alternatives meet the goals and objectives of the ARC study corridor. An overview of the AA<br />
process was presented at a community meeting in September. In addition to the AA report,<br />
the City completed an Engineering Feasibility Report, preliminary capital cost estimates, and<br />
ridership analysis during the reporting period. The City plans to present the AA report findings<br />
to the Anaheim City Council in early October for a selection of a locally preferred alternative<br />
(LPA) to carry forward into the environmental clearance process. The locally preferred<br />
alternative (LPA) will also be presented by city staff to the <strong>OC</strong>TA Board in November.<br />
Status:<br />
Santa Ana / Garden Grove Project – Alternatives Analysis<br />
(AA), Draft Environmental Impact Report, and Draft<br />
Environmental Assessment nearing completion<br />
Contact:<br />
Kelly Hart, Rail<br />
(714) 560-5725<br />
Summary: The Santa Ana/Garden Grove Project Team completed the project’s draft AA and submitted<br />
the document to FTA for review and is nearing completion of the project’s Draft<br />
Environmental Assessment (EA)/EIR. The combined AA/EIR/EA report will be used to seek<br />
stakeholder and public input for the selection of a LPA. The project team conducted several<br />
meetings with the Federal Transit Administration (FTA) to discuss key project issues including<br />
the disposition of the historic Santa Ana River Bridge, which is located along the project’s<br />
alignment. The City also developed preliminary capital cost estimates for the project<br />
alternatives.<br />
Status:<br />
Bus and Station Van Extension Projects – Cooperative<br />
Agreements in Process<br />
Contact:<br />
Abbe McClenahan, Planning<br />
(714) 560-5673<br />
Summary: The Board approved a call for projects for Project S and it was issued on<br />
February 27, 2012. Four applications were received on April 26, 2012, and were evaluated<br />
using the Board-approved criteria. The applications were approved by the TAC on<br />
June 27, 2012, and by the Board on July 23, 2012. The cooperative agreements are in process<br />
and services are expected to begin in December.