Table 18-37 C<strong>on</strong>tingency Allowance<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Area<br />

Capital<br />

Cost<br />

(S)<br />

% C<strong>on</strong>tingency<br />

C<strong>on</strong>tingency<br />

Cost ($)<br />

UG Equipment 17,385 18% 3,110<br />

UG Development 24,314 20% 4,919<br />

UG Services 18,745 24% 4,517<br />

Recovery of Stores (cement) -6,000 0%<br />

Mill 128,251 26% 33,191<br />

Thor Lake Tailings 9,093 25% 2,273<br />

Surface Equipment 9,597 21% 1,989<br />

Infrastructure 26,472 25% 6,618<br />

Hydro Met Plant 194,392 25% 48,598<br />

Pine Point Tailings 22,829 25% 5,707<br />

Acid Plant 90,708 10% 9,071<br />

Surface Equipment Pine Point 5,173 20% 1,047<br />

First Fills – Mill 20,457 2% 348<br />

First Fills – Fuel 18,700 0% -<br />

Warehouse Spares 5,324 24% 1,281<br />

Sec<strong>on</strong>d Set C<strong>on</strong>tainers 33,399 5% 1,670<br />

Hydromet Spares and First Fills 3,500 0% -<br />

Recovery of Stores -32,967 0%<br />

Engineering Pine Point &Thor Lake 14,640 25% 3,660<br />

Procurement Pine Point and Thor Lake 8,115 25% 2,029<br />

C<strong>on</strong>structi<strong>on</strong> Management Thor Lake 21,554 25% 5,389<br />

Owners Costs 13,497 25% 3,374<br />

C<strong>on</strong>structi<strong>on</strong> Freight to Thor Lake 6,315 25% 1,579<br />

C<strong>on</strong>structi<strong>on</strong> Management Pine Point 8,978 25% 2,244<br />

Owners Costs Pine Point 7,557 25% 1,889<br />

Sustaining Capital 73,000 0%<br />

C<strong>on</strong>tingency 144,502 144,502<br />

Envir<strong>on</strong>mental B<strong>on</strong>d 11,000 0%<br />

Murphy Royalty Buyout 1,200 0%<br />

Grand Total 899,733 19%<br />

Technical Report 43-101 – March 13, 2011 Page 18-116<br />