30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20. RECOMMENDATIONS<br />

The au<strong>thor</strong>s of <strong>the</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g> recommend that Aval<strong>on</strong> advance <strong>the</strong> Thor Lake Project to <strong>the</strong><br />

Feasibility Study stage and c<strong>on</strong>tinue <strong>the</strong> NWT permitting process. Specific recommendati<strong>on</strong>s<br />

by area are as follows.<br />

Geology and Mineral Resources<br />

The au<strong>thor</strong>s make <strong>the</strong> following recommendati<strong>on</strong>s:<br />

• C<strong>on</strong>tinue explorati<strong>on</strong> drilling at <strong>the</strong> Nechalacho Deposit to define <strong>the</strong> new areas of<br />

mineralizati<strong>on</strong>.<br />

• C<strong>on</strong>tinue in-fill drilling to upgrade Indicated Resources to Measured Resources and<br />

upgrade Inferred Resources to Indicated Resources.<br />

• Drill additi<strong>on</strong>al drill holes at appropriate angles to assess <strong>the</strong> nature and significance of<br />

<strong>the</strong> sub-vertical structures since <strong>the</strong>se features may have an effect <strong>on</strong> <strong>the</strong> grade<br />

distributi<strong>on</strong> and c<strong>on</strong>tinuity, both of which may affect mining.<br />

Mining<br />

The au<strong>thor</strong>s make <strong>the</strong> following recommendati<strong>on</strong>s:<br />

• Revise <strong>the</strong> mine plan, and develop a new estimate of <strong>the</strong> mineral reserves based <strong>on</strong> this<br />

mineral resource estimate.<br />

• Complete a revisi<strong>on</strong> of <strong>the</strong> ec<strong>on</strong>omics of <strong>the</strong> <strong>deposit</strong> recognising <strong>the</strong> potential for a larger<br />

and higher grade Mineral Reserve.<br />

• Proceed to a full Project Feasibility Study.<br />

• The recommended budget is given in Table 20-1.<br />

Technical Report 43-101 – March 13, 2011 Page 20-1<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!