Summary<br />
• ~ 36,200 square yards of concrete placed on Runway (~9,600 cubic yards)<br />
• Weather days non-issue with concrete compared to reclamation<br />
• Contract time was extended due to two change order issues<br />
• New LED Runway Lights – believed to be first in SC on general aviation<br />
Airport<br />
• New underdrain pump system – believed to be first in SC of its kind<br />
• Concrete a huge success due to monetary feasibility, useful life and grade<br />
issues with Lowcountry site