Status: I-5 (Avenida Pico and San Juan Creek Road) Segment –<br />
Final Design Under Way<br />
Contact:<br />
Rose Casey, Capital Projects<br />
(714) 560-5729<br />
Summary: <strong>OC</strong>TA continues final design during the quarter for improvements along the I-5 between<br />
Avenida Pico and San Juan Creek Road in the cities of San Clemente, Dana Point, and<br />
San Juan Capistrano. The project will widen I-5 to add an HOV lane in each direction and<br />
includes major interchange improvements to Avenida Pico (part of Project D). Final design is<br />
expected to be completed by early 2013 to mid-2014.<br />
PROJECT D<br />
I-5 / El Toro Road and I-5 / Ortega Highway Interchanges<br />
Status:<br />
I-5 / El Toro Road Interchange – Project Study<br />
Report (PSR) Under Way<br />
Contact:<br />
Charlie Larwood, Planning<br />
(714) 560-5683<br />
Summary: This quarter, the consultant team began the preparation of the draft PSR document. The<br />
project study team is awaiting the final alignment from the I-5 Widening Project (Project C) to<br />
finalize the draft PSR. The study is expected to be completed in early 2013.<br />
Status: I-5 / Ortega Highway Interchange –<br />
Construction to Start Soon<br />
Contact:<br />
Rose Casey, Capital Projects<br />
(714) 560-5729<br />
Summary: The California Department of Transportation (Caltrans) approved the construction contract on<br />
September 18, 2012 for the reconstruction of the interchange at SR-74 in San Juan Capistrano during<br />
the quarter. The project will reconstruct the SR-74 bridge over the freeway and improve local<br />
traffic flow along the SR-74 and Del Obispo Street, adjacent to the freeway. Construction is<br />
expected to start in October 2012.