Placentia Grade Separation – Construction Under Way<br />

Contact:<br />

Tresa Oliveri, Outreach<br />

(714) 560-5374<br />

Summary: The project located at Placentia Avenue RR crossing will separate the local street from railroad<br />

tracks in the City of Placentia by taking vehicular traffic under the railroad crossing. <strong>OC</strong>TA is<br />

overseeing construction, which continued during the quarter. Construction is approximately<br />

30 percent complete and the project is expected to be completed by late 2014.<br />

Status:<br />

Kraemer Grade Separation – Construction Under Way<br />

Contact:<br />

Tresa Oliveri, Outreach<br />

(714) 560-5374<br />

Summary: The project located at Kraemer Boulevard RR crossing will grade separate the local street from<br />

railroad tracks in the City of Placentia. <strong>OC</strong>TA is overseeing construction which continued<br />

during the quarter. Construction progress is approximately 30 percent complete and the<br />

project is expected to be completed by late 2014.<br />

Status:<br />

Tustin / Rose Grade Separation – Design Completion<br />

Contact:<br />

Rose Casey, Capital Projects<br />

(714) 560-5729<br />

Summary: The project located at Tustin Avenue/Rose Drive RR crossing will grade separate the local<br />

street from railroad tracks in the Cities of Placentia and Anaheim by building a bridge for<br />

vehicular traffic over the railroad crossing. <strong>OC</strong>TA will release the advertisement for<br />

construction in October 2012. Construction is anticipated to begin by summer 2013 and<br />

expected to be completed by early 2016.<br />

Status:<br />

Lakeview Grade Separation – Design Nearing Completion<br />

Contact:<br />

Rose Casey, Capital Projects<br />

(714) 560-5729<br />

Summary: The project located at Lakeview Avenue RR crossing will grade separate the local street from<br />

railroad tracks in the Cities of Anaheim and Placentia. <strong>OC</strong>TA staff has been finalizing the project<br />

plans, specifications, and estimate during the quarter. <strong>OC</strong>TA will release the advertisement for<br />

construction by spring 2013. Construction is anticipated to begin by fall 2013 and expected to<br />

be completed by late 2015. In addition, <strong>OC</strong>TA released a request for proposal seeking qualified<br />

firms for construction management services on July 23, 2012.<br />

Status: <strong>Orange</strong>thorpe Grade Separation – Advertised for<br />

Construction<br />

Contact:<br />

Rose Casey, Capital Projects<br />

(714) 560-5729<br />

Summary: The project located at <strong>Orange</strong>thorpe Avenue RR crossing will grade separate the local street