12. SAMPLING METHOD AND APPROACH<br />

A comprehensive core logging and sampling protocol was established in time for <strong>the</strong> July 2007<br />

drilling program. This protocol has been strictly applied for all of <strong>the</strong> drilling programs since<br />

2007. In additi<strong>on</strong>, a comprehensive geo<str<strong>on</strong>g>technical</str<strong>on</strong>g> logging protocol was introduced at <strong>the</strong> start of<br />

<strong>the</strong> summer 2009 drill program.<br />

Drilling operati<strong>on</strong>s were supervised by J.C. Pedersen, P.Geo. Bruce Hudgins, P.Geo,<br />

maintained <strong>the</strong> geological database. Aval<strong>on</strong>’s Vice-President, Explorati<strong>on</strong>, Bill Mercer, Ph.D.,<br />

P.Geo. (Ontario), P. Geol (NWT), m<strong>on</strong>itored <strong>the</strong> QAQC and provided overall directi<strong>on</strong> <strong>on</strong> <strong>the</strong><br />

<strong>project</strong>. Finley Bakker, P. Geol. (BC), estimated <strong>the</strong> mineral resources.<br />

Core sizes range from BTW diameter for <strong>the</strong> initial 2007 drill program to NQ2 in <strong>the</strong><br />

winter/summer 2008 program, NQ2 or HQ in <strong>the</strong> 2009-2010 programs and up to PQ in <strong>the</strong> 2010<br />

program (Table 12-1).<br />

Table 12-1<br />

Drill Core Summary<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Date<br />

Number of<br />

Holes<br />

Total Metres<br />

Core Diameter<br />

July – October 2007 13 2,550 BTW<br />

January – May 2008 45 8,725 NQ2<br />

June – September 2008 27 5,565 NQ2<br />

February – May 2009 26 5,474 NQ2<br />

July – October 2009 44 9,098 HQ<br />

January - April 2010 33 7,970 HQ<br />

January - April 2010 10 3,428 HQ<br />

July – October 2010 41 11,512 HQ<br />

July – October 2010 22 4,676 PQ<br />

TOTAL 261 58,998<br />

Core is placed in standard wooden core boxes at <strong>the</strong> drill by <strong>the</strong> driller helper, with a wooden<br />

marker placed at <strong>the</strong> end of each core run marking <strong>the</strong> metreage from <strong>the</strong> surface. Throughout<br />

<strong>the</strong> BTW-NQ programs drill rods were imperial lengths of 10 feet, and core markers were written<br />

in feet <strong>on</strong> <strong>on</strong>e side of <strong>the</strong> wooden block, and using a metric c<strong>on</strong>versi<strong>on</strong> chart, written in metres<br />

<strong>on</strong> <strong>the</strong> opposite side of <strong>the</strong> block. The HQ drilling initially used both imperial and metric rods, so<br />

markers were in both feet and metres to ensure proper measurement. Imperial rods were used<br />

exclusively in <strong>the</strong> latter part of <strong>the</strong> 2009 drill program.<br />

Technical Report 43-101 – March 13, 2011 Page 12-1<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.