30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

17. MINERAL RESOURCE AND MINERAL<br />

RESERVE ESTIMATES<br />

MINERAL RESOURCES<br />

SUMMARY<br />

The last publicly available NI 43-101 <str<strong>on</strong>g>technical</str<strong>on</strong>g> <str<strong>on</strong>g>report</str<strong>on</strong>g> and mineral resource estimate for <strong>the</strong><br />

Nechalacho <strong>deposit</strong> was completed by Scott Wils<strong>on</strong> RPA. The effective date for Scott Wils<strong>on</strong><br />

RPA’s resource estimate is July 29, 2010. Since that time, updated resource estimates have<br />

been released in two press releases (September 8, 2010 and January 27, 2011).<br />

The <str<strong>on</strong>g>technical</str<strong>on</strong>g> data used for <strong>the</strong> January 27, 2011 resource estimate was compiled, validated<br />

and evaluated by Aval<strong>on</strong>. Bill Mercer P.Geo. was <strong>the</strong> QP for this resource estimate. The<br />

January 2011 <str<strong>on</strong>g>technical</str<strong>on</strong>g> data was updated with new drill hole informati<strong>on</strong> and assays. Bill<br />

Mercer also validated this data set, Finley Bakker P.Geo. updated <strong>the</strong> wireframe and<br />

interpolated values for <strong>the</strong> fifteen REE elements (plus Zr, Nb, Ga, Hf, Th and Ta) into <strong>the</strong> block<br />

model.<br />

Aval<strong>on</strong> has summarized <strong>the</strong> January 27, 2011 resource estimate using a Net Metal Return<br />

(NMR) per t<strong>on</strong>ne cut-off value (Table 17-1). This is an ec<strong>on</strong>omic number ra<strong>the</strong>r than an oxide<br />

cut-off grade. The rati<strong>on</strong>ale behind this change in <strong>the</strong> cut-off parameter is explained fur<strong>the</strong>r<br />

under ‘Cut-Off Grade’. Detailed resource tables, including <strong>the</strong> individual rare earth oxide<br />

grades, are included at <strong>the</strong> end of this secti<strong>on</strong>. In additi<strong>on</strong> a TREO equivalent is also <str<strong>on</strong>g>report</str<strong>on</strong>g>ed. It<br />

is similar in sense to <strong>the</strong> NMR calculati<strong>on</strong> but ra<strong>the</strong>r than c<strong>on</strong>verting <strong>the</strong> various metals to a unit<br />

price it c<strong>on</strong>verts <strong>the</strong>m to an equivalent grade in TREO based <strong>on</strong> metal prices, recoveries etc.<br />

Technical Report 43-101 – March 13, 2011 Page 17-1<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!