlkj fn;k x;k gS A<br />
eSa izekf.kr djrk gwWa fd esjh tkudkjh easa mijksDr lHkh rF; lgh gSa vkSj rF;kRed fjiksVZ ds<br />
vk/kkj ij ;g izek.k&i= fuxZr fd;k tk jgk gS A<br />
fnukad----------<br />
-------------------<br />
-------<br />
gLrk{kj<br />
ftyk k eftLVªsV@dysDVj<br />
¼eqgj lfgr½<br />
Signature of contractor with seal
Sa<br />
Page No.-14<br />
I.D.T-3<br />
Lokks"k.kk 'kiFk&i=<br />
¼fufonk izi= ds lkFk 'kiFk i= ewy:i ls layXu fd;s tkus gsrq½<br />
esa -------------------------------------------------iq=h Jh------------------------------------------<br />
-----------------------------------------fuoklh<br />
¼LFkk;h irk½ --------------------------------------------------------------------------¼vLFkk;h irk½<br />
--------------------------------------------------------------dk fuoklh gw¡A eSa 'kiFkiwoZd fuEu<br />
kks"k.kk djrk gw¡A<br />
1- eSa flapkbZ foHkkx dk ,,@,@ch@lh@Mh@ Js.kh dk iathd`r Bsdsnkj gw¡@ugha gw¡A ¼foHkkx<br />
}kjk fuxZr Js.kh lEcU/kh izek.k i= layXu fd;k tk;s½ esjs ikl i;kZIr py vkSj vpy<br />
lEifRr gSA vkSj O;olkf;d :i ls eSa flapkbZ foHkkx ds dk;ksZ dks iwjk djus ds fy;s<br />
l{ke vkSj leFkZ gw¡A esjs ikl vko';d e'khusa vkSj midj.k vkfn Hkh gSA rFkk eq>s bl<br />
dk;Z dk i;kZIr vuqHko gSA<br />
2- flapkbZ foHkkx }kjk tks ¼dk;Z dk fooj.k fy[kk tk;s½---------------------------<br />
---------------------------djkus dh<br />
fufonk fuxZr dh xbZ gSA mlds fy;s eSa foHkkx }kjk fu/kkZfjr izk:i ij fufonk Hkj jgk<br />
gw¡A<br />
3- esjs }kjk fn;s tk jgs izek.k&i=@ pfj= izek.k&i=@ gSfl;r izek.k&i=@vk;<br />
izek.k&i=@ O;kikj dj izek.k&i= @chM lsD;ksfjVh izek.k&i=@chM dSfiflVh izek.k&i=@<br />
tekurk /kujkf'k vkfn dk izek.k&i= rFkk vU; lqlaxr vfHkys[k vkfn ewy :i esa<br />
fufonk i= ds lkFk layXu dj fn;s x;s gSA<br />
4- esjk iSu ua0---------------------<br />
---------------------gS rFkk vk;dj foHkkx }kjk iznRr uohure vk; dj<br />
izek.k&i= layXu gSA<br />
5- +esjs fo:) vijkf/kd eqdneks dk fooj.k fuEu izdkj gSA ;gka iwjk fooj.k fn;k<br />
tk;A<br />
• eqdnek ua0--------------------------<br />
-------------------------------------------<br />
• /kkjk;sa-----------------------------------------------------<br />
• Fkkuk ----------------------------------------------------<br />
• tuin--------------------------------------------------<br />
• U;k;ky; ¼tgka eqdnek pyjgk gS½--------------------------------<br />
--------------------------------------------------<br />
6- eSa flapkbZ foHkkx vFkok jkT; ljdkj ds vU; foHkkxksa }kjk CySd fyLVsM Bsdsnkj<br />
dh Js.kh esa ugh vkrk gw¡aA eSa vijkf/kd xfrfof/k;ksa] ekfQ;k rFkk xSaxsLVj xfrfof/k;ksa vkSj<br />
laxfBr vijk/k djus dh xfrfof/k;ks vkSj vlkekftd dk;ksZ vkfn esa fyIr f<br />
ugha gw¡A eSa<br />
ekfQ;k vkSj vijk/kh ugha gw¡ esjk pkypyu] dk;Z rFkk vkpj.k mRre gSA<br />
7- esjs fo:) tuin esa rFkk izns'k esa dksbZ Hkh eqdnek ntZ ugha gSA<br />
8- ;fn Bsdk izkIr djus ds i'pkr esjs fo:) ekfQ;k xfrfof/k;ksa @vlkekftd<br />
xfrfof/k;ksa ,oa laxfBr vijkf/kd xfrfof/k;ksa esa fyIr gksus ds ckjs esa dksbZ f'kdk;r<br />
izekf.kr ik;h tkrh gSA rks l{ke vf/kdkjh dks ;g vf/kdkj gksxk fd ;s esjk<br />
Bsdk@vuqcU/k fujLr dj nsa bl esa eq>s dksbZ vkifRr ugha gksxhA esjs }kjk ;fn<br />
foHkkx@jkT; ljdkj ds fo:) dksbZ vijkf/kd d`r fd;k tkrk gSA vFkok ljdkjh /ku dk<br />
xcu fd;k tkrk gSA rks l{ke vf/kdkjh dks ;g vf/kdkj gksxk fd og esjs fo:)<br />
vijkf/kd eqdnek fu;eksa ds vUrxZr ntZ djk;Sa<br />
SaSa<br />
Signature of contractor with seal
Page No.-15<br />
9- eSa vuqcU/k dh 'krkZsa ds vuqlkj le; ls iwjh xq.koRrk ds lkFk rFkk fu/kkZfjr<br />
fof'kf"V;ksa ds vuq:i dk;Z iwjk d:axk vkSj foHkkx dks iwjk lg;ksx iznku d:axkA<br />
10- esjk dk;Z ,oa vkpj.k mRre gSA<br />
11- eSa 'kiFk iwoZd kks"k.kk djrk gw¡ fd esjk LFkk;h irk vkSj vLFkk;h irk fuEu izdkj<br />
gS%&<br />
¼v½<br />
LFkk;h irk ¼nwjHkk"k lfgr½-------------------<br />
----------------------------------------------------------------------------------<br />
¼c½<br />
vLFkk;h irk ¼nwjHkk"k lfgr½-------------------------------------------------------------------------------<br />
¼;gk¡ iwjk irk nwjHkk"k lfgr ,oa fiu dksM lfgr fy[kk tk;½<br />
12- eSa 'kiFk iwoZd kks"k.kk djrk gw¡ fd eSa mijksDr irs ij jgrk gw¡ rFkk foHkkx iznku<br />
fd;s x;s dk;Z dks iwjk djus rd esjs fdlh irs esa lkekU;rk dksbZ ifjorZu ugha gksxkA<br />
;fn vifjgk;Z ifjfLFkfr;ksa esa fdlh irs esa ifjorZu gksrk gSA rks bldh lwpuk eSa rRdky<br />
vf/k'kklh vfHk;ark] flapkbZ foHkkx vkSj ftyk eftLVªsV@dysDVj dks nwaxkA<br />
13- eSa ;g Hkh kks"k.kk djrk gw¡ fd foHkkx ds ftl dk;Z ds fy;s esjs }kjk Bsdk fy;k<br />
tk jgk gSSA mlds lkis{k py ,oa vpy lEifRr dk gSfl;r izek.k&i= ftyk<br />
eftLVªsV@dysDVj ¼tuin dk uke fy[kk tk;½--------------<br />
-------------------------------------------<br />
-----------------------------}kjk izkIRk djds<br />
ewy:i ls layXu fd;k tk jgk gSA ;g Hkh kks"k.kk djrk gw¡ fd bl gSfl;r izek.k i=<br />
dk mi;ksx vU; dk;ksZa ds fy;s ugha fd;k tk;sxkA<br />
14- flapkbZ foHkkx ds fdlh Hkh voj vfHk;ark@lgk;d vfHk;ark@vf/k'kklh<br />
vfHk;ark@v/kh{k.k vfHk;ark ;k vU; fdlh LVkQ dk dksbZ Hkh ut+nhdh fj'rsnkj esjs @gekjs<br />
;gka lsokjr ugha gSA<br />
15- eSa ;k esjh QeZ@dEiuh ftlesa eSa Loa; funs'kd@ikVZuj@ekfydkuk gd gSA us dgha<br />
Hkh dk;Z fd;k gS] dHkh Hkh esjs uke ls tqM+h dEiuh ftlesa eSa funs'kd@ikVZuj jgk gw¡]<br />
Cysd fyLVsM ;k nhokfy;k kksf"kr ugha fd;k x;k gw¡A<br />
16- esjk iSu ua0--------------------------------------------------------------------------------------<br />
--------------------------------------------------------------------------------------gS rFkk vk;dj<br />
foHkkx ls uohure dj fu/kkZj.k o"kZ dk vk;dj izek.k&i= ¼QkeZ&16½ dh lR;kfir<br />
izfrfyfi layXu gSA<br />
17- eSa viuh iw.kZ tkudkjh esa iwjs gks'kksa&gok'k esa LoLFkfpRr ls iwjh lR;fu"Bk ls rFkk<br />
LosPNk ls ;g 'kiFk&i= fy[kdj ns jgk gw¡A bZ'oj esjh enn djsaA<br />
layXud& uohuru vk;dj fu/kkj.k o"kZ dk QkeZ&16<br />
fnukad----------------------------------<br />
'kiFkh dk iwjk gLrk{kj<br />
iwjk uke ------------------------------------------------------<br />
irk -------------------------------------------------------------<br />
-----------------------------------------------------------------------<br />
uksV& 1-<br />
;g Lokks"k.k k.k liFki= :0 100@& ¼:0,d lkS½ ds LVkEi isij ij uksVjh<br />
}kjk lk{;ksa dh mifLFkfr esa lR;kfir djrs gq;s fn;k tk;sxkA<br />
2- vlR; 'kiFk&i= nsuk ,d laxhu vkSj laKs; vijk/k gSA<br />
3- lEcfU/kr O;fDr }kjk ikliksVZ lkbt dk viuk QksVksxzkQ] tks jktif=r vf/kdkjh }kjk<br />
izekf.kr gks g<br />
'kiFk&i= ds Åij fu/kkZfjr LFkku ij pLik fd;k tk;sxkA<br />
Signature of contractor with seal
Page No.-16<br />
FORM 'A'<br />
FINANCIAL INFORMATION<br />
I. Financial Analysis - Details to be furnished duly supported by figures in balance<br />
sheet/profit and loss account for the last two years duly certified by the Chartered<br />
Accountant, as submitted by the applicant to the Income Tax <strong>Department</strong> (copies to be<br />
attached).<br />
Sl. No.<br />
1<br />
Particulars<br />
Gross Annual turnover on construction<br />
work (In Lac)<br />
Financial Year (Rupees in Lac)<br />
2007-08 2008-09<br />
2 Profit / Loss<br />
3 Certified by<br />
II. Financial arrangements for carrying out the proposed work.<br />
III. The following certificates are enclosed:<br />
(a) Current Income Tax clearance Certificate<br />
(b) copies of income tax Return in assessment year 2007-08, 2008-09.<br />
(c) Profit & loss account for financial year 2007-08, 2008-09.<br />
Signature of Chartered Accountant with seal<br />
Signature of contractor with seal
FORM 'B'<br />
DETAILS <strong>OF</strong> ALL <strong>WORK</strong>S <strong>OF</strong> SIMILAR NATURE COMPLETED DURING THE LAST TWO YEARS<br />
ENDING LAST DAY <strong>OF</strong>THE MONTH <strong>OF</strong> MARCH – 2009<br />
Remarks<br />
Name and<br />
address/<br />
telephone<br />
number of<br />
officer to<br />
whom<br />
reference<br />
may be<br />
made<br />
Litigation/<br />
Arbitration<br />
cases<br />
pending/<br />
in progress<br />
with<br />
details *<br />
Actual date<br />
of<br />
completion<br />
Stipulated<br />
date of<br />
completion<br />
Date of<br />
commenceme<br />
nt<br />
as per<br />
contract<br />
Cost of<br />
work in<br />
Lac<br />
Owner of<br />
sponsoring<br />
organization<br />
Name of<br />
work /<br />
project and<br />
location<br />
Sl.<br />
No.<br />
1 2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9 10<br />
* Indicate gross amount claimed and amount awarded by the Arbitrator.<br />
NOTE: Applicant may submit separate form for giving details of works (completed) for each year to fill up the details in col.<br />
1to10 as above. Separate sheet, if any, shall be numbered in sequence.<br />
Signature of contractor with seal<br />
Page No.-17
FORM 'C'<br />
Remarks<br />
Sl.<br />
No.<br />
PROJECT UNDER EXECUTION OR AWARDED<br />
Name and<br />
address/<br />
telephone<br />
number of<br />
officer to<br />
whom<br />
reference<br />
may be<br />
made<br />
Slow progress<br />
any and<br />
reasons<br />
thereof<br />
Up to Date<br />
percentage<br />
progress of<br />
work<br />
Stipulated<br />
date of<br />
completion<br />
Date of<br />
commenceme<br />
nt<br />
as per<br />
contract<br />
Cost of<br />
work in<br />
Lac<br />
Owner of<br />
sponsoring<br />
organization<br />
Name of<br />
work /<br />
project and<br />
location<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9 10<br />
1<br />
Certified that the above list of work is complete and no work has been left out and that the information given is correct to my<br />
knowledge and belief.<br />
Signature of contractor with seal<br />
Page No.-18
Page No.-19<br />
FORM 'D'<br />
PERFORMANCE REPORT <strong>OF</strong> <strong>WORK</strong>S REFERRED TO IN FORM "B" & "C"<br />
1.Name of work/Project & Location …………………………………………………………<br />
.<br />
2.Agreement No. ………………………………………………………………………………..<br />
3.Estimated Cost …………………………………………………………………….................<br />
4.Tendered Cost ………………………………………………………………………………..<br />
.<br />
5.Date of start …………………………………………………………………………………..<br />
6.Date of completion<br />
(i) Stipulated date of completion …………………………………………………………….<br />
(ii)Actual date of completion ………………………………………………………..............<br />
7.Amount of compensation levied for delayed completion, if any. …………………………..<br />
8.Amount of reduced rate items, if any. ………………………………………………………..<br />
9. Performance Report.<br />
Sl. No Description Performance<br />
01 Quality of works Very Good Good Fair Poor<br />
02 Financial soundness Very Good Good Fair Poor<br />
03 Technical Proficiency Very Good Good Fair Poor<br />
04<br />
Resourcefulness to complete<br />
the work in time<br />
Very Good Good Fair Poor<br />
05 General Behavior Very Good Good Fair Poor<br />
Dated:<br />
Signature of Executive Engineer or equivalent<br />
With seal<br />
#Note:-Certificate for each work completed/under execution shall be obtained as per<br />
FORM D”<br />
Signature of contractor with seal
1. Name & Address of the applicant:<br />
2. Telephone No./Telex No./Fax No.<br />
Page No.-20<br />
FORM "E"<br />
STRUCTURE & ORGANISATION<br />
3. Legal status of the applicant (attach copies of original document defining the legal<br />
status)<br />
(a) An individual<br />
(b) A proprietary firm<br />
(c) A firm in partnership<br />
(d) A limited company or Corporation<br />
4. Particulars of registration with various Government bodies (attach attested photocopy)<br />
Sl. No. Name of organisation Place of Registration Registration No.<br />
01<br />
02<br />
03<br />
04<br />
05<br />
5. Names and Titles of Director & Officers with designation to be concerned with this<br />
work:<br />
6. Designation of individuals authorised to act for the organisation<br />
7. Was the applicant ever required to suspend construction for a period of more than six<br />
months continuously after you commenced the construction If so, give the name of the<br />
project and reasons of suspension of work.<br />
Signature of contractor with seal
Page No.-21<br />
8. Has the applicant, or any constituent partner in case of partnership firm, ever<br />
abandoned the awarded work before its completion If so, give name of the project and<br />
reasons for abandonment.<br />
9. Has the applicant, or any constituent partner in case of partnership firm, ever been<br />
debarred / black listed for tendering in any organisation at any time If so, give details.<br />
10. Has the applicant, or any constituted partner in case of partnership firm, ever been<br />
convicted by a court of law If so, give details.<br />
11. In which fields of Civil Engineering construction the applicant has specialisation and<br />
interest<br />
12. Any other information considered necessary but not included above.<br />
Signature of contractor with seal
FORM 'F'<br />
DETAIL <strong>OF</strong> TECHNICAL & ADMINISTRATIVE PERSONNEL TO BE EMPLOYED FOR THE <strong>WORK</strong>S<br />
Assessmen<br />
t<br />
Year<br />
Income<br />
tax<br />
Circle<br />
Annual<br />
Salary<br />
Professional<br />
Experience and<br />
Details of work<br />
carried out<br />
Educational /<br />
Technical<br />
qualification<br />
No. available<br />
for this work<br />
Total<br />
No.<br />
Designation<br />
Name<br />
Sl.<br />
No<br />
.<br />
2008-09<br />
2007-08<br />
1 2<br />
3 4 5<br />
6<br />
7<br />
8 9 10 11<br />
Certified that the above list of work is complete and no work has been left out and that the information given is correct to my<br />
knowledge and belief.<br />
Signature of contractor with seal<br />
Page No.-22
FORM 'G'<br />
DETAIL <strong>OF</strong> CONSTRUCTION EQIPMENT AND MACHINERY LIKELY TO BE USED IN CARRYING<br />
OUT THE <strong>WORK</strong><br />
Ownership status<br />
No<br />
Name of Equipment<br />
Sl.<br />
No<br />
Remarks<br />
Current Location<br />
To be<br />
purchased<br />
Leased/Hired<br />
Presently<br />
owned<br />
Condition<br />
Age in years<br />
Capacity of type<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
Earth moving Equipment<br />
1. J.C.B. / Poclain etc.<br />
01<br />
Equipment for hoisting Lifting<br />
02<br />
Tower Crane<br />
1<br />
Builder Hoist<br />
2<br />
Equipment for concrete work<br />
03<br />
Concerete Batching Plant<br />
Concrete Pump<br />
1<br />
2<br />
Concrete Transit Mixer<br />
3<br />
Concrete Mixer ( Diesel)<br />
4<br />
Concrete Mixer (Electrical)<br />
5<br />
Needle vibrator (electric / Petrol)<br />
6<br />
Other (specify)<br />
7<br />
8<br />
Page no. 23 Signature of contractor with seal
Ownership status<br />
Remarks<br />
Current Location<br />
To be<br />
purchased<br />
Leased/Hired<br />
Presently<br />
owned<br />
Condition<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
Age in years<br />
5<br />
Capacity of type<br />
Sl.<br />
No<br />
1<br />
04<br />
Name of Equipment<br />
2<br />
Equipment for work<br />
1<br />
2<br />
3<br />
4<br />
4<br />
.Block making machine<br />
Bar bending machine<br />
Bar cutting machine<br />
Wood thickness planes<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
Drilling machine<br />
Circular saw machine<br />
Welding generators<br />
Welding transformers<br />
Cube testing machines<br />
M.S. pipes<br />
Steel shuttering<br />
Steel scaffolding<br />
Other’s<br />
Page No-24<br />
No<br />
3<br />
Signature of contractor with seal
Remarks<br />
11<br />
Ownership status<br />
Current Location<br />
To be purchased<br />
Leased/Hired<br />
Presently owned<br />
Condition<br />
6 7 8 9 10<br />
Age in years<br />
5<br />
Capacity of type<br />
Sl.<br />
No<br />
Name of Equipment<br />
4<br />
No<br />
1<br />
2<br />
3<br />
05<br />
Equipment for transportation<br />
1<br />
2<br />
Tippers<br />
Trucks<br />
06<br />
Dewatering Equipment<br />
1<br />
Pump (Diesel)<br />
Signature of contractor with seal<br />
2 Pump ( Electric)<br />
07 Power equipment<br />
1<br />
Diesel generators<br />
08<br />
Any other Plants /Equipment<br />
Note :- above list may be modified suitable by NIT approving authority<br />
Page no.-25
Page No.-26<br />
INVITATION FOR PREQUALIFICATION <strong>OF</strong> CONTRACTING AGENCIES<br />
S.E MADHYA GANGA CANAL CONSTRUCTION CIRCLE, BULANDSHAHR on<br />
behalf of Govt. of U.P invites Pre-qualification applications from reputed, qualified,<br />
experienced and financially sound Engineering construction agencies for<br />
1)Construction of Head cum cross regulator of Bahjoi branch and head<br />
regulator of Chandousi branch at the tail of Main canal of Madhya Ganga<br />
Canal Project Stage - II<br />
Estimated cost: Rs 590 Lac; Completion period: 18 months.<br />
The interested agencies are required to furnish the following documents for<br />
consideration of issue of “Pre -Qualification Document” :<br />
(a) Proof of registration with <strong>Irrigation</strong> Departmant U.P. IN CLASS ‘AA’<br />
b) Annual turnover as per ITCC or Profit & Loss statement for the last 2 years<br />
c) ‘PAN’<br />
d) VAT registration certificate;<br />
f) Performance Certificates;<br />
g) List of Technical staff they possess.<br />
i) List of construction equipment plants, machinery & infrastructure facilities they<br />
possess.<br />
Agencies fulfilling following criteria shall be eligible to participate:<br />
(a) Average Annual at one year turnover during last 2 years ending 31.03.2009 should<br />
be at least Rs.600 Lac<br />
(c) Experience of having successfully completed any of the following works in during<br />
last two years ending 31.03.2009<br />
(1) single Haudra Similar nature completed costing not less than Rs.500 Lac.<br />
(d) In the case of joint venture, credentials of each partner should be submitted for<br />
necessary assessment.<br />
(e) Not having incurred any loss during last 2 years during last 5 years ending<br />
31-3-2009.<br />
Note: Similar works means Construction of Aqueduct<br />
/Regulator/Hydraulic structure of the same nature with R.C.C.<br />
Drawings and other relevant documents can be seen in office of S.E., M.G.C.C.C.,<br />
Bulandshahr<br />
Pre qualification documents shall be issued upto 29.06.2009 between 11.30 TO 16.00 Hrs on<br />
all working days from the Office of S.E, Madhya Ganga Canal Construction Circle<br />
BulandShahr.<br />
Signature of contractor with seal
Page No.-27<br />
Cost of the document (non refundable) shall be Rs.-338/- (including all applicable<br />
Taxes) in cash if collected in person or by crossed Demand Draft drawn in favour of E.E.<br />
,M.G.C.C.D.-8, payable at BULANDSHAHR. Pre qualification documents if required by<br />
post shall be sent by Indian Speed Post only, at the agency’s risk, but they must be received<br />
up to 30/06/2009 (3.00 P.M). The documents shall be received in person only, up to<br />
15:00 hrs on 01/07/2009 in the Office of the S.E, M.G.C.C.C., and shall be opened at 3.30<br />
PM on 03/07/2009 by the committee constituted by C.E. Madhya Ganga canal Aligarh<br />
If any information furnished by the applicant is found incorrect at a later stage,<br />
they shall be liable to be debarred from tendering / taking up of work in U.P<br />
IRRIGATION. The <strong>Department</strong> reserves the right to verify the particulars furnished<br />
by the applicant independently and reject any application without assigning any<br />
reason and to restrict the list of pre-qualified contractors to any number deemed<br />
suitable in case too many applications are received satisfying the basic Pre-<br />
Qualification criteria. Short listing of the agencies shall be subject to thorough<br />
verification of their credentials and inspection of works carried out by them, through a<br />
Technical Evaluation Committee of experts, constituted by S.E, M.G.C.C.C.<br />
Signature of contractor with seal
Page No.-28<br />
CERTIFICATE BY THE AGENCY<br />
[a]. I/We certify that my firm/agency/company is not black listed / debarred by any<br />
Government <strong>Department</strong> / Organisation as on date.<br />
[b]. I/We certify that neither this firm/company/Agency nor any other entity with which the<br />
undersigned/any of the partners/ directors are/have been associated nor the said<br />
individually have ever been convicted for any offence by any court of law as on date.<br />
[c]. I/We certify that the U.P (I.D) has not terminated /cancelled any agreement with this<br />
Firm /agency / company or any other entity with which the undersigned/any of the<br />
partners/ directors are/have been associated, within last two years i.e. 2007-08, 2008-09,<br />
and till date.<br />
[d]. I/We certify that this firm/company/Agency has sufficient fund’s / trained manpower,<br />
machinery, T&P & Experienced engineer’s to execute this work satisfactorily.<br />
(Please strict off [a] or [b] or [c] whichever is not applicable for the Agency).<br />
This is to certify that I/We before signing this bid have carefully read the contents of the<br />
bid document & Visit the site of work and fully understood all the terms and conditions<br />
contained therein and undertake myself/ourselves to abide by the same.<br />
Signature of contractor with seal