Planning and <strong>Designing</strong> the Application<br />
then refine to avoid creating something that the client does not want. After the client is comfortable<br />
with the rough dashboard prototype, progress to more polished reports that were created in Process<br />
Reporting Services:<br />
Over time, the number of reports will grow and drill-downs and multi-drill-downs will be defined. You<br />
can create additional dashboard pages. Some reports can be moved from one page to another. This<br />
process is the normal, iterative process of designing BAM dashboards.<br />
Planning the Deployment<br />
During the planning phase, make note of any aspects of the system that can change when the<br />
application is transferred from the development environment to production. For example, databases<br />
used by the application generally change when moving to the production environment. Users assigned<br />
to specific activities can also be different in the production environment. It is important to compile a<br />
complete inventory of these items to use during deployment.<br />
Design Review<br />
At the end of the design phase, the project manager can schedule a design review to validate the<br />
design. This meeting can include architects and system experts who are not members of the solution<br />
project in addition to <strong>EMC</strong> engineers to ensure the technical feasibility of the proposed solution. The<br />
information gathered in the templates can be used as supporting materials to the solution design<br />
presented to the client for signature. This process reinforces the design direction the team has taken<br />
and justifies decisions made on the design. Following a successful design review with client sign-off,<br />
the project can move into the implementation/development phase.<br />
28 <strong>EMC</strong> Documentum xCelerated Composition Platform Version 1.6 Best Practices Guide