• No inflati<strong>on</strong> after 2014 (assumed commencement of producti<strong>on</strong>)<br />

• Average price per kg of product is US$11.91<br />

• TREO prices reflect premium for HREO’s in <strong>the</strong> product.<br />

• Revenue is 56% from TREO, 21% from Nb 2 O 5 , 20% from ZrO 2 and 3% from Ta 2 O 5.<br />

• An exchange rate of C$1.11/US$<br />

• Revenue is delayed by two m<strong>on</strong>ths after producti<strong>on</strong> at hydrometallurgical plant to<br />

account for delay in payment while product is shipped to markets.<br />

Costs<br />

• Pre-producti<strong>on</strong> capital of C$582 milli<strong>on</strong><br />

• Life of mine capital of C$900 milli<strong>on</strong><br />

• Average life of mine operating cost of C$267/t<br />

Taxes and Royalties<br />

• A 3% NSR royalty and an NWT royalty <strong>on</strong> profits<br />

• A federal tax rate of 15% and a territorial tax rate of 11.5%<br />

Technical Report 43-101 – March 13, 2011 Page 18-135<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.