South
South
South
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Project History<br />
• Original design was 2 phases<br />
• Drainage Study, pavement evaluation, then design for both<br />
• Discussions with Sponsor and funding agencies one design project (prelim<br />
and final together)<br />
• Runway Pavement Rehabilitation & Drainage Improvements Project<br />
• 3 Schedules of Work; ability to award independently<br />
• Schedule I – Pavement Rehab / Reconstruction<br />
• Schedule II – Runway Edge Lighting System Replacement<br />
• Schedule III – Airfield Drainage Improvements