31.01.2015 Views

UFO Service V2 Mar02 625-030.pdf

UFO Service V2 Mar02 625-030.pdf

UFO Service V2 Mar02 625-030.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MANUAL SIDE - LAY<br />

Section 4<br />

3.2 .......Vacuum Roller - Adjustment<br />

The grub screw should initially be lightly tightened opposite the<br />

suction choke. (see fig. 3.11)<br />

However, with the vacuum roller assembly fitted to the machine,<br />

the grub screw should be fully tightened so that the suction choke<br />

is in it's normal operating position (at the top) with the adjusting<br />

knob accessible, and without the vacuum hose trying to rotate the<br />

suction choke out of position.<br />

4.1 .......Side-Lay - Removal<br />

The side-lay is removed as follows:-<br />

Remove all the paper transport balls from their holders.<br />

Move the side-lay to the third position from the outside and tighten<br />

the screws.<br />

Raise the feed bed, disconnect the gas strut from the side frame,<br />

raise the feed bed further, and support the strut on the conveyor<br />

roller.<br />

Remove the two fixing screws (see fig.5.21 ), which secure each of<br />

the two roller retainer brackets.<br />

Lower the feed bed and release the two locating knobs on the top<br />

of the side-lay.<br />

The side-lay can now be lifted off the feed bed.<br />

With the side-lay indicators set to zero (‘0’), the gap between the<br />

floating and fixed side-lays should be 10mm and the stop screws<br />

should have the underside of their heads set 5mm from the face of<br />

the floating side-lay.<br />

SYSTEMS PAGE 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!