Project History<br />

• Original design was 2 phases<br />

• Drainage Study, pavement evaluation, then design for both<br />

• Discussions with Sponsor and funding agencies one design project (prelim<br />

and final together)<br />

• Runway Pavement Rehabilitation & Drainage Improvements Project<br />

• 3 Schedules of Work; ability to award independently<br />

• Schedule I – Pavement Rehab / Reconstruction<br />

• Schedule II – Runway Edge Lighting System Replacement<br />

• Schedule III – Airfield Drainage Improvements