UFO Service V2 Mar02 625-030.pdf

UFO Service V2 Mar02 625-030.pdf UFO Service V2 Mar02 625-030.pdf

printfinishing.com
from printfinishing.com More from this publisher
31.01.2015 Views

Section 17 SWING-UP PERFORATOR SERVICE Mounting Spindle Shoulder Bushes M 10 Nuts M 10 Bolt M 8 Nut Flats - Wrench Drive Gears Solid Hubs - Lower Lower Perforator Shaft Tyred Hubs - Upper Upper Perforator Shaft Swing-up Perforating Unit ......................................... Fig 17.11 17.2 .....Swing-up Perforating Unit - Dismantling Once the unit is off the machine, the perforator shafts can be removed from the unit. The shafts are removed by releasing the M8 nut whilst stopping the shafts rotating by using a 13mm wrench on the flats. With the M8 nuts removed, the shafts are passed through the unit sliding off all the hubs in the process. Upon re-assembly, fit the hubs correctly with the solid hubs on the lower shaft with their grub screws facing the drive side, and the tyred hubs on the upper shaft with their grub screws facing the operator side. PAGE 46 FOLDING

MANUAL CROSS-FOLD UNIT Section 18 Circuit Diagram Cross-fold Control Box ......................Fig 18.11 SYSTEMS PAGE 47

MANUAL<br />

CROSS-FOLD UNIT<br />

Section 18<br />

Circuit Diagram Cross-fold Control Box ......................Fig 18.11<br />

SYSTEMS PAGE 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!