30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 18-49 REO Shipping to Chicago<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$/t<br />

Pine Point to Hay River 5.00<br />

Load in Hay River<br />

In operating costs<br />

Rail to Chicago 126.56<br />

Bags 12.00<br />

Pallets 12.00<br />

Cost per t<strong>on</strong>ne of product to Chicago 155.56<br />

For tantalum <strong>the</strong> shipping is planned to be in 205 l steel drums. The costs of <strong>the</strong> drums is<br />

C$150 per t<strong>on</strong>ne of tantalum product and it is estimated that <strong>the</strong>re will be five pallets per t<strong>on</strong>ne<br />

for a cost of C$60/t product. The total shipping cost of <strong>the</strong> tantalum is estimated to be C$931<br />

per t<strong>on</strong>ne of product as shown in Table 18-50.<br />

Table 18-50 Tantalum Shipping to China<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$/t<br />

Pine Point to Hay River 5.00<br />

Load in Hay River<br />

In operating cost<br />

Rail to Vancouver 91.47<br />

Barrels 750.00<br />

Pallets 60.00<br />

Transfer in Vancouver 10.00<br />

Sea Freight 15.00<br />

Cost per t<strong>on</strong>ne of product 931.47<br />

Scott Wils<strong>on</strong> RPA notes that <strong>the</strong>se costs are subject to revisi<strong>on</strong> as sales c<strong>on</strong>tracts are made<br />

and as rates for shipping are negotiated with suppliers.<br />

Power – Thor Lake<br />

Power for <strong>the</strong> Thor Lake site will be generated with diesel units, <strong>the</strong> operating costs are based<br />

<strong>on</strong> <strong>the</strong> generati<strong>on</strong> of 0.27 kW-hr of electrical power per litre of fuel and <strong>the</strong> installati<strong>on</strong> of power<br />

factor management facilities to run a power factor near unity. The annual power generati<strong>on</strong><br />

operating costs are shown in Table 18-51. With six engines installed and <strong>the</strong>ir use rotated,<br />

Technical Report 43-101 – March 13, 2011 Page 18-129<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!