Running the Average Duration process<br />

3. Click Finish. You do not need to add a workflow description.<br />

4. Click the Tasks tab.<br />

5. Locate Activity-1 and double-click it.<br />

6. Click the Process Variables tab.<br />

7. Enter a number in the Value field. It can be any number you want. It is meant to represent<br />

average duration.<br />

8. Click Finish and then click OK. You are now ready to design a report that uses the average<br />

duration value you just entered.<br />

144 <strong>EMC</strong> Documentum xCelerated Composition Platform Version 1.6 Best Practices Guide