Designing processes - EMC Community Network
Designing processes - EMC Community Network Designing processes - EMC Community Network
Creating the User Interface 4. Select the specific process. 68 EMC Documentum xCelerated Composition Platform Version 1.6 Best Practices Guide
Creating the User Interface 5. Start the process from a search by selecting a document and then clicking the configured action button. The process starts with the selected document added as an attachment. Options for when a process starts When a process starts, there are also options for what appears next. You can show an initiate process template or you can show an electronic form in a package. A third option, calling a standard WDK component, does not use a form and is therefore not described here. Use an initiate process template The standard option when a process starts is to open an initiate process template. Each template is associated with a specific process and you can show process variables and use a package control to allow users to upload or select an existing document to be the package content. You can also further customize the template by adding additional controls. Use an electronic form in a package If you want a specific form as a package in the process, which appears when the process starts, you can use an electronic form in a package: 1. Create an electronic form and specify it with a Start Activity. 2. Open the Activity Inspector for the Start Activity in Process Builder, specify the electronic form with a package, and select to automatically launch the package. EMC Documentum xCelerated Composition Platform Version 1.6 Best Practices Guide 69
- Page 18 and 19: Planning and Designing the Applicat
- Page 20 and 21: Planning and Designing the Applicat
- Page 22 and 23: Planning and Designing the Applicat
- Page 24 and 25: Planning and Designing the Applicat
- Page 26 and 27: Planning and Designing the Applicat
- Page 28 and 29: Planning and Designing the Applicat
- Page 30 and 31: Creating the Data Model submitter_a
- Page 32 and 33: Creating the Data Model should occu
- Page 34 and 35: Designing the Process Defining acti
- Page 36 and 37: Designing the Process The transitio
- Page 38 and 39: Designing the Process 2. Add a seco
- Page 40 and 41: Designing the Process The end resul
- Page 42 and 43: Designing the Process To copy all v
- Page 44 and 45: Designing the Process because the i
- Page 46 and 47: Designing the Process 3. On the Tim
- Page 48 and 49: Designing the Process 48 EMC Docume
- Page 50 and 51: Designing the Process Inter-process
- Page 52 and 53: Designing the Process In the HTTP I
- Page 54 and 55: Designing the Process For the child
- Page 56 and 57: Designing the Process at or right a
- Page 58 and 59: Designing the Process Enabling repo
- Page 60 and 61: Designing the Process Performance a
- Page 62 and 63: Designing the Process 62 EMC Docume
- Page 64 and 65: Creating the User Interface mind th
- Page 66 and 67: Creating the User Interface Figure
- Page 70 and 71: Creating the User Interface Figure
- Page 72 and 73: Creating the User Interface Figure
- Page 74 and 75: Creating the User Interface Figure
- Page 76 and 77: Creating the User Interface Adaptor
- Page 78 and 79: Creating the User Interface Figure
- Page 80 and 81: Creating the User Interface 5. Spec
- Page 82 and 83: Creating the User Interface 1. Open
- Page 84 and 85: Creating the User Interface 11. In
- Page 86 and 87: Creating the User Interface Working
- Page 88 and 89: Creating the User Interface 88 EMC
- Page 90 and 91: Monitoring Business Activity • pu
- Page 92 and 93: Monitoring Business Activity (PRS).
- Page 94 and 95: Monitoring Business Activity • Us
- Page 96 and 97: Performance and Scalability System
- Page 98 and 99: Performance and Scalability Factors
- Page 100 and 101: Performance and Scalability Skill-s
- Page 102 and 103: Performance and Scalability
- Page 104 and 105: Performance and Scalability If regi
- Page 106 and 107: Performance and Scalability 106 EMC
- Page 108 and 109: Deploying the Application At deploy
- Page 110 and 111: Deploying the Application 110 EMC D
- Page 112 and 113: Archiving the Application • When
- Page 114 and 115: Archiving the Application b. Log in
- Page 116 and 117: Archiving the Application 5. Create
Creating the User Interface<br />
5. Start the process from a search by selecting a document and then clicking the configured action<br />
button. The process starts with the selected document added as an attachment.<br />
Options for when a process starts<br />
When a process starts, there are also options for what appears next. You can show an initiate process<br />
template or you can show an electronic form in a package. A third option, calling a standard WDK<br />
component, does not use a form and is therefore not described here.<br />
Use an initiate process template<br />
The standard option when a process starts is to open an initiate process template. Each template is<br />
associated with a specific process and you can show process variables and use a package control to<br />
allow users to upload or select an existing document to be the package content. You can also further<br />
customize the template by adding additional controls.<br />
Use an electronic form in a package<br />
If you want a specific form as a package in the process, which appears when the process starts, you can<br />
use an electronic form in a package:<br />
1. Create an electronic form and specify it with a Start Activity.<br />
2. Open the Activity Inspector for the Start Activity in Process Builder, specify the electronic form<br />
with a package, and select to automatically launch the package.<br />
<strong>EMC</strong> Documentum xCelerated Composition Platform Version 1.6 Best Practices Guide 69