30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Income taxes and NWT mining royalties <strong>on</strong> <strong>the</strong> Project are dependent <strong>on</strong> <strong>the</strong> selected<br />

method of depreciati<strong>on</strong> of capital, and may also be reduced by applicati<strong>on</strong> of credits<br />

accumulated by Aval<strong>on</strong>.<br />

• A work-in-process capital allowance has been included in <strong>the</strong> Project cash flow,<br />

representing delays in realizati<strong>on</strong> of revenue from Project products. This delay has been<br />

assumed to average two m<strong>on</strong>ths. As <strong>the</strong> Project is advanced, and commercial terms<br />

established, this assumpti<strong>on</strong> may change, with a corresp<strong>on</strong>ding effect <strong>on</strong> Project<br />

ec<strong>on</strong>omics.<br />

CURRENT PROJECT STATUS<br />

The Nechalacho <strong>deposit</strong> is located <strong>on</strong> <strong>the</strong> Thor Lake property, in Canada’s Northwest<br />

Territories, 100 km sou<strong>the</strong>ast of <strong>the</strong> capital city of Yellowknife within <strong>the</strong> Mackenzie Mining<br />

District. The property c<strong>on</strong>sists of five c<strong>on</strong>tiguous mineral leases and three claims all of which are<br />

in good standing.<br />

Presently Aval<strong>on</strong> is exploring and developing <strong>the</strong> Nechalacho Rare Earth and Rare Metal<br />

<strong>deposit</strong> <strong>on</strong> <strong>the</strong> property by, am<strong>on</strong>g o<strong>the</strong>r activities:<br />

• c<strong>on</strong>ducting <strong>on</strong>-going drill programs with two drills at site both for resource definiti<strong>on</strong> and<br />

collecti<strong>on</strong> of metallurgical samples,<br />

• c<strong>on</strong>tracting metallurgical testwork at <strong>the</strong> bench scale and pilot plant scale,<br />

• commencing a feasibility study, including engineering work, and<br />

• undertaking <strong>the</strong> envir<strong>on</strong>mental permitting process for a mine at <strong>the</strong> locati<strong>on</strong> and a<br />

hydrometallurgical plant in <strong>the</strong> Pine Point area.<br />

RECOMMENDATIONS<br />

The au<strong>thor</strong>s of <strong>the</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g> recommend that Aval<strong>on</strong> advance <strong>the</strong> Thor Lake Project to <strong>the</strong><br />

Feasibility Study stage and c<strong>on</strong>tinue <strong>the</strong> NWT permitting process. Specific recommendati<strong>on</strong>s<br />

by area are as follows.<br />

Geology and Mineral Resources<br />

The au<strong>thor</strong>s make <strong>the</strong> following recommendati<strong>on</strong>s:<br />

• C<strong>on</strong>tinue explorati<strong>on</strong> drilling at <strong>the</strong> Nechalacho Deposit to define <strong>the</strong> new areas of<br />

mineralizati<strong>on</strong>.<br />

• C<strong>on</strong>tinue in-fill drilling to upgrade Indicated Resources to Measured Resources and<br />

upgrade Inferred Resources to Indicated Resources.<br />

Technical Report 43-101 – March 13, 2011 Page 1-8<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!