Table 18-41 Mine Cost Details<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

1,000 tpd 2,000 tpd<br />

C$ pa C$ pa<br />

Ore Drift Advance 1,924,000 996,000<br />

Ore Slashing 1,948,676 1,296,000<br />

L<strong>on</strong>g Hole Mining 1,176,000<br />

Raising 39,600 39,600<br />

Backfill 5,990,400<br />

Mine Rescue Training 12,000 12,000<br />

Safety Supplies 12,000 24,000<br />

Supervisi<strong>on</strong> 966,242 978,242<br />

Engineering and Survey 765,332 873,683<br />

Geology and Grade C<strong>on</strong>trol 522,754 1,033,508<br />

Mine Services 1,318,920 2,101,253<br />

Mine Labour 5,401,154 6,237,284<br />

Jackleg and Stoper Drills 12,000 18,000<br />

Jumbos 120,000 240,000<br />

Jumbo Drills 60,000 120,000<br />

Scooptrams 180,000 540,000<br />

Trucks 180,000 360,000<br />

O<strong>the</strong>r Mobile Equipment 60,000 240,000<br />

Small Power Tools 12,000 24,000<br />

Fans 12,000 24,000<br />

Pumps 36,000 48,000<br />

Pipe, Hoses and Fittings 24,000 36,000<br />

Ventilati<strong>on</strong> Supplies 12,000 24,000<br />

Mine Electricals 60,000 60,000<br />

Maintenance Shop 2,154,690 3,475,454<br />

Unallocated Labour Costs 175,071 224,607<br />

Total 16,008,440 26,192,031<br />

Cost per t<strong>on</strong>ne $43.85 $35.87<br />

Technical Report 43-101 – March 13, 2011 Page 18-122<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.