Table 18-40 Underground Mine Cost Summary<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

1,000 tpd 2,000 tpd<br />

C$ pa C$ pa<br />

Development 1,963,600 1,035,600<br />

Stoping 1,948,676 2,472,000<br />

Backfill 0 5,990,400<br />

Mine G&A<br />

Engineering 765,332 873,683<br />

Geology 522,754 1,033,508<br />

Supervisi<strong>on</strong> 978,242 990,242<br />

Labour 5,576,225 6,461,891<br />

Fuel 1,318,920 2,101,253<br />

Equipment and Supplies 2,934,690 5,233,454<br />

Total 16,008,440 26,192,031<br />

Cost per t<strong>on</strong>ne $43.85 $35.87<br />

The key mine supplies are explosives, ground support, fuel and propane for mine air heat. Mine<br />

power costs are included in <strong>the</strong> overall power cost estimate for <strong>the</strong> site which is described<br />

below.<br />

Explosives costs are based <strong>on</strong> <strong>the</strong> use of ANFO as <strong>the</strong> main explosive with an allowance of<br />

10% for packaged slurry explosives and <strong>the</strong> use of N<strong>on</strong>el det<strong>on</strong>ators. Explosive usage is<br />

estimated to be 0.8 kg/ t<strong>on</strong>ne.<br />

Diesel fuel costs were estimated from <strong>the</strong> estimated hourly c<strong>on</strong>sumpti<strong>on</strong> for <strong>the</strong> prime<br />

underground units coupled with an estimate of <strong>the</strong> annual operating hours. Fuel c<strong>on</strong>sumpti<strong>on</strong><br />

was estimated to be 820,000 litres per year in <strong>the</strong> underground mine at 1,000 tpd and 1.3 milli<strong>on</strong><br />

litres per year at 2,000 tpd.<br />

Propane for mine air heating was estimated based up<strong>on</strong> <strong>the</strong> annual average temperatures and<br />

<strong>the</strong> use of mine air heating to bring <strong>the</strong> intake air to 35 degrees F for those m<strong>on</strong>ths where <strong>the</strong><br />

average annual temperature is below freezing. The propane cost was estimated as C$0.43 per<br />

litre. The annual c<strong>on</strong>sumpti<strong>on</strong> for mine air heating is estimated to be 1.5 milli<strong>on</strong> litres at 1,000<br />

tpd and 2.2 milli<strong>on</strong> litres per year at 2,000 tpd.<br />

Salary and wages have been included as single line items and have not been allocated to <strong>the</strong><br />

various activities in <strong>the</strong> mine.<br />

Technical Report 43-101 – March 13, 2011 Page 18-120<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.