The sensitivity of <strong>the</strong> base case 8% NPV has been calculated for -20% to +20% variati<strong>on</strong>s in <strong>the</strong><br />

above noted parameters. The <strong>project</strong> NPV is most sensitive to metal price and recovery<br />

followed by foreign exchange rate, operating costs, capital costs and individual product<br />

c<strong>on</strong>stituent prices.<br />

The sensitivities are shown in Figure 18-19 and Table 18-57. The sensitivities to metallurgical<br />

recovery and head grade are identical to that of price (for all c<strong>on</strong>stituents combined) and are<br />

<strong>the</strong>refore plotted <strong>on</strong> <strong>the</strong> same line.<br />

Figure 18-19 Sensitivity Analysis<br />

Technical Report 43-101 – March 13, 2011 Page 18-138<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.