Table 18-52 Summer Freight Costs<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

1,000 tpd 2,000 tpd<br />

Surface Costs of Freight Handle 525,720 1,051,440<br />

Board 24,000 48,000<br />

Barging 2,645,438 5,290,876<br />

Set up 66,200 66,200<br />

Extra Time for Barge to Fuel 224,188 373,646<br />

Annual Dock Installati<strong>on</strong> and<br />

Removal<br />

600,917 600,917<br />

Total 4,086,462 7,431,078<br />

Cost per t<strong>on</strong>ne $11.20 $10.18<br />

The surface costs at Thor Lake include <strong>the</strong> costs to move full c<strong>on</strong>tainers from <strong>the</strong> mill to a yard<br />

at Great Slave Lake and <strong>the</strong>n load <strong>the</strong>m <strong>on</strong>to <strong>the</strong> barges. Empty c<strong>on</strong>tainers at Thor Lake are<br />

unloaded to a yard at Great Slave Lake and <strong>the</strong>n hauled by truck to <strong>the</strong> mill site. The process is<br />

reversed at Pine Point but in each case <strong>the</strong> c<strong>on</strong>tainers must be loaded or offloaded from <strong>the</strong><br />

barges, moved to a temporary locati<strong>on</strong> near <strong>the</strong> dock and <strong>the</strong>n rehandled by loading <strong>on</strong>to a<br />

truck for relocati<strong>on</strong> to <strong>the</strong> plant site. This work will be seas<strong>on</strong>al but will require heavy lift forklifts<br />

and transport trucks at both Pine Point and Thor Lake.<br />

At 1,000 tpd and based <strong>on</strong> <strong>the</strong> forecast c<strong>on</strong>centrate producti<strong>on</strong> <strong>the</strong>re will be 12 barge trips per<br />

seas<strong>on</strong>. Based <strong>on</strong> a cycle time of 32 hours for sailing and docking with a 20% c<strong>on</strong>tingency <strong>on</strong><br />

<strong>the</strong> time <strong>the</strong>re will be 19 days of sailing time per seas<strong>on</strong> plus an estimated six days of standby<br />

for wea<strong>the</strong>r delays. Barge costs are based <strong>on</strong> charter rates of C$27,500 per day for <strong>the</strong> tug and<br />

C$3,000 per barge per day. It is estimated that with <strong>the</strong> barges serving as docks <strong>the</strong>re will be<br />

19 barges under charter. The barge costs of C$2.65 milli<strong>on</strong> per seas<strong>on</strong> include C$1.64 milli<strong>on</strong><br />

for operating charter time, C$0.43 milli<strong>on</strong> for standby and delays and C$0.50 milli<strong>on</strong> for annual<br />

mobilizati<strong>on</strong> of <strong>the</strong> barges and tug.<br />

In additi<strong>on</strong> <strong>the</strong> extra travel for fuel trips will add C$224,000 per seas<strong>on</strong> and <strong>the</strong> delivery and set<br />

up of <strong>the</strong> barge docks at Pine Point and Thor Lake will cost C$600,000 per year. Fuel will come<br />

in <strong>on</strong> barges loaded at Hay River, this will require an extra leg <strong>on</strong> several voyages per seas<strong>on</strong> to<br />

go from Pine Point to Hay River for fuel. At Thor Lake <strong>the</strong> fuel will be offloaded to storage tanks<br />

at Great Slave Lake. From <strong>the</strong>re <strong>the</strong> fuel will be hauled by fuel trucks to <strong>the</strong> main storage tank<br />

farm at Thor Lake. It is estimated <strong>the</strong> barges can take approximately two milli<strong>on</strong> litres of fuel<br />

each so that 6 milli<strong>on</strong> litres can be brought in at a time.<br />

Technical Report 43-101 – March 13, 2011 Page 18-131<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!