MANUAL SIDE - LAY<br />
Section 4<br />
3.2 .......Vacuum Roller - Adjustment<br />
The grub screw should initially be lightly tightened opposite the<br />
suction choke. (see fig. 3.11)<br />
However, with the vacuum roller assembly fitted to the machine,<br />
the grub screw should be fully tightened so that the suction choke<br />
is in it's normal operating position (at the top) with the adjusting<br />
knob accessible, and without the vacuum hose trying to rotate the<br />
suction choke out of position.<br />
4.1 .......Side-Lay - Removal<br />
The side-lay is removed as follows:-<br />
Remove all the paper transport balls from their holders.<br />
Move the side-lay to the third position from the outside and tighten<br />
the screws.<br />
Raise the feed bed, disconnect the gas strut from the side frame,<br />
raise the feed bed further, and support the strut on the conveyor<br />
roller.<br />
Remove the two fixing screws (see fig.5.21 ), which secure each of<br />
the two roller retainer brackets.<br />
Lower the feed bed and release the two locating knobs on the top<br />
of the side-lay.<br />
The side-lay can now be lifted off the feed bed.<br />
With the side-lay indicators set to zero (‘0’), the gap between the<br />
floating and fixed side-lays should be 10mm and the stop screws<br />
should have the underside of their heads set 5mm from the face of<br />
the floating side-lay.<br />