• Preliminary screening<br />

• Envir<strong>on</strong>mental assessment<br />

• Envir<strong>on</strong>mental impact review (panel review)<br />

Aval<strong>on</strong> has now entered <strong>the</strong> envir<strong>on</strong>mental assessment process and completed initial scoping<br />

meetings with communities, as part of <strong>the</strong> process towards granting of permits required for<br />

producti<strong>on</strong>. As of <strong>the</strong> date of this <str<strong>on</strong>g>report</str<strong>on</strong>g>, <strong>the</strong> Terms of Reference for <strong>the</strong> <strong>project</strong> have been<br />

issued and <strong>the</strong> Developers Assessment Report is in preparati<strong>on</strong>. All public informati<strong>on</strong> with<br />

regards to <strong>the</strong> process is accessible <strong>on</strong> <strong>the</strong> Mackenzie Valley Envir<strong>on</strong>mental Impact Review<br />

Board (MVEIRB) website.<br />

Subsequent to <strong>the</strong> acquisiti<strong>on</strong> of <strong>the</strong> property, and completi<strong>on</strong> of community engagement<br />

meetings, Aval<strong>on</strong> applied to <strong>the</strong> MVLWB for an explorati<strong>on</strong> permit. A two year permit was<br />

granted effective July 2007. It was under this permit that <strong>the</strong> drilling programs in 2007 to <strong>the</strong><br />

present were c<strong>on</strong>ducted. The permit was renewed in July 2009 for a fur<strong>the</strong>r two years and an<br />

amendment granted including <strong>the</strong> operati<strong>on</strong> of two diam<strong>on</strong>d drills.<br />

Past explorati<strong>on</strong> <strong>on</strong> <strong>the</strong> Thor Lake property included underground bulk sampling, drilling and<br />

trenching. Accordingly, <strong>the</strong>re is little surface disturbance from explorati<strong>on</strong> activities. Apart from<br />

a trailer camp, miscellaneous buildings, a 60,000 gall<strong>on</strong> six tank farm, a tent camp and a core<br />

storage area located <strong>on</strong> <strong>the</strong> property, <strong>on</strong> Aval<strong>on</strong>’s acquisiti<strong>on</strong> of <strong>the</strong> property, <strong>the</strong>re were no<br />

o<strong>the</strong>r envir<strong>on</strong>mental liabilities left by past explorati<strong>on</strong> activities.<br />

Aval<strong>on</strong> has undertaken to reclaim and rehabilitate <strong>the</strong> sites from previous work at <strong>the</strong> T Z<strong>on</strong>e.<br />

The diesel fuel remaining in <strong>the</strong> tank farm has been c<strong>on</strong>sumed during Aval<strong>on</strong>’s recent<br />

explorati<strong>on</strong> activities. Aval<strong>on</strong> is now seeking ways to safely remove <strong>the</strong> tanks from <strong>the</strong> property<br />

or examining <strong>the</strong> possibility of repurposing <strong>the</strong> tanks for future activities. The trailer camp has<br />

been rehabilitated with three trailers taken to Yellowknife by barge and ice road to be scrapped<br />

and three trailers repurposed for <strong>the</strong> present activities at site. The company has also undertaken<br />

extensive general cleanup of material left from previous explorati<strong>on</strong> utilizing First Nati<strong>on</strong>s labour.<br />

Access to <strong>the</strong> underground workings has been barricaded and <strong>the</strong> mine workings allowed to<br />

flood. Warning fencing has also been installed around <strong>the</strong> ramp entrance. Rock dumps, with<br />

<strong>the</strong> excepti<strong>on</strong> of some highly mineralized material, have been reclaimed and utilized for<br />

c<strong>on</strong>structi<strong>on</strong> of a 300 m airstrip west of Thor Lake.<br />

Technical Report 43-101 – March 13, 2011 Page 4-4<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.