Table 18-45 Sales and Marketing Costs<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

1,000 tpd<br />

C$ pa<br />

2,000 tpd<br />

C$ pa<br />

Administrati<strong>on</strong> Staff incl.O/H 220,580 285,191<br />

Travel and Communicati<strong>on</strong>s 318,000 318,000<br />

Warehouse Staff incl. O/H 169,749 169,749<br />

Freight 3,755,120 7,183,579<br />

Total 4,463,449 7,956,519<br />

Cost per t<strong>on</strong>ne $12.23 $10.90<br />

A summary of <strong>the</strong> product shipping costs is shown in Table 18-46. The costs are based up<strong>on</strong><br />

<strong>the</strong> average c<strong>on</strong>centrate t<strong>on</strong>nages planned to be generated from <strong>the</strong> plant at Pine Point. The<br />

costs are based <strong>on</strong> shipping by truck to Hay River where all products will be transferred to rail<br />

cars for shipping to ei<strong>the</strong>r Vancouver or Chicago by rail. Chicago is c<strong>on</strong>sidered to be <strong>on</strong>e of <strong>the</strong><br />

delivery points fro this analysis. Products shipped to Vancouver will be repackaged in c<strong>on</strong>tainers<br />

for shipment by sea to China. For <strong>the</strong> purpose of this study it was assumed that he ZrO 2 would<br />

go to Chicago and <strong>the</strong> REO products will go to China. The REO, niobium and ZrO 2 will be<br />

packaged in plastic supersacks while <strong>the</strong> tantalum will be packaged in 205 l steel drums. All<br />

products will be palletized at Pine Point.<br />

Rail shipping costs are based <strong>on</strong> CN quoted rates from Hay River to ei<strong>the</strong>r Chicago or<br />

Vancouver. There is no plan to re-establish <strong>the</strong> rail line c<strong>on</strong>necting Pine Point and Hay River.<br />

Load limits are applicable to <strong>the</strong> nor<strong>the</strong>rn secti<strong>on</strong> of <strong>the</strong> rail line in <strong>the</strong> summer seas<strong>on</strong>. In <strong>the</strong><br />

summer <strong>the</strong> allowable load per rail car is estimated to be 63.9 t while in winter this rises to 85.7 t<br />

for an annual average of 73 t per rail car. The load limits are summarized in Table 18-47.<br />

Technical Report 43-101 – March 13, 2011 Page 18-126<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.