Table 18-54 Pine Point Surface Plant Costs<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Pine Point Surface Plant Costs 1,000 tpd 2,000 tpd<br />

Water Supply 12,000 18,000<br />

Sewage 6,000 6,000<br />

Heating System 6,000 6,000<br />

Plant Services 98,400 98,400<br />

Safety and First Aid 18,000 18,000<br />

Plant Operati<strong>on</strong> – O<strong>the</strong>r 24,000 24,000<br />

Plant Supervisi<strong>on</strong> 82,239 82,239<br />

Small Tools 12,000 12,000<br />

Building and Installati<strong>on</strong>s 30,000 30,000<br />

Heavy Equipment 120,000 120,000<br />

Light Vehicles 60,000 60,000<br />

Compressors 60,000<br />

Labour Costs 722,308 722,308<br />

Total 1,250,947 1,196,947<br />

Cost per t<strong>on</strong>ne $3.43 $1.64<br />

Hydrometallurgical Plant<br />

The hydrometallurgical plant operating costs are estimated to be as shown in Table 18-55.<br />

Technical Report 43-101 – March 13, 2011 Page 18-133<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.