22. DATE AND SIGNATURE PAGE<br />

This <str<strong>on</strong>g>report</str<strong>on</strong>g> titled “Technical Report <strong>on</strong> <strong>the</strong> Nechalacho Deposit, Thor Lake Project, Northwest<br />

Territories, Canada” and dated March 13, 2011, was prepared by and signed by <strong>the</strong> following<br />

au<strong>thor</strong>s:<br />

Signed and Sealed<br />

Dated at Vancouver, BC<br />

March 13, 2011<br />

Finley Bakker, P.Geol.<br />

Senior Resource Geologist, Aval<strong>on</strong> Rare Metals Inc.<br />

Signed and Sealed<br />

Dated at Vancouver, BC<br />

March 13, 2011<br />

Brian Delaney, P.Eng.<br />

Senior Project Manager, Aval<strong>on</strong> Rare Metals Inc.<br />

Signed and Sealed<br />

Dated at Tor<strong>on</strong>to, Ontario<br />

March 13, 2011<br />

Bill Mercer, P.Geol.<br />

Vice President, Explorati<strong>on</strong>, Aval<strong>on</strong> Rare Metals Inc.<br />

Signed and Sealed<br />

Dated at Tor<strong>on</strong>to, Ontario<br />

March 13, 2011<br />

Dezhi Qi, P. Eng.<br />

Process Engineer, Aval<strong>on</strong> Rare Metals Inc.<br />

Technical Report 43-101 – March 13, 2011 Page 22-1<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.