Table 18-55 Hydrometallurgical Plant Costs<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Hydrometallurgical Plant Costs 1,000 tpd 2,000 tpd<br />

Labour 8,177,072 9,227,687<br />

Electrical Power 1,414,384 4,001,264<br />

Process Reagents 36,870,395 66,873,084<br />

Maintenance Parts 4,520,000 10,451,000<br />

Mill Overhead 300,000 440,000<br />

Tailings Allowance 260,456 520,912<br />

Total 51,542,307 91,513,947<br />

Cost per t<strong>on</strong>ne $141.21 $125.36<br />

ECONOMIC ANALYSIS<br />

A Cash Flow Projecti<strong>on</strong> has been generated from <strong>the</strong> Life of Mine producti<strong>on</strong> schedule and<br />

capital and operating cost estimates, and is summarized in Table 18-56. A summary of <strong>the</strong> key<br />

criteria is provided below.<br />

ECONOMIC CRITERIA<br />

Producti<strong>on</strong><br />

• Mineral Reserves of 12.01 Mt at a grade at an average NMR of C$534/t<br />

• Underground mining using a combinati<strong>on</strong> of cut and fill, and l<strong>on</strong>ghole stoping<br />

• Producti<strong>on</strong> of ore starting at 1,000 tpd in year <strong>on</strong>e and ramping up to 2,000 tpd in year<br />

four<br />

• Two years of c<strong>on</strong>structi<strong>on</strong> followed by 18 years of mine life<br />

• Producing a bulk flotati<strong>on</strong> c<strong>on</strong>centrate c<strong>on</strong>taining REO, ZrO2, Ta2O5 and Nb2O5 at<br />

Thor Lake<br />

• Barging 130,000 t<strong>on</strong>nes of c<strong>on</strong>centrate (at full producti<strong>on</strong>) across <strong>the</strong> Great Slave Lake<br />

to Pine Point annually in <strong>the</strong> summer<br />

• Hydrometallurgical extracti<strong>on</strong> of TREO, ZrO2, Ta2O5 and Nb 2 O 5 at Pine Point<br />

Revenue<br />

• C<strong>on</strong>centrati<strong>on</strong> and Hydrometallurgical recoveries as indicated by testwork<br />

• Metal price:<br />

• Independent, third-party forecasts for 2014, based <strong>on</strong> supply and demand <strong>project</strong>i<strong>on</strong>s<br />

from 2009 to 2014<br />

Technical Report 43-101 – March 13, 2011 Page 18-134<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.