Runway Pavement Rehab – Construction<br />

• Construction commenced November 15, 2010 – big benefit to construct<br />

concrete alternative<br />

• Contractors for Contracts 1 & 2 working simultaneously<br />

• Contractor mobilization & staging area<br />

• Demo of existing pipes and utilities under Runway<br />

• Installation of new drainage structures<br />

• Grade correction on existing pavements<br />

• Underdrain system<br />

• Concrete paving<br />

• Shoulder work and taxiway connectors<br />

• Finalize concrete ditches, pump station and grading