Mill<br />

Mill operating costs were estimated by Melis and are summarized below in Table 18-42. The<br />

mill operating cost details are discussed in more detail in <strong>the</strong> memorandum by Melis. For <strong>the</strong><br />

operating cost estimate, Scott Wils<strong>on</strong> RPA deducted <strong>the</strong> power cost from <strong>the</strong> estimate by Melis<br />

and included <strong>the</strong> power costs as a single budget line item. Scott Wils<strong>on</strong> RPA also added an<br />

allowance for <strong>the</strong> NWT payroll tax which has not been included by Melis.<br />

Table 18-42 Mill Cost Details<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Notes:<br />

1,000 tpd 2,000 tpd<br />

C$ pa C$ pa<br />

Mill Labour 5,175,970 5,869,695<br />

Reagents 3,573,350 7,168,600<br />

Comminuti<strong>on</strong> Media 1,865,150 3,723,000<br />

Maintenance C<strong>on</strong>sumables Allowance 1,058,500 1,394,300<br />

Total 11,672,970 18,155,595<br />

Cost per t<strong>on</strong>ne $31.98 $24.87<br />

1. The estimated operating costs are based <strong>on</strong> <strong>the</strong> listed line items identified to <strong>the</strong> level of detail available for<br />

<strong>the</strong> pre-feasibility. The accuracy of <strong>the</strong> operating cost estimate is c<strong>on</strong>sidered at a pre-feasibility level <strong>on</strong>ly in<br />

keeping with <strong>the</strong> +/- 25% level of accuracy of <strong>the</strong> overall pre-feasibility study.<br />

2. The operating pers<strong>on</strong>nel costs are based <strong>on</strong> <strong>the</strong> minimum number of operating and maintenance pers<strong>on</strong>nel<br />

required to operate <strong>the</strong> facility using experienced workers, and <strong>on</strong> salaries provided by Aval<strong>on</strong>.<br />

3. The reagent and comminuti<strong>on</strong> media costs, based <strong>on</strong> first quarter 2010 budget pricing obtained from<br />

suppliers, include an operating period freight cost from Edm<strong>on</strong>t<strong>on</strong> to Thor Lake site of $90/t<strong>on</strong>ne provided by<br />

Aval<strong>on</strong>.<br />

4. The reagent costs are based <strong>on</strong> average mid-range c<strong>on</strong>sumpti<strong>on</strong>s provided by Aval<strong>on</strong>. The minimum and<br />

maximum ranges provided in this <str<strong>on</strong>g>report</str<strong>on</strong>g> imply that <strong>the</strong> reagent cost is more appropriately noted as<br />

$9.79/t<strong>on</strong>ne ± $2.50/t<strong>on</strong>ne.<br />

5. Two percent of capital cost of equipment, excluding crushers, grinding mills, screens and building.<br />

6. Based <strong>on</strong> electrical power cost of $0.22/kWh at <strong>the</strong> Thor Lake site (Dennis Bergen email dated January 26,<br />

2010; this cost was adjusted slightly upward to $0.228/kWh at <strong>the</strong> May 5, 2010 review meeting which brings<br />

<strong>the</strong> $14.55/t<strong>on</strong>ne power cost up to $15.08/t<strong>on</strong>ne, an increase of $0.53/t<strong>on</strong>ne).<br />

7. The operating power was estimated at an average of 54% of peak power demand. Every 5% increase in <strong>the</strong><br />

average operating power would increase <strong>the</strong> operating cost by $1.35/t<strong>on</strong>ne.<br />

8. Heating is assumed to be provided by waste heat from power generati<strong>on</strong> and process equipment.<br />

Technical Report 43-101 – March 13, 2011 Page 18-123<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.