Table 18-36 Indirect Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$ '000<br />

Engineering (Pine Point and Thor Lake) 14,640<br />

Procurement (Pine Point and Thor Lake) 8,115<br />

C<strong>on</strong>structi<strong>on</strong> Management (Thor Lake) 21,554<br />

Owners Costs 13,497<br />

C<strong>on</strong>structi<strong>on</strong> Freight to Thor Lake 6,315<br />

C<strong>on</strong>structi<strong>on</strong> Management (Pine Point) 8,978<br />

Owners Costs (Pine Point) 7,557<br />

Total 80,657<br />

The procurement for <strong>the</strong> <strong>project</strong> is forecast to extend over a two year period with a crew of eight<br />

working <strong>on</strong> purchasing, expediting, payables and some level of freight handling. The<br />

c<strong>on</strong>structi<strong>on</strong> management at Thor Lake is forecast to include a staff of eight management<br />

pers<strong>on</strong>nel for a two year period. After c<strong>on</strong>structi<strong>on</strong> some of <strong>the</strong> pers<strong>on</strong>nel will c<strong>on</strong>tinue <strong>on</strong> with<br />

operati<strong>on</strong>s. Supervisor salary rates for this period reflect <strong>the</strong> overtime in a remote c<strong>on</strong>structi<strong>on</strong><br />

effort.<br />

The c<strong>on</strong>structi<strong>on</strong> support crew are <strong>the</strong> employees to operate cranes, forklifts and trucks and to<br />

serve as labourers to support <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> efforts. This is a crew of six whose salaries are<br />

based up<strong>on</strong> overtime schedules. The cost estimate includes numerous c<strong>on</strong>structi<strong>on</strong> support<br />

items that would in a less remote locati<strong>on</strong> be rented or provided by subc<strong>on</strong>tractors as required.<br />

The Owners costs include an Owner’s team of 15 staff for a full year prior to <strong>the</strong> commencement<br />

of operati<strong>on</strong>s. Travel for <strong>the</strong> team R&R is included. Charter air craft flights to <strong>the</strong> site from<br />

Yellowknife are include <strong>on</strong> <strong>the</strong> basis of two flights per week over a two year period, <strong>the</strong> rate is<br />

suitable for a Twin Otter or King Air aircraft. The Twin Otter offers a larger payload and more<br />

pers<strong>on</strong>nel capacity.<br />

Catering for <strong>the</strong> site crews will be c<strong>on</strong>tracted and handled by <strong>the</strong> Owner. The catering estimate<br />

is based <strong>on</strong> 100 men <strong>on</strong> site for two full years at a rate of C$40.64 per man day based <strong>on</strong> recent<br />

camp operating costs for similar size camps. Camp power is included as a 500 kW draw for<br />

camp operati<strong>on</strong>s over a two year period at a cost of C$0.24/kW-hr.<br />

Employee inducti<strong>on</strong> and safety training is proposed by Aval<strong>on</strong> and <strong>the</strong> cost of a 40 hour course<br />

for an estimated 150 total staff at an average cost of C$30 per hour. In additi<strong>on</strong> a labour cost<br />

for operating pers<strong>on</strong>nel brought to site in advance of <strong>the</strong> “start up” has been included. The<br />

Technical Report 43-101 – March 13, 2011 Page 18-114<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.