OPERATING COST ESTIMATE<br />

An operating cost estimate has been compiled for all phases of <strong>the</strong> <strong>project</strong> by Scott Wils<strong>on</strong> RPA<br />

(2010). The estimate was compiled from work by Melis (flotati<strong>on</strong> plant costs and<br />

hydrometallurgical plant capital cost), J.R. Goode and Associates (hydrometallurgical plant<br />

operating costs) and Scott Wils<strong>on</strong> RPA. The costs are shown in Table 18-39 for <strong>the</strong> initial 1,000<br />

tpd operating phase, <strong>the</strong> subsequent expansi<strong>on</strong> to 2,000 tpd and for <strong>the</strong> LOM average. The<br />

operating costs in <strong>the</strong> expansi<strong>on</strong> year were estimated as an average of <strong>the</strong> costs in <strong>the</strong><br />

preceding and following years. The LOM average operating cost per t<strong>on</strong>ne is C$266.92<br />

including mining, processing at site and at <strong>the</strong> hydrometallurgical plant and freight of <strong>the</strong> product<br />

to a point of sale.<br />

Table 18-39 Operating Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Life of Mine 1,000 tpd 2,000 tpd<br />

C$/t milled C$/t milled C$/t milled<br />

Thor Lake<br />

Mining 37.00 43.86 35.88<br />

Processing (Power Removed) 25.85 31.98 24.87<br />

Surface Services 6.54 10.30 6.11<br />

Administrati<strong>on</strong> 11.57 15.76 11.01<br />

Power 28.89 12.23 10.90<br />

Summer Freight 11.47 36.21 27.07<br />

Pine Point<br />

Processing 123.87 137.33 119.88<br />

Surface Services 1.86 4.78 2.26<br />

Administrati<strong>on</strong> 2.56 11.20 10.18<br />

Power 5.46 3.88 5.48<br />

Sales and Marketing 11.86 3.43 1.64<br />

Total Operating Costs 266.92 310.95 255.27<br />

Total Annual Cost 113,497,924 186,349,391<br />

Operating costs is this secti<strong>on</strong>, including <strong>the</strong> costs at Pine Point, when shown <strong>on</strong> a per t<strong>on</strong>ne<br />

basis are per t<strong>on</strong>ne of ore milled at Thor Lake.<br />

Technical Report 43-101 – March 13, 2011 Page 18-117<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.