The annual mine budget estimate is shown in Table 18-41.<br />

Within <strong>the</strong> cash flow estimate <strong>the</strong> mine operating costs for <strong>the</strong> first year of operati<strong>on</strong>s were<br />

reduced by C$1.4 milli<strong>on</strong> to recognize <strong>the</strong> 49,000 t<strong>on</strong>nes of ore to be mined in <strong>the</strong> preproducti<strong>on</strong><br />

period.<br />

Paste fill placement is included in <strong>the</strong> mine costs at a cement additi<strong>on</strong> rate of 4% and a cost of<br />

C$260 /t of cement delivered to <strong>the</strong> site. The annual cement requirement is forecast to be<br />

23,000 t<strong>on</strong>nes. This will require 1,100 standard 20’ c<strong>on</strong>tainers with 2 t<strong>on</strong>ne bags of cement.<br />

Technical Report 43-101 – March 13, 2011 Page 18-121<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.