Foraco drill rig was added in February 2010. This rig was a Boyles 37A coring machine with<br />

1000 metres depth capacity drilling HQ core.<br />

To satisfy <strong>the</strong> resource estimati<strong>on</strong> requirements for <strong>the</strong> Basal Z<strong>on</strong>e (principally variography) an<br />

intercept spacing of 50 m horiz<strong>on</strong>tal was planned for Indicated Resources and an intercept<br />

spacing of 100 m was planned for Inferred Resources.<br />

It is likely that <strong>the</strong> <strong>project</strong> will require <strong>the</strong> delineati<strong>on</strong> of more than 15 years of resources in order<br />

to outline a number of years at overall grades higher than <strong>the</strong> average resource grade. It is<br />

known that higher grades of HREO are present in deeper intercepts of <strong>the</strong> Basal Z<strong>on</strong>e and<br />

c<strong>on</strong>sequently <strong>the</strong> drilling is c<strong>on</strong>centrating <strong>on</strong> those areas that are expected to give Basal Z<strong>on</strong>e<br />

intercepts at deeper levels.<br />

Results to date indicate that a sec<strong>on</strong>d z<strong>on</strong>e of significant Basal Z<strong>on</strong>e mineralizati<strong>on</strong> with<br />

encouraging HREO values is developing at <strong>the</strong> west end of L<strong>on</strong>g Lake (previously intercepted in<br />

drill holes L08-132 and L09-206 and now with drill hole L10-207). It is important to c<strong>on</strong>tinue to<br />

outline this resource area as it may influence development plans for <strong>the</strong> underground ramp<br />

locati<strong>on</strong>.<br />

Drilling has included two holes in each of Ring and Buck Lakes within <strong>the</strong> main proposed<br />

tailings area. In additi<strong>on</strong>, <strong>on</strong>e hole was drilled in Cressy Lake, which is a sec<strong>on</strong>dary tailings<br />

locati<strong>on</strong>. O<strong>the</strong>r drill plans relating to c<strong>on</strong>demnati<strong>on</strong> drilling include:<br />

• Three drill holes <strong>on</strong> <strong>the</strong> proposed airstrip<br />

• One drill hole <strong>on</strong> <strong>the</strong> proposed infrastructure (plant, etc) site<br />

• Three drill holes <strong>on</strong> <strong>the</strong> proposed ramp route<br />

This drilling program will c<strong>on</strong>tinue 2011.<br />

Technical Report 43-101 – March 13, 2011 Page 11-3<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.