South
South
South
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Project History<br />
• Original CIP identified need for<br />
2” maintenance overlay<br />
• Discussions with Sponsor<br />
identified the desire to embark<br />
on aggressive, multi-stage<br />
Airport expansion<br />
• Ultimate desire was 5,000’ long<br />
x75’ wide runway<br />
• Additional projects include<br />
power line relocation,<br />
obstruction removal, existing<br />
pavement rehab, runway and<br />
taxiway extension and a<br />
drainage improvements project