O<strong>the</strong>r supplies and freight will be handled as large cargo <strong>on</strong> deck or in standard sea c<strong>on</strong>tainers<br />

for shipment to Thor Lake.<br />

Pine Point Administrati<strong>on</strong><br />

The Pine Point administrati<strong>on</strong> costs cover <strong>the</strong> Pine Point site administrati<strong>on</strong> functi<strong>on</strong>s such as<br />

payroll and payables will be shared between <strong>the</strong> two sites and that receivables would be<br />

handled by staff at Pine Point. Employee transportati<strong>on</strong> cost allowances are included for daily<br />

transportati<strong>on</strong> between <strong>the</strong> site and Fort Resoluti<strong>on</strong> and Hay River as <strong>the</strong>re is no<br />

accommodati<strong>on</strong> planned for <strong>the</strong> Pine Point site. Health and safety and envir<strong>on</strong>ment are also<br />

included in <strong>the</strong> site administrati<strong>on</strong>. The annual budget estimate is shown in Table 18-53.<br />

Table 18-53 Pine Point Administrati<strong>on</strong> Costs<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

1,000 tpd 2,000 tpd<br />

Administrati<strong>on</strong> Labor 794,683 791,389<br />

Administrative Services 648,000 552,000<br />

Warehouse Labour 242,979 242,979<br />

Freight 60,000 60,000<br />

Total 1,745,662 1,646,368<br />

Cost per t<strong>on</strong>ne $4.78 $2.26<br />

Pine Point - Surface<br />

The Pine Point surface costs include <strong>the</strong> operati<strong>on</strong> and maintenance of <strong>the</strong> surface facilities and<br />

<strong>the</strong> maintenance and operati<strong>on</strong> of <strong>the</strong> surface equipment for <strong>the</strong> maintenance of roads and<br />

movement of materials and supplies. The annual Pine Point surface budget is shown in Table<br />

18-54.<br />

Technical Report 43-101 – March 13, 2011 Page 18-132<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.