30.01.2015 Views

11 - ericssonhistory.com

11 - ericssonhistory.com

11 - ericssonhistory.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig. <strong>11</strong><br />

gnalling for setting up a call between two<br />

ARB subscribers when the connection passes<br />

ough two transit centres ARM<br />

TxA A-subscriber's teleprinter and control unit<br />

TxB B subscriber's teleprinter and control unit<br />

A A-suhscribcr's line (single current)<br />

B<br />

C<br />

D<br />

E<br />

T<br />

K<br />

Z<br />

Trunk circuit between ARB and ARM<br />

Trunk circuit between the two transit<br />

centres ARM<br />

Trunk circuit between ARM and ARB<br />

B subscriber's line (single current)<br />

A-subscriber's tariff zone<br />

A-subscriber's class<br />

Tariff information signal<br />

1 Procecd-to-select signal<br />

1 Selection information, i.e. B subscriber's<br />

number<br />

3 B-subscriber's number preceded by A<br />

subscriber's class K<br />

4 The last three digits of the B subscriber's<br />

number and the class K of the A subscriber<br />

5 Time signal<br />

6 Answer-back trip signal<br />

B subscriber's answer-back<br />

Nl, N2 etc B subscriber's number<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!